Loading...
763 Atlantic Blvd COMM22-0038 DRAWINGS reduced 1844 4 4 4 44 4 4 4 WAITING RECEPTION CONSULT RETAIL AREA SECURE STORAGE WORK AREA MENS WOMENS JANITOR UTILITY BREAK AREA OFFICE HALLWAY PANEL "A" WAITING A-1,3 A-18 A-5 A-5 A-5 A-7 A-7 A-7 A-38 A-38 A-11 A-11 A-11 A-11 A-17 A-13 +18" A-19 +18" GFI A-13 +18" GFI A-13 +18" GFI A-13 +18" GFI A-23 +18" A-23 +18" A-23 +18" A-23 +48" GFI A-23 +48" A-25+48"A-29+18" A-35 +18" A-31 +48"+48" A-31 +48" +48" A-35 +18" A-35+18" A-35+18" A-35+18" A-37+48" +48" A-37 +48" +48" A-41 +18" A-41+18" A-41 +18" A-41 +18" A-41+18" RTU-1 ON ROOF EF-1 ON ROOFA-24 A-20 A-36A-26,28,30 GFI/WP M/WP +18" GFI GFI C/T CP-1 A-32 CONTRACT DATE: BUILDING TYPE: PLAN VERSION: BRAND DESIGNER: SITE NUMBER: STORE NUMBER: FLUENT 763 ATLANTIC BLVD. ATLANTIC BEACH, FL 32233 06/13/22 ARCVISION: 220224 C A N N A B I S C A R E E1.0 ELECTRICAL POWER PLAN ) E 1/4" = 1'-0"POWER PLAN A NOT 86E' POWER PLAN *ENERAL NOTE6 %POWER PLAN .E<E' NOTE6 A. CONTRACTOR SHALL COORDINATE QUANTITY AND FINAL LOCATION OF ALL TVS WITH OWNER PRIOR TO CONSTRUCTION. B. PROVIDE WORKING CLEARANCE AT ALL ELECTRICAL PANELS PER NEC. C. COORDINATE WITH LOW-VOLTAGE VENDOR FOR EXACT LOCATIONS AND REQUIREMENTS REGARDING ALL POS, SECURITY, IT, AND OTHER LOW VOLTAGE ITEMS. D. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND HEIGHTS OF ALL FIXTURES. E. OUTLETS FOR WORKSTATIONS AND POS STATIONS SHOULD BE MOUNTED JUST UNDER THE MONITOR SHELVES OR UNDER THE TABLES AND PHONE COUNTER. F. ALL CONDUITS SHALL BE CONCEALED IN WALLS OR ABOVE CEILINGS. WHERE CONDUIT CAN'T BE CONCEALED IT MUST BE PAINTED TO MATCH WALL COLORS. G. SEE SYMBOLS LEGEND FOR ADDITIONAL INFORMATION. H. WHEN REUSING EXISTING PANELS, E.C. SHALL VERIFY THE CONDITION AND QUANTITY OF ALL EXISTING CIRCUIT BREAKERS. REPLACE DAMAGED BREAKERS WITH NEW. PROVIDE ANY ADDITIONAL OR BREAKERS OF DIFFERENT AMPERAGE OR POLE AS REQUIRED TO MEET THE END RESULT INDICATED IN THE PANEL SCHEDULE. NEW BREAKERS SHALL BE OF THE SAME MFG AND CHARACTERISTICS OF THE EXISTING. THE SUBMISSION OF THE BID PROPOSALS SHALL BE CONSIDERED EVIDENCE THAT THE CONTRACTORS HAVE VISITED THE SITE. NO EXTRA PAYMENTS WILL BE ALLOWED TO THESE CONTRACTORS ON ACCOUNT OF EXTRA WORK MADE NECESSARY BY HIS FAILURE TO VISIT THE SITE. I. CONTRACTOR SHALL TRACE OUT ALL EXISTING CIRCUITRY AND DETERMINE IF IS NEEDED. IF CIRCUIT IS NOT NEEDED CONTRACTOR SHALL REMOVE ALL WIRING AND DEVICES TO NEAREST JUNCTION BOX, CAP AND LABEL WIRING AND COVER EXISTING BOX WITH A BLANK PLATE. J. EXISTING CIRCUITRY SHALL BE VERIFIED IN FIELD PRIOR TO START OF WORK. A''ITIONAL NOTE6 1. EC TO VERIFY EXISTING EQUIPMENT TO REMAIN. PROTECT EQUIPMENT DURING CONSTRUCTION. 