770 Amberjack Ln RESO24-0053 770 Amberjack - Porch Enclosure Energy Calcs REV 06.27.2024FORM R405-2023
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2023 Florida Building Code, Energy Conservation via the
Residential Simulated Performance Alternative shall include:
This checklist
Form R405-2023 report
Input summary checklist that can be used for field verification (usually four pages/may be greater)
Energy Performance Level (EPL) Display Card (one page)
HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
Mandatory Requirements (five pages)
Required prior to CO:
Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page)
A completed 2023 Envelope Leakage Test Report (usually one page); exception in R402.4
allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to
comply with Section C402.5
Testing is not required for additions in which the new construction is less than 85%
of the thermal envelope. (R402.4.1.2, Florida Energy Code)
If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
2023 Duct Leakage Test Report - Performance Method (usually one page)
.
6/14/2024 1:13:22 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 1 of 1
FORM R405-2023
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: A1A Heat and Air 770 Amberjack Lane Builder Name: Bachmann Homes
Street: 770 Amberjack Lane Permit Office: D u v a l
City, State, Zip: Atlantic Beach , FL, 32233 Permit Number:
Owner: Jurisdiction: 261100
Design Location: FL, Jacksonville County: Duval(Florida Climate Zone 2)
1. New construction or existing Addition
2. Single family or multiple family Detached
3. Number of units, if multiple family 1
4. Number of Bedrooms 0
5. Is this a worst case?No
6. Conditioned floor area above grade (ft²)144
Conditioned floor area below grade (ft²)0
7. Windows(60.0 sqft.) Description Area
a. U-Factor:Dbl, U=0.33 60.00 ft2
S H G C : SHGC=0.23
b. U-Factor: N/A f t2
S H G C :
c. U-Factor: N/A f t2
S H G C :
Area Weighted Average Overhang Depth: 4.333 ft
Area Weighted Average SHGC: 0.230
8. Skylights Description Area
U - F a c t o r : ( A V G ) N/A N/A ft2
S H G C ( A V G ) : N/A
9. Floor Types I n s u l a t i o n Area
a. Slab-On-Grade Edge Insulation R= 0.0 144.00 f t2
b. N/A R = f t2
c. N/A R = f t2
10. Wall Types(288.0 sqft.) I n s u l a t i o n Area
a. Frame - Wood, Exterior R=13.0 288.00 ft
2
b. N/A
c. N/A
d. N/A
11. Ceiling Types(144.0 sqft.) I n s u l a t i o n Area
a. Single assembly, with (Vented) R=30.0 144.00 ft
2
b. N/A
c. N/A
12. Roof(Comp. Shingles, Vented) Deck R=0.0 144 ft
2
13. Ducts, location & insulation level R ft2
a .
b .
c .
14. Cooling Systems k B t u / h r Efficiency
a. Central Unit 9.0 SEER2:16.00
15. Heating Systems k B t u / h r Efficiency
a. Electric Heat Pump 9.0 HSPF2:8.50
16. Hot Water Systems - None required
a. N/A N/A
b. Conservation features
17. Credits Pstat
Glass/Floor Area:0.417 Total Proposed Modified Loads: 5.44
Total Baseline Loads: 5.73 PASSNOTE: Proposed residence must have annual total normalized Modified Loads that are less than or equal to 95 percent of the annual total loads of the standard reference design in order to comply.
I hereby certify that the plans and specifications covered by Review of the plans and
this calculation are in compliance with the Florida Energy specifications covered by this
Code. calculation indicates compliance
with the Florida Energy Code.
PREPARED BY: _________________________________ Before construction is completed
this building will be inspected for
DATE: _________________________________________ compliance with Section 553.908
Florida Statutes.
I hereby certify that this building, as designed, is in compliance
with the Florida Energy Code.
OWNER/AGENT: __________________________________ BUILDING OFFICIAL: ____________________________
DATE: _________________________________________ DATE: _________________________________________
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
- Homes without ducts do not require duct testing.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires a PERFORMANCE envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
(Exception may apply)
6/14/2024 1:13:26 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 1
Edward Wolfe
2024.06.14 13:33:53 -04’00
6/17/2024
FORM R405-2023 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: A1A Heat and Air 770 Amberjack Lane Address type: Street Address
Building Type: Bedrooms: Lot #:User 0 ---
Owner: Conditioned Area: Block/SubDivision:144 ---
Builder Home ID: Total Stories: PlatBook:1 ---
Builder Name: Worst Case: Street:Bachmann Homes No 770 Amberjack Lane
Permit Office: Rotate Angle: County:D u v a l 0 Duval
Jurisdiction: Cross Ventilation: City, State, Zip:261100 Atlantic Beach ,
Family Type: Whole House Fan:Detached FL, 32233
New/Existing: Terrain:Addition Suburban
Year Construct: Shielding:2024 Suburban
Comment:
CLIMATE
Design Design Temp Int Design Temp Heating Design Daily temp
Location Tmy Site 97.5% 2.5% Winter Summer Degree Days Moisture Range
___ FL, Jacksonville FL_JACKSONVILLE_INTL_A 32 93 70 75 1281 49 Medium
BLOCKS
Number Name Area Volume
___ 1 Block1 144 1152 cu ft
SPACES
Number Name Area Volume Kitchen Occupants Bedrooms Finished Cooled Heated
___ 1 Main 144 1152 No 0 Yes Yes Yes
FLOORS (Total Exposed Area = 144 sq.ft.)
