Loading...
Ahern ProjectAhern St –Complete Streets(from E. Coast to Ocean Blvd.) Option #1 (recommended) •8’ multiuse path on north side –vehicles @ the NWC still able to park in existing parking spaces •6’ sidewalk on south side with angled parking •Adds 8-9 angled parking spaces on south side of ROW. (note now the westerly driveway entrance on Ahern will be closed for the Ragtime parking lot reconfiguration) Option #2 (Bike lane on north side) •4’ sidewalk on the north side with a 4’ bike lane (currently would be the only area in the city with a bike lane). Based on field mtg. and survey consultant reduced sidewalk fro 5’ to 4’ accommodate parking at the NWC (area circled in red) •4’ sidewalk on south side -Upon review would reduce down from 5’ sidewalk to 4’ to continue to all parking at the NWC •Adds 7 spaces (note now the westerly driveway entrance on Ahern will be closed for the Ragtime parking lot reconfiguration) Option #3 (8’ Shared path on both sides) •8’ multiuse path on north side (vehicles @ the NWC will block (overhang) on sidewalk) –area circled in red •8’ multiuse path on south side •Adds 7 spaces (note now the westerly driveway entrance on Ahern will be closed for the Ragtime parking lot reconfiguration)