Loading...
7-25-23 Budget Workshop Adopted MinutesMINUTES Budget Workshop Meeting Tuesday, July 25, 2023 - 5:30 PM Commission Chamber Commission Waters gave an invocation. ATTENDANCE: Present: Also Present: Curtis Ford, Mayor - Seat I Bruce Bole, Commissioner - Seat 2 Michael Waters, Commissioner - Seat 3 Candace Kelly, Commissioner - Seat 4 Jessica Ring, Commissioner - Seat 5 Joe Gerrity, Interim City Manager (CM) Donna Bartle, City Clerk (CC) Kevin Hogencamp, Deputy City Manager Victor Gual i 1 lo, Police Chief (PC) CALL TO ORDER Mayor Ford called the meeting to order at 5:30 p.m. PUBLIC COMMENT Mark Davenport spoke about adding more pickleball courts to Donner Park. Rick Carper spoke aboutthe budget review process and the importance of keeping the public updated about on budgeting issues. Brinkley Harrell spoke about the public not having a budget draft to review. Ile spoke about the budget, including more detailed salary information and comments about other budgeting issues. C(' Bartle read the tbllowing comment into the record: James Roman is in support of adding additional pickleball courts at Donner Park. 2. FY 2022-23 REVIEW CM Gerrity gave an overview as presented in slides one through eight of a is attached hereto and made part of this Official Record as Attachment A). 7-25-23 Atia(lanent 3. FY 2023-24 BUDGET TOPICS Budget Workshop July 25, 2023 A. Departmental Budget Overview PC Gualillo highlighted the Police Department's proposed budgetas detailed in a slide show (which is attached hereto and made pari of this Official Record as Attachment B) and answered questions from the Commission. PC Gualillo spoke in detail, about recruiting challenges and efforts. Commissioner Waters asked about the maintenance schedule for the police vehicles. PC Gualillo explained that First Vehicle is contracted out to maintain the vehicles and spoke about the conditions of the current vehicles. Commissioner Ring asked for clarification regarding the breakdown of total vehicles versus the number of staff PC Gualillo responded about current and future staff numbers and vehicle usage of all staff. Mayor Ford asked about the status of the newly ordered cars, and PC Gualillo explained the status of the new cars. Clarification was given regarding the rolled -down car assignment to staff. Mayor Ford explained he would not support the total request of four new cars or two new cars because of the difficulty with hiring new officers. Mayor Ford explained he supports extending the life of a few patrol cars and possibly adding new cars to next year's budget. Commissioner Ring asked for clarification regarding the ordering timeline and process. PC Gualillo explained the process stating it could take up to 18 months to receive a new patrol car. Commission Kelly asked about the status of the Citizen Police Academy (CPA). PC Gualillo responded a new CPA class would start in Spring. Mayor Ford spoke about the option of offering vehicles being used by volunteers or part- time staff to be used by new hire officers if needed. Mayor Ford asked if the City approved the purchase of One new vehicle and deployed the strategy of pushing, out the life expectancy of the other vehicles and would that work for the Police .Department. PC Gualillo responded there are currently not enough cars in the fleet and the department would still be short on vehicles. PC Gualillo reviewed the currentnumbers of staff versus vehicles needed. Commissioner Ring asked about the option of leasing police cars. PC Gualillo explained the process and pros and cons of leasing vehicles. Mayor Ford asked for confirmation that the purpose of the meeting was for information purposes only. CM Gerrity explained the final 'budget process and made note that staff would take information from the departmental budget workshops and prepare a final Budget Workshop July 25, 2023 budget for Commission review by August 7, 2023. GM Gerrity reviewed Workshop and meeting schedule. 