# Floor Type Space Exposed Area R-Value U-Factor Slab Insul. Tile Wood Carpet
Perim(ft) Perim. Joist Vert/Horiz
___ 1 Slab-On-Grade Edge Ins Main 36 144 sqft 0 --- 0.304 0 (ft)/0 (ft) 0.00 0.00 1.00
ROOF
Roof Gable Roof SolarRad SA Emitt Emitt Deck Pitch
# Type Materials Area Area Color Absor.Barr Tested Tested Insul. (deg)
___ 1 Flat Composition shingles 144 ft² 6 ft² Medium N 0.75 No 0.9 No 0 4.76
ATTIC
# Type Ventilation Vent Ratio (1 in) Area RBS IRCC
___ 1 No attic Vented 300 144 ft² N N
CEILING (Total Exposed Area = 144 sq.ft.)
# Ceiling Type Space R-Value Ins. Type Area U-Factor Framing Frac. Truss Type
___ 1 Single assembly, with airspace(Vented) Main 30.0 Batt 144.0ft² 0.055 0.11 Wood
6/14/2024 1:13:26 PM Page 2EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software
FORM R405-2023 INPUT SUMMARY CHECKLIST REPORT
WALLS (Total Exposed Area = 288 sq.ft.)
Adjacent Cavity Width Height Area U- Sheath Frm. Solar Below
# Ornt To Wall Type Space R-Value Ft In Ft In sq.ft. Factor R-Value Frac. Absor. Grade
___ 1 SE Exterior Frame - Wood Main 13.0 12.0 0 8.0 0 96.0 0.092 0.2 0.30 0 %
___ 2 SW Exterior Frame - Wood Main 13.0 12.0 0 8.0 0 96.0 0.092 0.2 0.30 0 %
___ 3 NW Exterior Frame - Wood Main 13.0 12.0 0 8.0 0 96.0 0.092 0.2 0.30 0 %
WINDOWS (Total Exposed Area = 60 sq.ft.)
Wall Total Same Width Height --Overhang--
# Ornt ID Frame Panes NFRC U-Factor SHGC Imp Storm Area Units (ft) (ft) Depth Sep. Interior Shade Screen
(ft²) (ft) (ft)
___ 1 SE 1 Vinyl Low-E Double Y 0.33 0.23 N N 20.0 1 3.00 6.67 11.0 1.3 Drapes/blinds None
___ 2 SW 2 Vinyl Low-E Double Y 0.33 0.23 N N 24.0 2 3.00 4.00 1.0 1.3 Drapes/blinds None
___ 3 SW 2 Vinyl Low-E Double Y 0.33 0.23 N N 16.0 1 4.00 4.00 1.0 1.3 Drapes/blinds None
INFILTRATION
# Scope Method SLA CFM50 ELA EqLA ACH ACH50 Space(s) Infiltration Test Volume
___ 1 Wholehouse Proposed ACH(50) 0.00036 134 7.37 13.84 0.1372 7.0 1152 cu ftAll
MASS
# Mass Type Area Thickness Furniture Fraction Space
___ 1 Default(8 lbs/sq.ft.) 0 ft² 0 ft 0.30 Main
HEATING SYSTEM
# System Type/Fl. Addition Subtype/Speed AHRI # Efficiency Capacity ----Geothermal HeatPump---- Ducts Block
kBtu/hr Entry Power Volt Current
___ 1 Electric Heat Pump/Supplementa Split/Single HSPF2: 8.50 9.0 0.00 0.00 0.00 sys#0 1
COOLING SYSTEM
# System Type/Fl. Addition Subtype/Speed AHRI # Efficiency Capacity Air Flow SHR Duct Block
kBtu/hr cfm
___ 1 Central Unit/Supplementa Split/Single SEER2:16.0 9.0 300 0.85 Ductless 1
HOT WATER SYSTEM
# System Type Subtype Location EF(UEF) Cap Use SetPnt Fixture Flow Pipe Ins. Pipe length
Recirculation Recirc Control Loop Branch Pump DWHR Facilities Equal DWHR Other Credits
System Type length length power Connected Flow Eff
6/14/2024 1:13:26 PM Page 3EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software
FORM R405-2023 INPUT SUMMARY CHECKLIST REPORT
DUCTS
Duct --------------Supply-------------- --------------Return-------------- Air CFM 25 CFM 25 QN HVAC #
# Location R-Value Area Location R-Value Area Leakage Type Handler TOT OUT OUT RLF Heat Cool
MECHANICAL VENTILATION
Type Supply CFM Exhaust CFM HRV Fan Run Time Heating System Cooling System
___ None 0.0 0.0 0.0 0.0 W 0 % 1 - Electric Heat Pump 1 - Central Unit
TEMPERATURES
Programable Thermostat: Y Ceiling Fans: N
Cooling [ ] Jan [ ] Feb [ ] Mar [ ] Apr [ ] May [X] Jun [X] Jul [X] Aug [X] Sep [ ] Oct [ ] Nov [ ] Dec
Heating [X] Jan [X] Feb [X] Mar [ ] Apr [ ] May [ ] Jun [ ] Jul [ ] Aug [ ] Sep [ ] Oct [X] Nov [X] Dec
Venting [ ] Jan [ ] Feb [X] Mar [X] Apr [ ] May [ ] Jun [ ] Jul [ ] Aug [ ] Sep [X] Oct [X] Nov [ ] Dec
Thermostat Schedule: HERS 2006 Reference Hours
Schedule Type 123456789101112
___ Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80PM 80 80 78 78 78 78 78 78 78 78 78 78
___ Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78PM 78 78 78 78 78 78 78 78 78 78 78 78
___ Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68PM 68 68 68 68 68 68 68 68 68 68 66 66
___ Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68PM 68 68 68 68 68 68 68 68 68 68 66 66
6/14/2024 1:13:26 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 4
FORM R405-2023
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 95
The lower the EnergyPerformance Index, the more efficient the home.
770 Amberjack Lane,Atlantic Beach ,FL,32233
1. New construction or existing Addition
2. Single family or multiple family Detached
3. Number of units, if multiple family 1
4. Number of Bedrooms 0
5. Is this a worst case?No
6. Conditioned floor area above grade (ft²)144
Conditioned floor area below grade (ft²)0
7. Windows**Description Area
a. U-Factor:Dbl, U=0.33 60.00 ft2
S H G C : SHGC=0.23
b. U-Factor: N/A f t2
S H G C :
c. U-Factor: N/A f t2
S H G C :
Area Weighted Average Overhang Depth: 4.333 ft
Area Weighted Average SHGC: 0.230
8. Skylights Description Area
U - F a c t o r : ( A V G ) N/A N/A ft2
S H G C ( A V G ) : N/A
9. Floor Types I n s u l a t i o n Area
a. Slab-On-Grade Edge Insulation R= 0.0 144.00 f t2
b. N/A R = f t2
c. N/A R = f t2
10. Wall Types(288.0 sqft.) I n s u l a t i o n Area
a. Frame - Wood, Exterior R=13.0 288.00 ft
2
b. N/A
c. N/A
d. N/A
11. Ceiling Types(144.0 sqft.) I n s u l a t i o n Area
a. Single assembly, with (Vented) R=30.0 144.00 ft
2
b. N/A
c. N/A
12. Roof(Comp. Shingles, Vented) Deck R=0.0 144 ft
2
13. Ducts, location & insulation level R ft2
a .
b .
c .
14. Cooling Systems k B t u / h r Efficiency
a. Central Unit 9.0 SEER2:16.00
15. Heating Systems k B t u / h r Efficiency
a. Electric Heat Pump 9.0 HSPF2:8.50
16. Hot Water Systems - None required
a. N/A N/A
b. Conservation features
17. Credits Pstat
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature: ___________________________________ Date: _________________________
Address of New Home: 770 Amberjack Lane City/FL Zip: Atlantic Beach ,FL,32233
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for
energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the
Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
6/14/2024 1:13:30 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 1 of 1
6/17/2024
Florida Building Code, Energy Conservation, 8th Edition (2023)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: 770 Amberjack Lane Permit Number:
Atlantic Beach , FL 32233
MANDATORY REQUIREMENTS - See individual code sections for full details.
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card - (Mandatory).The building official shall require that an energy performance level
(EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.
Florida law (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for
both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and
efficiencies of components installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed
by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building. A copy of the
EPL display card can be found in Appendix RD.
SECTION R402 BUILDING THERMAL ENVELOPE
R402.2.10.1 Slab-on-grade floor insulation installation (Mandatory).Where installed, the insulation shall extend downward from
the top of the slab on the outside or inside of the foundation wall. Insulation located below grade shall be extended the distance
provided in Table R402.1.2, or the distance of the proposed design as applicable, by any combination of vertical insulation, insulation
extending under the slab or insulation extending out from the building. Insulation extending away from the building shall be protected
by pavement or by not less than 10 inches (254 mm) of soil. The top edge of the insulation installed between the exterior wall and the
edge of the interior slab shall be permitted to be cut at a 45-degree (0.79 rad) angle away from the exterior wall.
