Energy Code:
NFCU - Atlantic Village
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed
Watts
1-Common Space Types:Sales Area 3965 1.59 6304
6304Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixture
Common Space Types: Sales Area (3965 sq.ft.)
LED: L1A/L1B: LED Panel 40W:1 9 38 346
LED: L2A/L2B: LED Panel 33W:1 23 26 605
LED: L2C: LED Panel 33W:1 3 26 79
LED: L3A: LED Other Fixture Unit 40W:1 12 40 475
LED: L4A/L4B: LED Other Fixture Unit 60W:1 17 59 1010
LED: L5A: LED Other Fixture Unit 36W:1 3 31 94
LED: L6A/L6B: LED Other Fixture Unit 90W:1 9 89 804
LED: L6C: Other:1 2 796 1593
LED: L7: LED Undercabinet Unit 11.4W:1 3 11 34
LED: L8: Other:1 2 15 30
LED: L9: Other:1 3 26 78
5147Total Proposed Watts =
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2020 Florida Building Code, Energy Conservation requirements in COMcheck Version
COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Interior Lighting PASSES
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
81 ofPage
Name - Title Signature Date
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
82 ofPage
James Payne - Electrical designer 09/10/2021
COMcheck Software Version COMcheckWeb
Exterior Lighting Compliance Certificate
Project Title:
2020 Florida Building Code, Energy Conservation
Project Type:Alteration
Construction Site:
961 Atlantic Blvd.
Atlantic Beach, Florida 32233
Owner/Agent:Designer/Contractor:
James Payne
Pursuit Engineering
4910 Browns Bridge Road
Cumming, Georgia 30041
678-948-6637
info@PursuitEngineering.com
Project Information
Energy Code:
NFCU - Atlantic Village
3 (Other (LZ3))Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts /
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Free standing/attached sales canopy 700 ft2 0.6 Yes 420
ATM/Night depository location (c)2 45 No 225
Illuminated area of facade wall or surface 40 ft2 0.11 No 5
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
420
650
500
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable
areas/surfaces.
(c)ATM/Night depository sites have a base allowance of 180 W per site.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixture
Free standing/attached sales canopy (700 ft2): Tradable Wattage
LED: E1/E1A: Other:1 5 35 175
ATM/Night depository location (2 machines): Non-tradable Wattage
LED: E2: LED Other Fixture Unit 36W:1 1 29 29
Illuminated area of facade wall or surface (40 ft2): Non-tradable Wattage
LED: E3: LED Other Fixture Unit 36W:1 1 29 29
175Total Tradable Proposed Watts =
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
83 ofPage
Exterior Lighting Compliance
Statement
Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting
systems have been designed to meet the 2020 Florida Building Code, Energy Conservation requirements in COMcheck Version
COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
84 ofPage
James Payne - Electrical designer 09/10/2021
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version COMcheckWeb
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2020 Florida Building Code, Energy Conservation
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
85 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.2.
2
[EL22]1
Spaces required to have light-
reduction controls have a manual
control that allows the occupant to
reduce the connected lighting load in
a reasonably uniform illumination
pattern >= 50 percent.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1,
C405.2.1.
1
[EL18]1
Occupancy sensors installed in
classrooms/lecture/training rooms,
conference/meeting/multipurpose
rooms, copy/print rooms,
lounges/breakrooms, enclosed offices,
open plan office areas, restrooms,
storage rooms, locker rooms,
warehouse storage areas, and other
spaces <= 300 sqft that are enclosed
by floor-to-ceiling height partitions.
Reference section language
C405.2.1.2 for control function in
warehouses and section C405.2.1.3
for open plan office spaces.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1.
2
[EL19]1
Occupancy sensors control function in
warehouses: In warehouses, the
lighting in aisleways and open areas is
controlled with occupant sensors that
automatically reduce lighting power
by 50% or more when the areas are
unoccupied. The occupant sensors
control lighting in each aisleway
independently and do not control
lighting beyond the aisleway being
controlled by the sensor.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1.
3
[EL20]1
Occupant sensor control function in
open plan office areas: Occupant
sensor controls in open office spaces
>= 300 sq.ft. have controls 1)
configured so that general lighting can
be controlled separately in control
zones with floor areas <= 600 sq.ft.
within the space, 2) automatically turn
off general lighting in all control zones
within 20 minutes after all occupants
have left the space, 3) are configured
so that general lighting power in each
control zone is reduced by >= 80% of
the full zone general lighting power
within 20 minutes of all occupants
leaving that control zone, and 4) are
configured such that any daylight
responsive control will activate space
general lighting or control zone
general lighting only when occupancy
for the same area is detected.
Complies
Does Not
Not Observable
Not Applicable
C405.2.2,
C405.2.2.
1,
C405.2.2.
2
[EL21]2
Each area not served by occupancy
sensors (per C405.2.1) have time-
switch controls and functions detailed
in sections C405.2.2.1 and C405.2.2.2.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
86 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL23]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting. See code section C405.2.3
Daylight-responsive controls for
applicable spaces, C405.2.3.1 Daylight
responsive control function and
section C405.2.3.2 Sidelit zone.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL26]1
Separate lighting control devices for
specific uses installed per approved
lighting plans. 1. Display and accent
lighting, lighting in display cases,
supplemental task lighting and
lighting equipment for sale shall have
occupancy sensor control. 2) Sleeping
units shall have auto off controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.5
[EL28]3
Manual lighting controls are in a
location with ready access and where
controlled lights are visible.
Complies
Does Not
Not Observable
Not Applicable
C405.2.6
[EL30]3
Exterior lighting systems provided
with controls complying with
C405.2.6.1 through C405.2.6.4 for
daylight shutoff and decorative
lighting shutoff.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
87 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
C405.3.2
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C405.4.2
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
NFCU - Atlantic Village 09/10/21Report date:
88 ofPage