2. PROVIDE REQUIRED WORKING SPACE/CLEARANCE FOR ELECTRICAL PANEL PER N.E.C.. CONTRACTOR TO CLEARLY IDENTIFY/INDICATE NOT LESS THAN 30"Wx36"D CLEARANCE AREA/ WORKING SPACE (PER IFC 605.3). IF EQUIPMENT IS LARGER THAN 30" WIDE, WORKING SPACE/CLEARANCE SHALL NOT BE LESS THAN EQUIPMENT WIDTH. 3. POS RECEPTACLE AND DATA RAN IN CASEWORK; CONTRACTOR SHALL COORDINATE WITH ARCHITECT AND OWNER FOR EXACT LOCATION, HEIGHT, AND REQUIREMENTS PRIOR TO ROUGH IN. 4. RECEPTACLE AND DATA FOR VIDEO SCREEN. CONTRACTOR SHALL COORDINATE WITH ARCHITECT AND OWNER FOR EXACT LOCATION, HEIGHT, AND REQUIREMENTS PRIOR TO ROUGH IN. 5. JUNCTION BOX FOR TERMINATION TO FLUENT CANNABIS SIGN. FIELD VERIFY THE EXACT MOUNTING LOCATION AND CONNECTION REQUIRED, PRIOR TO ROUGH-IN. PROVIDE SIGN DISCONNECT SWITCH, IF REQUIRED. INSTALL PER N.E.C. ARTICLE 600 SIGNS. 6. NEW LOCATION FOR EXISTING WATER HEATER. CONTRACTOR SHALL EXTEND BRANCH CIRCUIT, CONDUIT, AND ALL ASSOCIATED MATERIALS TO MAKE A SAFE OPERATIONAL SYSTEM AT NEW WATER HEATER LOCATION AND PER N.E.C. REQUIREMENTS. 7. PROVIDE AN UNDER-FLOOR TRENCH BETWEEN LOW-WALL AND BACK OF HOUSE WALL, AS SHOWN. COORDINATE WITH OTHER DISCIPLINES WORK AS NEEDED TO NOT DISTURB OTHERS WORK. CONTRACTOR TO FIELD-VERIFY THE EXACT NUMBER OF CONDUITS REQUIRED FOR P.O.S. POWER/COMMUNICATIONS. INSTALL BELOW-GRADE PER BURIAL REQUIREMENTS IN THE N.E.C. AND SEALED PER THE U.L. LISTING FOR THE ENVIRONMENT ENCOUNTERED. 8. PROVIDE A 3/4" CONDUIT FOR POWER AND A 3/4" CONDUIT FOR COMMUNICATION TO COUNTER. PROVIDE TRANSITION AND STUB-UP INTO COUNTER MILLWORK. EXTEND AND SECURE WIREWAY(S) ALONG THE BACK OF CABINET. MAKE FINAL CONNECTIONS TO OUTLETS AT JUNCTION BOXES. COORDINATE WITH MILLWORK CONTRACTOR FOR "STUB-THRU" LOCATIONS. 9. NEW ROOFTOP UNIT (RTU-1). EC TO PROVIDE 60A, 208V, 3P, NON-FUSED, WEATHERPROOF DISCONNECT SWITCH. SEE PANEL SCHEDULE ON SHEET E3.0 FOR WIRE SIZES. COORDINATE ALL REQUIREMENTS WITH HVAC CONTRACTOR PRIOR TO BID. 10. EC TO PROVIDE GFI WEATHERPROOF DUPLEX RECEPTACLE AT HVAC EQUIPMENT. 11. PROVIDE CONNECTION FROM AIR DUCT SMOKE DETECTORS TO MECHANICAL CONTROL CIRCUIT. COORDINATE ALL REQUIREMENTS WITH HVAC CONTRACTOR PRIOR TO BID. 12. PROVIDE 20A, 120V, WEATHERPROOF TOGGLE SWITCH DISCONNECT FOR EF-1. COORDINATE LOCATION WITH MANUFACTURER. CIRCUIT THROUGH TIMECLOCK FOR OPERATION ONLY DURING OCCUPIED HOURS. 