R402.2.11.1 Crawl space walls insulation installation (Mandatory).Where crawl space wall insulation is installed, it shall be
permanently fastened to the wall and extend downward from the floor to the finished grade level and then vertically and/or horizontally
for at least an additional 24 inches (610 mm). Exposed earth in unvented crawl space foundations shall be covered with a continuous
Class I vapor retarder in accordance with the Florida Building Code, Building, or Florida Building Code, Residential, as applicable. All
joints of the vapor retarder shall overlap by 6 inches (153 mm) and be sealed or taped. The edges of the vapor retarder shall extend
not less than 6 inches (153 mm) up the stem wall and shall be attached to the stem wall.
R402.4 Air leakage (Mandatory).The building thermal envelope shall be constructed to limit air leakage in accordance with the
requirements of Sections R402.4.1 through R402.4.5.
E x c e p t i o n :Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1 Building thermal envelope.The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.
The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
R402.4.1.1 Installation.The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer’s instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where
required by the code official, an approved third party shall inspect all components and verify compliance.
R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Dwelling units with an air
leakage rate less than three air changes per hour shall be provided with whole-house mechanical ventilation in accordance with
Section R403.6.1 of this code and Section M1507.3 of the Florida Building Code, Residential. Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
E x c e p t i o n :Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
7. If an attic is both air sealed and insulated at the roof deck, interior access doors and hatches between the conditioned space
volume and the attic shall be opened during the test and the volume of the attic shall be added to the conditioned space
volume for purposes of reporting an infiltration volume and calculating the air leakage of the home.
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 1 of 7
Florida Building Code, Energy Conservation, Mandatory Requirements (2023 Continued)
R402.4.2 Fireplaces.New wood-burning fireplaces shall have tight-fitting flue dampers or doors, and outdoor combustion air.
Where using tight-fitting doors on factory-built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed
for the fireplace. Where using tight-fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907.
R402.4.3 Fenestration air leakage.Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm
per square foot (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400
or AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
E x c e p t i o n :Site-built windows, skylights and doors.
R402.4.4 Rooms containing fuel - burning appliances.In Climate Zones 3 through 8, where open combustion air ducts provide
combustion air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the
building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated
in accordance with the envelope requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the
basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated
in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
R402.4.5 Recessed lighting.Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC-rated and labeled as having an air leakage rate
not more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All
recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
R402.4.6 Air-sealed electrical and communication boxes.Air-sealed electrical and communication boxes that penetrate
the air barrier of the building thermal envelope shall be caulked, taped, gasketed, or otherwise sealed to the air barrier
element being penetrated. Air-sealed boxes shall be buried in or surrounded by insulation. Air-sealed boxes shall be marked
in accordance with NEMA OS 4. Air-sealed boxes shall be installed in accordance with the manufacturer's instructions.
SECTION R403 SYSTEMS
R403.1 Controls
R403.1.1 Thermostat provision (Mandatory).At least one thermostat shall be provided for each separate heating and cooling system
R403.1.3 Heat pump supplementary heat (Mandatory).Heat pumps with supplementary electric-resistance heaters shall have controls
that limit supplemental heat operation to only those times when one of the following applies:
1. The vapor compression cycle cannot provide the necessary heating energy to satisfy the thermostat setting.
2. The heat pump is operating in defrost mode.
3. The vapor compression cycle malfunctions.
4. The thermostat malfunctions
R403.3.2 Sealing (Mandatory).All ducts, air handlers, filter boxes and building cavities that form the primary air containment
passageways for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance
with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section
553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes, to be
“substantially leak free” in accordance with Section R403.3.3.
R403.3.2.1 Sealed air handler.Air handlers shall have a manufacturer’s designation for an air leakage of no more than
2 percent of the design airflow rate when tested in accordance with ASHRAE 193.
R403.3.3 Duct testing (Mandatory).Ducts shall be pressure tested to determine air leakage by one of the following methods:
1. Rough-in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system,
including the manufacturer’s air handler enclosure if installed at the time of the test. All registers shall be taped
or otherwise sealed during the test.
2 Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire
system, including the manufacturer’s air handler enclosure. Registers shall be taped or otherwise sealed during the test.
E x c e p t i o n s ;
1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required for
Section R405 compliance where credit is taken for leakage, and a duct air leakage Qn to the outside of less than 0.080
(where Qn = duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is
indicated in the compliance report for the proposed design.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 2 of 7
Florida Building Code, Energy Conservation, Mandatory Requirements (2023 Continued)
R403.3.5 Building cavities (Mandatory).Building framing cavities shall not be used as ducts or plenums
R403.4 Mechanical system piping insulation (Mandatory).Mechanical system piping capable of carrying fluids above
105°F (41°C) or below 55°F (13°C) shall be insulated to a minimum of R-3.
R403.4.1 Protection of piping insulation.Piping insulation exposed to weather shall be protected from damage, including
that caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can
cause degradation of the material. Adhesive tape shall not be permitted.
