Inspection Card 2.23.18Final Plumbing
Final Electrical
Final HVAC
CC Final
Final Building*
Swimming Pool Steel
Swimming Pool Safety
Electrical Grounding & Bonding
Swimming Pool Final (Bldg)
Swimming Pool Final (PW)
Formed Columns/ Beams*
Masonry Cell Fill
Structural Steel*
OTHER:
OTHER:
OTHER:
OTHER:
OTHER:
Power Pole
Silt Fence
Piers/ Stem Walls
Underground Plumbing
Underground Electric
Foundation/ Footing
Slab**
Retaining Wall Footing
Driveway
Sewer (Building Dept)
Sewer Tap (Utilities Dept)
Rough Electric*
Rough Plumbing/ Top Out*
Rough Mechanical*
House Wrap
Wall Sheathing
Roof Sheathing
Tie-down Framing Connections
Rough Framing
Roofing In Progress
Window/Door In-Progress
Insulation Ceiling
Insulation Wall
Exterior Lath
Stucco Scratch Coat
Exterior Siding In-Progress
Brick Flashing & Ties
Early Power
Gas Rough
Gas Final*
* When all rough electric, plumbing, mechanical are complete but before any work is
covered up.
* When all gas piping is complete and wallboard is installed but before gas is
attached to any appliance. All outlets must be capped and pipe pressurized at a
minimum of 15 lbs.
* For new living space: When all construction work including electrical, plumbing,
mechanical, exterior finish, grading, required paving and landscaping is complete
and the building is ready for occupancy, but before being occupied
Additional inspections may apply to your project if your project
contains these elements:
INSPECTIONS REQUIRED FOR BUILDING PERMITS
To verify compliance with building codes, inspections of the work authorized are required at various points of the construction.
The following inspections are typically required for residential projects:
Date: Initial: Date: Initial:
_____________________________________________________
Permit Type
____________________________________________________
Permit No.
__________________________________________________________
Job Address
____________________________________________________
Contractor
POST THIS CARD WITH PERMITS AND PERMIT
DOCUMENTATION IN FRONT OF BUILDING
Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends
Building Department Public Works/Utilities Fire Department
Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789
Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203
* When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all
electrical, plumbing and mechanical work is in place, but before concrete is poured.
* When all structural steel members are in place and all connections are complete,
but before such work is covered or concealed.
** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION