96-05 v RESOLUTION 96-5
A RESOLUTION OF THE CITY OF ATLANTIC BEACH
EXPRESSING SUPPORT FOR THE ATLANTIC BOULEVARD
MEDIAN BEAUTIFICATION PROJECT AND AUTHORIZING THE
CITY MANAGER AND HIS STAFF TO ENTER INTO A HIGHWAY
BEAUTIFICATION GRANT MEMORANDUM OF AGREEMENT
WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION.
WHEREAS, many median strips within the Department of Transportation
Right-of-Way of Atlantic Boulevard must be maintained and landscaped; and
WHEREAS, the Mayor and City Commission desire to beautify and improve
these Right-of-Way medians with landscaping; and
WHEREAS, the Mayor and City Commission of the City of Atlantic Beach
wish to authorize the City Manager to enter into a Highway Beautification Grant
Memorandum of Agreement between the city and the Florida Department of
Transportation;
NOW THEREFORE, BE IT RESOLVED by the City Commission of The City
of Atlantic Beach;
Section 1. The City Manager is hereby authorized to enter into a
Highway Beautification Grant Memorandum of Agreement between the City of
Atlantic Beach and the Florida Department of Transportation.
Section 2. The City Clerk of the City of Atlantic Beach is hereby di;ected
to send copies of this resolution to the Department of Transportation and to all
other persons as directed by the Mayor and City Commissioners.
APPROVED AND ADOPTED by the City Commission of the City of Atlantic
Beach, Florida at regular meeting this 12th day of February, 1996.
ATTEST:
I Y CLERK a Lyman Fletcher, Mayor
,PPRO V i._1 AS TO FORM.
'tta Lt
City,mey
•
ATLANTIC BOULEVARD - U.S. 10 MEDIAN PLANTING
Estimated Maintenance Estimate
Atlantic Boulevard
From: Mayport Overpass; Station 100 + 00.00
To: Third Street; Station 161 + 00.00
Size of Project
6,100 LF or 1.15 miles
Shrub and Groundcover Acreage 24,318 SF = .56 AC
Turf Acreage 37,809 SF = .86 AC
Total Acreage 1.42 AC
Mowing/Edging/Weeding
April - September one cycle/2 weeks = 13 cycles
October-March one cycle/1 month = 6 cycles
4 man crew at $120/hr. X 8 hrs = $960/cycle
$960 x 19 cycles = $18,240 $18,240.00
Fertilization Estimate
1.42 AC/62,127 SF Total turf and shrub area
1.42 AC at $425/AC = $605.00/cycle
2 cycles/year at $605.00 = $1,210.00 $1,210.00
Litter Removal
Adopt a Highway Groups, Private Maintenance Contract, Chain Gangs $0.00
Maintenance Crew
Water Estimate
1 cycle = 13,605 gal. or 1,818 CF
2 cycles/wk - October-March = 52 cycles
3 cycles/wk - April-September = 78 cycles
130 cycles/yr at 13,605 gal./cycle = 1,768,650 gal./year
or
130 cycles/yr at 1,818 CF/cycle = 236,340 CF/year
Municipal Water Rate at $.15/CF x 236,340 CF $35,451.00
Plant Replacement/Year
250 plants/year at $2.25 $563.00
Total Annual Estimated Project Maintenance $55,464.00
a: R15401%96ti115
• •
The following data are for use by the Council in ranking the project applications.
County: Duval
City: City of Atlantic Beach
Local Name: Atlantic Boulevard
U.S./S.R. #: S.R. 10
Length of Project: 6,100 feet; 1.15 miles
From: Mayport Road Overpass
To: Third Street (Al A)
SUMMARY OF ELIGIBLE GRANT PROJECT COST
Wildflowers $560.00
Plant Material $136,146.00
Earthwork/Soil Amendment $8.250.00
TOTAL ELIGIBLE COST $144,956.00
SUMMARY OF APPLICANT MATCHING PROJECT COST
Plant Material $17,280.00
Water, Mulch, Fertilizer $30,919.00
Labor $45,429.00
Irrigation System $43,100.00
Project Cost $9,242.00
Site Preparation $6.429.00
TOTAL APPLICANT MATCHING COST $152,399.00
TOTAL PROJECT COST $299,355.00