7-25-23 Amtchineut B B. Enterprise Funds Overview CM Gerrity reported 011 slides eleven and twelve from .Attachment A. et Discussion ensued regarding past and current salary increases for all City staff. PC Gualitlo confirmed the 5% increase for Police versus the 3% increase tbr non-union staff. Commissioner Kelly asked if all City staff could get equal pay increases. Mayor Ford reviewed last year's increases. Mayor Ford asked the Commission to consider pay increases tbr the lower -earning employees, bringing them up to the midpoint salary and higher -paid employees if not at the midpoint salary. Commissioner Bole spoke about employees living further away, causing an increase m transportation costs. C. Capital Projects CM Gerrity reported on slides thirteen through seventeen from Attachment A. Commissioner Ring asked about the search status tbr a replacement van for Parks and Recreation. CM Gen-ity stated a van was ordered, the old van was traded in, and the van would he shared with the E:3oys and Girls Club. Commissioner Bole asked about the status of the reconstruction of the loth Street Walkover. CM Gerrity explained a third engineering study would be completed. Mayor Ford asked tbr clarification regarding the Sherry Drive Phase 11 Water PVC (Pioneer/NS Mayport) and the 75% reimbursement DCIP. CM Gerrity explained most grant funding is reimbursed to the City after the City has paid for the entire project. Mayor Ford briefly spoke about the benefits of COAB providing water to the Mayport base. Commissioner Ring asked for clarification regarding the Dora Drive project and the cost of the environmental study. Mayor Ford and CM Gerrity clarified the environmental study would cost approximately $5,000, and this budget item is or phase one of the project. CM Gerrity spoke about the items on slide eighteen of Attachment A regarding C.'ommission Consensus needed. He explained that he and DCM Hogencamp visited multiple City parks and agreed the only place feasible to add pickleball courts would he Donner Park. He explained the project would cost approximately $230,000, and 18-20 trees would need to be removed. He mentioned another option would be to convert existing tennis courts to pickleball courts at an estimated cost of $40,000. Commissioner Kelly suggested the Parks and Recreation Master Plan should include updated plans lbr any changes froni the Master Plan betbre decisions are made. She explained accommodations have already been made within the City to accommodate pickleball, and if additional changes need to he made, it should go hack to the Parks and Budget Workshop July 25, 2023 Recreation Department to he included in the Master Plan and she does not support spending additional funds for more pickleball courts at this time. Commissioner Ring asked for background intOnnation regarding the Parks and Recreation Master Pian. Commissioner Kelly explained the Parks and Recreation Department created the Master Plan, and it has never been updated to include pickleball. Commissioner Waters suggested converting the existing tennis court at Donner Park into a pickleball court and that tennis courts are available at Jack Russel Park. Mayor Ford supports adding additional funds to the budget to meet the needs and requests of the citizens for additional pickleball courts. He agreed the Parks and Recreation Master Plan could he updated but does not want to delay budgeting funds for additional courts. CM Gerrity concluded he would meetwith staff and get a more specific quote or converting the tennis court at Donner Park into an additional pickleball court and would bring the information hack to the Commission in the final budget for formal consideration, Commissioner Ring suggested Pier deck/rail replacement be made at Dutton !siand north pier and Sunset pier. CM Gerrity responded the City would do its best. Mayor Ford explained the City is still waiting on revenue, and it is difficult to determine an exact budget without all the expected revenue. Additional revenue information should he corning 'ithin the next week. Commissioner 'Waters suggested budgeting more money for additional pickleball courts in addition to the conversion at Donner Park. Commissioner Bole responded additional plans should be included in the Parks and Recreation Master Plan. Commissioner Ring asked about the Main Street road project to address speeding. CM Gerrity explained an active project listed in the budget addressed a traffic calming project going out to hid. Mayor Ford suggested increasing enforcement, adding lower cost speed tables, and monitoring the results befOre spending much more money on traffic calming circles. PC Gualillo suggested everyone look at the hard data in recent reports, which shows no speeding issues on Main Street. Commissioner Ring reiterated that Main Street has a speeding issue. Mayor Ford suggested an extra push of hidden speed enforcement. CM Gerrity stated this topic would he brought back for further discussion at an upcoming regular Commission meeting. ADJOURNMENT The meeting adjourned at 7:10 Budget Workshop July 25, 2023 Attest: Donna L. Bartle, City Clerk CuiTt Ford, Myor Date Approved: Budget Workshop July 25, 2023 Attachment A to 7-25-23 Minutes Attachment A to 7-25-23 Minutes 'TIC BEACH FY 2022-23 HIGHLIGHTS ADMIN/ENGINEERING Administering the City's 10 -year capital improvement plan (Commission Priority) Secured $574,000 from FEMA and in state appropriation for design and construction of the Cutlass Drive box culvert expansion project in the Hopkins Creek drainage ditch. Secured $194,000 FDEM grant to replace all eight bay doors at the Public Works building with 140 -mph wind -rated doors. Secured $184,250 in FDEP grant for Cavalla Road lift station flood protection project. Secured $92,500 FEMA grant for design of the Stanley Road Drainage Improvement project in the Aquatic Gardens watershed. Studying/planning for the potential purchase of Dora Drive stormwater mitigation park Attachment A to 7-25-23 Minutes FY 2022-23 HIGHLIGHTS PUBLIC WORKS/UTILITIES Donner Road project (August completion) Turf block parking on George Street (14 spaces) Dutton Island: Rebuilt fishing pier pilings, east and west lookouts and bridge culvert; planted south kayak area Modernization of Water Plants 1 (design) and 2 (construction); water tower demolition Old Sherry Drive water main extension Safety improvements at Sandpiper and Plaza Beaches Veterans Memorial Park Merchant Marine monument Skateboard park repairs, facelift Attachment A to 7-25-23 Minutes FY 2022-23 HIGHLIGHTS POLICE, OCEAN RESCUE, ANIMAL CONTROL City Commission arrived at consensus regarding new lifeguard station Implemented citizen online services presence on web and added Thorguard lightening prediction and crime mapping to website • Produced new annual report that presents crime statistics using the National Incident Based Reporting System, the new standard; become one of first agencies in Florida to have data FBI - certified • Took over the management of — and is steadily improving -- the pay -to -park program at 18th and 19th streets Attachment A to 7-25-23 Minutes B CH FY 2022-23 HIGHLIGHTS PLANNING, COMMUNITY DEVELOPMENT, BUILDING Reviewing land development/stormwater management codes (Commission Priority) Obtained federal grant to identify new opportunities to improve connectivity and bike/pedestrian safety (Commission Priority) Preparing for a tree canopy assessment to create actions to further protect and enhance the canopy (Commission Priority) Administering the Mayport Road Vision Implementation Plan, Connectivity Plan and Parks Master Plan (Commission Priority) Conducting community outreach aimed to reduce residential water consumption by 15%, and residential and City energy consumption by 10%, by Dec. 31, 2023 (Commission Priority) Received LEED Gold v4.1 certification. Planted 75 trees and recertified as Tree City USA. Attachment A to 7-25-23 Minutes FY 2022-23 REVIEW CULTURAL ARTS/RECREATION Developing partnership with Boys' and Girls' Clubs of Northeast Florida to provide after-school and summer programming, ensuring that the program is certified and has qualified educators on staff (Commission Priority) Grew Arts, Recreation and Culture Committee grant program; added community programs Major Events o Egg Hunt and Parade o Tour de Parks o Shakespeare in the Park o Fall Fall Fest o Jazz Fest o Artisans' Faire OF CRtATING BOYS &GIRLS OC NO (1,41.$T FLOe 20th anniversary of Acoustic Night and Songwriters Concerts BEACg Attachment A to 7-25-23 Minutes FY 2022-23 HIGHLIGHTS GENERAL GOVERNMENT City Commission: Created Safety, Traffic and Parking Committee to review beach access -parking and mobility issues, and provide recommendations to the City Commission (Commission Priority) Finance/IT: Reviewing Enterprise Resource Planning software proposals; requesting funding in 2023-24 budget Information Technology: Upgraded server upgrade in virtual environment. Upgraded IT HelpDesk; established Public Works IT work order request system. Migrating on -premise email server to the Microsoft Government Cloud. Attachment