R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory).If heated water circulation
systems are installed, they shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems
shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible.
Manual controls shall be readily accessible.
R403.5.1.1 Circulation systems.Heated water circulation systems shall be provided with a circulation pump. The system
return pipe shall be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall
be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand
for hot water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation
loop is at the desired temperature and when there is no demand for hot water.
R403.5.1.2 Heat trace systems.Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such
systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the
piping in accordance with the times when heated water is used in the occupancy.
R403.5.2 Demand recirculation water systems (Mandatory).Where installed, demand recirculation
water systems shall have controls that comply with both of the following:
1. The control shall start the pump upon receiving a signal from the action of a user
of a fixture or appliance, sensing the presence of a user of a fixture or sensing the
flow of hot or tempered water to a fixture fitting or appliance.
2. The control shall limit the temperature of the water entering the cold water piping
to 104ºF (40ºC).
R403.5.5 Heat traps (Mandatory).Storage water heaters not equipped with integral heat traps and having vertical pipe risers
shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially
available heat trap or a downward and upward bend of at least 3 ½ inches (89 mm) in the hot water distribution line
and cold water line located as close as possible to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1.1 Automatic controls.Service water-heating systems shall be equipped with automatic temperature
controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.
The minimum temperature setting range shall be from 100°F to 140°F (38°C to 60°C).
R403.5.6.1.2 Shut down.A separate switch or a clearly marked circuit breaker shall be provided to permit the
power supplied to electric service systems to be turned off. A separate valve shall be provided to permit the
energy supplied to the main burner(s) of combustion types of service water-heating systems to be turned off.
R403.5.6.2 Water-heating equipment.Water-heating equipment installed in residential units shall meet the minimum
efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions,
for the type of equipment installed. Equipment used to provide heating functions as part of a combination system
shall satisfy all stated requirements for the appropriate water-heating category. Solar water heaters shall meet the criteria
of Section R403.5.6.2.1.
R403.5.6.2.1 Solar water-heating systems.Solar systems for domestic hot water production are rated by the annual
solar energy factor of the system. The solar energy factor of a system shall be determined from the Florida Solar
Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806,
Test Methods for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and
Component Test Protocol. Collectors in installed solar water-heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
R403.6 Mechanical ventilation (Mandatory).The building shall be provided with ventilation that meets the requirements of the
Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation
including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic
or gravity dampers that close when the ventilation system is not operating.
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 3 of 7
Florida Building Code, Energy Conservation, Mandatory Requirements (2023 Continued)
R403.6.1 Whole-house mechanical ventilation system fan efficacy.When installed to function as a
whole-house mechanical ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
E x c e p t i o n :Where an air handler that is integral to tested and listed HVAC equipment is used to provide
whole-house mechanical ventilation, the air handler shall be powered by an electronically commutated motor.
TABLE R403.6.1
WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION AIRFLOW RATE MINIMUM MINIMUM EFFICACY
a AIRFLOW RATE MAXIMUM
(CFM) (CFM/WATT) (CFM)
HRV or ERV Any 1.2 cfm/watt Any
Range hoods Any 2.8 cfm/watt Any
In-line fan Any 3.8 cfm/watt Any
Bathroom, utility room 10 2.8 cfm/watt <90
Bathroom, utility room 90 3.5 cfm/watt Any
For SI: 1 cfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916
R403.6.2 Ventilation Air.Residential buildings designed to be operated at a positive indoor pressure
or for mechanical ventilation shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation
for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10
otherwise.
R403.7 Heating and cooling equipment.
R403.7.1 Equipment sizing (Mandatory).Heating and cooling equipment shall be sized in accordance with ACCA
Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating
and cooling calculation methodologies, based on building loads for the directional orientation of the building.
The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along
with the sensible and total cooling capacities at the design conditions described in Section R302.1. This Code
does not allow designer safety factors, provisions for future expansion or other factors that affect equipment
sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation
such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall
have an efficiency rating equal to or greater than the minimum required by federal law for the geographic
location where the equipment is installed.
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 4 of 7
Florida Building Code, Energy Conservation, Mandatory Requirements (2023 Continued)
R403.7.1.1 Cooling equipment capacity.Cooling only equipment shall be selected so that its total capacity is not less than
the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected
in Section R403.7, or the closest available size provided by the manufacturer’s product lines. The corresponding latent capacity
of the equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating-test value and shall not be used for equipment sizing. Manufacturer’s
expanded performance data shall be used to select cooling-only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water-source equipment), the blower CFM provided by the
expanded performance data, the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple-family residential equipment sizing may be selected so that its cooling capacity
is less than the calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida-registered engineer, in attached single- and multiple-family units,
the capacity of equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
R403.7.1.2.1 Heat pumps.Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
R403.7.1.2.2 Electric resistance furnaces.Electric resistance furnaces shall be sized within 4 kW of the design requirements
calculated according to the procedure selected in Section R403.7.1.
