Ahern ProjectAhern St –Complete Streets(from E. Coast to Ocean Blvd.)
Option #1 (recommended)
•8’ multiuse path on north side –vehicles @ the NWC still able to park in existing
parking spaces
•6’ sidewalk on south side with angled parking
•Adds 8-9 angled parking spaces on south side of ROW. (note now the westerly driveway entrance on
Ahern will be closed for the Ragtime parking lot reconfiguration)
Option #2 (Bike lane on north side)
•4’ sidewalk on the north side with a 4’ bike lane (currently would be the only
area in the city with a bike lane). Based on field mtg. and survey consultant reduced sidewalk
fro 5’ to 4’ accommodate parking at the NWC (area circled in red)
•4’ sidewalk on south side -Upon review would reduce down from 5’ sidewalk to 4’ to
continue to all parking at the NWC
•Adds 7 spaces (note now the westerly driveway entrance on Ahern will be closed for the
Ragtime parking lot reconfiguration)
Option #3 (8’ Shared path on both sides)
•8’ multiuse path on north side (vehicles @ the NWC will block (overhang) on
sidewalk) –area circled in red
•8’ multiuse path on south side
•Adds 7 spaces (note now the westerly driveway entrance on Ahern will be closed for the Ragtime
parking lot reconfiguration)