13. PROVIDE A TIMECLOCK FOR CIRCULATING PUMP CONTROL AND TOGGLE SWITCH DISCONNECT. TIMECLOCK SHALL BE WIRED AHEAD OF DISCONNECT. MOUNT ON WALL ADJACENT TO WATER HEATERS. C N TRUE N PROJECT 'NOT 86E' FIRE ALARM: AS REQUIRED, IT SHALL BE THE GENERAL CONTRACTORS RESPONSIBILITY TO ENGAGE THE SERVICES OF AN APPROVED FIRE ALARM CONTRACTOR. THE FIRE ALARM CONTRACTOR SHALL BE REQUIRED TO PROVIDE DRAWINGS, SPECIFICATIONS & INSTALLATION ACCORDING TO MUNICIPALITIES GUIDELINES. FIRE ALARM SERVICE MAY ALSO INCLUDE PROVIDING FIRE ALARM MONITORING TO BUILDING'S INSTALLED FIRE ALARM CONTROL SYSTEM. FIRE ALARM CONTRACTOR TO PROVIDE COMPATIBLE DEVICES & ALL BRACING, WIRING, ETC. COORDINATE WITH LANDLORD'S FIRE ALARM CONTRACTOR FOR DETAILS. EQUIPMENT: THE EQUIPMENT AND DIMENSIONED LOCATIONS FOR CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, BUT SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, EQUIPMENT ROUGH-IN DRAWINGS, AND/OR THE OWNER. IN SOME INSTANCES, THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR THE EQUIPMENT MAY VARY FROM WHAT IS SHOWN ON THE PLAN. THE ARCHITECT/ENGINEER SHALL BE IMMEDIATELY NOTIFIED, PRIOR TO CONSTRUCTION, OF ANY DEVIATIONS FROM WHAT IS SHOWN OR IMPLIED ON THESE DRAWINGS. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THE CONTRACTOR. FLORIDA BUILDING CODE REQUIREMENT - ENERGY CONSERVATION: WITHIN 30-DAYS AFTER DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER, INCLUDING: 1. A SINGLE-LINE DIAGRAM OF BUILDING ELECTRICAL SYSTEM AND 2. FLOOR PLAN INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION. AN OPERATIONS MANUAL AND MAINTENANCE MANUAL BE PROVIDED TO THE BUILDING OWNER, THE MANUALS SHALL INCLUDE AT MINIMUM, THE FOLLOWING: 3. SUBMITTAL DATA STATING THE EQUIPMENT RATINGS AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. 4. OPERATIONS MANUAL AND MAINTENANCE MANUAL FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED. 5. NAMES AND ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY. PRIOR TO PASSING FINAL INSPECTION, THE REGISTERED DESIGN PROFESSIONAL/INSTALLER SHALL PROVIDE EVIDENCE THAT THE LIGHTING CONTROL SYSTEM HAVE BEEN TESTED TO ENSURE THAT CONTROL HARDWARE AND SOFTWARE ARE CALIBRATED, ADJUSTED, PROGRAMMED AND IN PROPER WORKING CONDITION IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS AND MANUFACTURES INSTRUCTIONS. FUNCTIONAL TESTING SHALL BE IN ACCORDANCE WITH SECTIONS C408.3.1.1 & C408.3.1.3 FOR APPLICABLE CONTROL TYPE. 8/22/22