R403.7.1.2.3 Fossil fuel heating equipment.The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
R403.7.1.3 Extra capacity required for special occasions.Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled
to prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory).Systems serving multiple dwelling units shall comply with Sections C403
and C404 of the Florida Building Code, Energy Conservation—Commercial Provisions in lieu of Section R403.
R403.9 Snow melt and ice system controls (Mandatory).Snow- and ice-melting systems, supplied through energy service to the
building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C).
403.10 Pools and permanent spa energy consumption (Mandatory).The energy consumption of pools and permanent spas shall
be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters.The electric power to heaters shall be controlled by a readily accessible on-off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater.
Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition
to a circuit breaker for the power to the heater.
Gas-fired heaters shall not be equipped with continuously burning ignition pilots.
R403.10.2 Time switches.Time switches or other control methods that can automatically turn off and on according
to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in
time switches shall be in compliance with this section.
Exceptions:
1. Where public health standards require 24-hour pump operation.
2. Pumps that operate solar- and waste-heat-recovery pool heating systems
3. Where pumps are powered exclusively from on-site renewable generation.
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 5 of 7
Florida Building Code, Energy Conservation, Mandatory Requirements (2023 Continued)
R403.10.3 Covers.Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor-retardant
cover on or at the water surface or a liquid cover or other means proven to reduce heat loss.
Exception:Where more than 70 percent of the energy for heating, computed over an operation season, is from
site-recovered energy, such as from a heat pump or solar energy source, covers or other
vapor-retardant means shall not be required
R403.10.4 Gas- and oil-fired pool and spa heaters.All gas- and oil-fired pool and spa heaters shall have a minimum
thermal efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with
ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights.
R403.10.5 Heat pump pool heaters.Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160, Table 2, Standard Rating Conditions-Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas (Mandatory).The energy consumption of electric-powered portable spas shall be controlled by the
requirements of APSP-14
R403.13 Dehumidifiers (Mandatory).If installed, a dehumidifier shall conform to the following requirements:
1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier
capacity for the house is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity
for the house is greater than or equal to 75 pints/day.
2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air.
3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated
to a minimum of R-2.
4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential.
R403.13.1 Ducted dehumidifiers.Ducted dehumidifiers shall, in addition to conforming to the requirements of
Section R403.13, conform to the following requirements:
1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the
cooling system, a backdraft damper shall be installed in the supply air duct between the dehumidifier inlet and
outlet duct.
2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central
heating and cooling system, a backdraft damper shall be installed in the dehumidifier supply duct between the
dehumidifier and central supply duct.
3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side
upstream from the central cooling evaporator coil.
4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
R404.1 Lighting equipment (Mandatory).All permanently installed luminaires, excluding those in kitchen appliances, shall have an
efficacy of at least 45 lumens-per-watt or shall utilize lamps with an efficacy of not less than 65 lumens-per-watt.
R404.1.1 Lighting equipment (Mandatory).Fuel gas lighting systems shall not have continuously burning pilot lights.
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 6 of 7
Florida Building Code, Energy Conservation, Mandatory Requirements (2023 Continued)
SECTION R405
SIMULATED PERFORMANCE ALTERNATIVE
(PERFORMANCE)
R405.2 Mandatory requirements.Compliance with this section requires that the mandatory provisions identified in
Section R401.2 be met. All supply and return ducts not completely inside the building thermal envelope shall be
insulated to a minimum of R-6, except site-wrapped supply ducts not completely inside the building thermal envelope
shall be insulated to a minimum of R-8.
R405.2.1 Ceiling insulation.Ceilings shall have an insulation level of at least R-19, space permitting. For the
purposes of this code, types of ceiling construction that are considered to have inadequate space to install R-19
include single assembly ceilings of the exposed deck and beam type and concrete deck roofs. Such ceiling
assemblies shall be insulated to at least a level of R-10.
R405.2.2 Building air leakage testing.Building or dwelling air leakage testing shall be in accordance with Sections
R402.4 through R402.4.1.2. If an air leakage rate below seven air changes per hour at a pressure of 0.2 inch w.g. (50
pascals) is specified for the proposed design, testing shall verify the air leakage rate does not exceed the air leakage
rate of the proposed design instead of seven air changes per hour.
R405.2.3 Duct air leakage testing.In cases where duct air leakage lower than the default Qn to outside of 0.080
(where Qn = duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is
specified for the proposed design, testing in accordance with Section R403.3.2 shall verify a duct air leakage rate not
exceeding the leakage rate of the proposed design. Otherwise, in accordance with Section R403.3.3, duct testing
is not mandatory for buildings complying by Section R405.
SECTION R406
ENERGY RATING INDEX
COMPLIANCE ALTERNATIVE
R406.2 Mandatory requirements.Compliance with this section requires that the provisions identified in Sections
R401 through R404 labeled as “mandatory” and Section R403.5.3 of the 2015 International Energy Conservation
Code be met. For buildings that do not utilize on-site renewable power production for compliance with this section, the
building thermal envelope shall be greater than or equal to levels of efficiency and Solar Heat Gain Coefficient in
Table 402.1.1 or 402.1.3 of the 2009 International Energy Conservation Code. For buildings that utilize on-site
renewable power production for compliance with this section, the building thermal envelope shall be greater than or
equal to levels of efficiency and Solar Heat Gain Coefficient in Table R402.1.2 or Table R402.1.4 of the 2015
International Energy Conservation Code.
E x c e p t i o n :Supply and return ducts not completely inside the building thermal envelope shall be insulated to a
minimum of R-6.
R406.2.1 Site-wrapped supply ducts.Site-wrapped supply ducts not completely inside the building thermal
envelope shall be insulated to a minimum of R-8.
6/14/2024 1:13:36 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 7 of 7
CHECK2023 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA-TABLE 402.4.1.1a
Project Name: A1A Heat and Air 770 Amberjack Lane Builder Name: Bachmann Homes
Street: 770 Amberjack Lane Permit Office: D u v a l
City, State, Zip: Atlantic Beach , FL, 32233 Permit Number:
Owner: Jurisdiction: 261100
Design Location: FL, Jacksonville County: Duval(Florida Climate Zone 2)
COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA
General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shallrequirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material.Breaks or joints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit
Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity with
sealed. a material having a thermal resistance of R-3 per
Knee walls shall be sealed. inch minimum
Exterior thermal envelope insulation for framed walls
shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights The space between window/door jambs and framing, andand doors skylights and framing shall be sealed.
Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated.
Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to(including insulation. maintain permanent contact with the underside ofabove-garage subfloor decking, or floor framing cavity insulationand cantilevered shall be permitted to be in contact with the top sidefloors)of sheathing, or continuous insulation installed onthe underside of floor framing and extends from thebottom to the top of all perimeter floor framingmembers.
Crawl space walls Exposed earth in unvented crawl spaces shall be covered Where provided instead of floor insulation, insulation
with a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls.
Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Narrow cavities Batts in narrow cavities shall be cut to fit, or narrowcavities shall be filled by insulation that oninstallation readily conforms to the available cavityspaces.
Garage separation Air sealing shall be provided between the garage and
conditioned spaces.
Recessed lighting Recessed light fixtures installed in the building thermal Recessed light fixtures installed in the buildingenvelope shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated.
Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind piping and wiring.
Shower/tub The air barrier installed at exterior walls adjacent to showers Exterior walls adjacent to showers and tubs shall
on exterior wall and tubs shall separate them from the showers and tubs. be insulated.
Boxes, housings, and enclosures that penetrate the air barrier Boxes, housings, and enclosures shall be buried inshall be caulked, taped, gasketed, or otherwise sealed or surrounded by tightly fitted insulation.Electrical, to the air barrier element being penetrated.communication, and All concealed openings into the box, housing, or enclosureother equipment shall be sealed.boxes, housings, The continuity of the air barrier shall be maintained aroundand enclosures boxes, housings, and enclosures that penetrate the air barrier.Alternatively, air-sealed boxes shall be installed in accordancewith R402.4.6
HVAC register boots HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub-floor, wall covering
or ceiling penetrated by the boot.
Concealed When required to be sealed, concealed fire sprinklers shall onlysprinklers be sealed in a manner that is recommended by the manufacturer.Caulking or other adhesive sealants shall not be used to fill voidsvoids between fire sprinkler cover plates and walls or ceilings.
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
6/14/2024 1:13:39 PM EnergyGauge® USA 8.0.00 - FlaRes2023 FBC 8th Edition (2023) Compliant Software Page 1
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2024-Jun-14 13:12:34
Right-Suite® Universal 2024 24.0.01 RSU27534 Page 1
...A Heat and Air 770 Amberjack Lane Lanai (1).rup Calc = MJ8 House Front faces: NE
A1A Heat and Air 770 A...Job:Load Short Form Jun 14, 2024Date:Entire House EnergycalcsplusBy:
A1A Heat and Air
Phone: 9123769638 Fax: 8885441223 Email: energycalcsplus@aol.com
Project Information
For:
770 Amberjack Lane, Atlantic Beach, FL 32233
Design Information
InfiltrationClgHtg
SimplifiedMethod9333Outside db (°F)
AverageConstruction quality7570Inside db (°F)
0Fireplaces1837Design TD (°F)
M-Daily range
5050Inside humidity (%)
4933Moisture difference (gr/lb)
HEATING EQUIPMENT COOLING EQUIPMENT
Make GENERIC 9K MINI SPLIT Make GENERIC 9K MINI SPLIT
Trade Trade
Model Cond
AHRI ref Coil
AHRI ref
Efficiency 8.5 HSPF2 Efficiency 12.0 EER2, 16 SEER2
Heating input Sensible cooling Btuh8190
Heating output Btuh @ 47°F9000 Latent cooling Btuh810
Temperature rise °F27 Total cooling Btuh9000
Actual air flow cfm300 Actual air flow cfm300
Air flow factor cfm/Btuh0.076 Air flow factor cfm/Btuh0.040
Static pressure in H2O0 Static pressure in H2O0
Space thermostat Load sensible heat ratio 0.95
Capacitybalance point = 0 °F
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft²)(Btuh)(Btuh)(cfm)(cfm)
LANAI 144 3958 7591 300 300
Entire House 144 3958 7591 300 300
Other equip loads 0 0
Equip. @ 1.00 RSM 7591
Latent cooling 406
TOTALS 144 3958 7997 300 300
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2024-Jun-14 13:12:34Right-Suite® Universal 2024 24.0.01 RSU27534 Page 1...A Heat and Air 770 Amberjack Lane Lanai (1).rup Calc = MJ8 House Front faces: NE
A1A Heat and Air 770 A...Job:Project Summary Jun 14, 2024Date:Entire House EnergycalcsplusBy:
A1A Heat and Air
Phone: 9123769638 Fax: 8885441223 Email: energycalcsplus@aol.com
Project Information
For:770 Amberjack Lane, Atlantic Beach, FL 32233
Notes:
Design Information
Jacksonville Intl, FL, USWeather:
Winter Design Conditions Summer Design Conditions
Outside db °F33 Outside db °F93Inside db °F70 Inside db °F75Design TD °F37 Design TD °F18Daily range MRelative humidity %50Ventilation Method MJ8 Moisture difference gr/lb49
Heating Summary Sensible Cooling Equipment Load Sizing
Structure Btuh3958 Structure Btuh7591Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0
Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh3958 Use manufacturer's data yRate/swing multiplier 1.00InfiltrationEquipment sensible load Btuh7591
Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Average0Fireplaces Structure Btuh406Ducts Btuh0Central vent (0 cfm) Btuh0CoolingHeating144144Area (ft²) Equipment latent load Btuh40611521152Volume (ft³)Air changes/hour 0.320.61 Equipment Total Load (Sen+Lat)Btuh7997Equiv. AVF (cfm) 612 Req. total capacity at 0.91 SHR ton0.7
Heating Equipment Summary Cooling Equipment Summary
Make GENERIC 9K MINI SPLIT Make GENERIC 9K MINI SPLITTrade TradeModel CondAHRI ref CoilAHRI refEfficiency 8.5 HSPF2 Efficiency 12.0 EER2, 16 SEER2Heating input Sensible cooling Btuh8190Heating output Btuh @ 47°F9000 Latent cooling Btuh810Temperature rise °F27 Total cooling Btuh9000Actual air flow cfm300 Actual air flow cfm300Air flow factor cfm/Btuh0.076 Air flow factor cfm/Btuh0.040Static pressure in H2O0 Static pressure in H2O0Space thermostat Load sensible heat ratio 0.95Capacitybalance point = 0 °F
2024-Jun-14 13:12:34
Right-Suite® Universal 2024 24.0.01 RSU27534 Page 1
...A Heat and Air 770 Amberjack Lane Lanai (1).rup Calc = MJ8 House Front faces: NE
A1A Heat and Air 770 A...Job:Manual S Compliance Report Jun 14, 2024Date:Entire House EnergycalcsplusBy:
A1A Heat and Air
Phone: 9123769638 Fax: 8885441223 Email: energycalcsplus@aol.com
Project Information
For:
770 Amberjack Lane, Atlantic Beach, FL 32233
Cooling Equipment
Design Conditions
°F75.0Entering coil DB:Btuh7591Sensible gain:°F92.6Outdoor design DB:
°F62.5Entering coil WB:Btuh406Latent gain:°F76.8Outdoor design WB:
Btuh7997Total gain:°F75.0Indoor design DB:
cfm300Estimated airflow:%50Indoor RH:
Manufacturer's Performance Data at Actual Design Conditions
Split ASHPEquipment type:
Model:GENERIC 9K MINI SPLManufacturer:
cfm300Actual airflow:
% of load108Btuh8190Sensible capacity:
% of load200Btuh810Latent capacity:
%91SHR:% of load113Btuh9000Total capacity:
Heating Equipment
Design Conditions
°F70.0Entering coil DB:Btuh3958Heat loss:°F32.8Outdoor design DB:
°F70.0Indoor design DB:
Manufacturer's Performance Data at Actual Design Conditions
Split ASHPEquipment type:
Model:GENERIC 9K MINI SPLManufacturer:
cfm300Actual airflow:
°F0Capacity balance:% of load227Btuh9000Output capacity:
°F0Economic balance:Btuh0Supplemental heat required:
Meets all requirements of ACCA Manual S.