A to 7-25-23 Minutes ACTIVE PROJECTS WWTF Hydraulic & Piping Improvements o Out to bid Aug. 14 Main Street Traffic Calming o Out to bid Aug. 21 Levy Rd Sidewalk Improvements o Out to bid Aug. 21 Aquatic Drive Stormwater Improvements o Out to bid Aug. 28 Lifeguard Station o Construction expected to begin October 2023 Splash Pad o Construction expected to begin October 2023 Attachment A to 7-25-23 Minutes June 23 to July 31 July 1 July 10-13 July 24 July 25 August 7 August 24 August 24 September 21 September 13 September 21-23 September 25 Within 3 days of final hearing Within 3 days of receiving Form DR -422 Within 30 days after final hearing Attachment A to 7-25-23 Minutes State Revenue Sharing Estimates provided Deadline to receive Certification of Taxable Value; actually received June 26. Review budget with Commissioners individually Approval of proposed millage rate on DR -420 and scheduling of public hearings to consider the Tentative Millage and Tentative Budget. This information is to be presented to the property appraiser by Aug. 4 -- within 35 days from the July 1 date of certification deadline. Budget Workshop #1 Budget Workshop #2 Tax notifications to be mailed within 55 days of Certification, (TRIM notice of proposed property taxes). (If Necessary) Budget Workshop #3 Advertise in newspaper for public hearing on adoption of Tentative Budget and Proposed Millage (The property appraiser also notified property owners). First Public Hearing to adopt the Tentative Budget and Millage (F.S. 200.065). Publish TRIM notice in newspaper Second/Final Public Hearing to approve Budget and Millage Rate Send resolution adopting the millage rate to the property appraiser and tax collector Complete and certify millage rate to property appraiser Complete Certification of Compliance Form (Form DR -487) along with copies of ads (whole page) proof of publication from newspaper and copies of ordinance adopting the budget and resolution adopting the millage rate Department of Revenue Property Appraiser City Commission, City Manager CM, Director of Finance DF, CM, CC DF, CM, CC PA DF, CM, CC DF, CC, PA CC DF CC DF DF DF Attachment A to 7-25-23 Minutes ASSUMPTIONS Maintain the lowest millage rate (3.1035) in Northeast Florida Personnel o No increase in number of budgeted personnel; repurpose police position for information technology responsibilities o 4% salary increase for general and unionized blue-collar employees o 5% salary increase for unionized police employees o 8-10% in health insurance cost Vehicles o Two new police vehicles o One new public works vehicle (pickup truck) Attachment A to 7-25-23 Minutes AD VALOREM TAXES Current millage 3.1035 Property values increased 9% Rolled -back millage rate is 2.8410. At this rate the tax levy would be the same as FY 2022-23 Required to budget at least 95% of tax levy The City usually receives between 95-97% of the levy. Attachment A to 7-25-23 Minutes Capital Improvement Projects Aquatic Gardens (HMGP) Public Works building ($950K carryover plus 550K from water/sewer) Dora Drive 1,100,000 Lifeguard station ($560K COJ, $340K COAB 900,000 TBD) Enterprise Resource Solution (ERP) 625,000 Levy Road multi -use path ($609,573 609,573 carryover) Splash Pad 607,600 Reconstruct 16th Street Walkover 600,000 (carryover) Baker Center expansion ($500K grant) 500,000 2,813,000 1,500,000 Attachment A to 7-25-23 Minutes Capital Improvement Projects (Cont'd) Mary Street and Stewart Street stormwater improvements (75% HMGP funded) Milling and paving Traffic Safety Study ($200K grant) Dutton Island north pier deck/rail replacement Sunset pier deck/rail replacement at Tide 200,000 Views Replace bay doors ($194K HMGP grant 194,000 funded) New beach walkover(s) (locations TBD) 140,000 Sidewalks (various locations) 125,000 Stanley Road sewer improvement (90% 103,000 HMGP) 371,400 350,000 225,000 200,000 Attachment A to 7-25-23 Minutes Capital Improvement Projects —Water & Sewer Sherry Drive Phase 11 water PVC Pioneer/NS Mayport (75% reimburse DCIP) WTP #2 modernization -construction WTP #1 modernization -construction (carryover) WTP #3 new well/pump construction $850,000 Infiltration and inflow control — assessment 500,000 and implementation Cavalla lift station retrofit 400,000 Buccaneer lift station retrofit 384,600 WWTF Hypochlorite conversion 300,000 20th St. lift station bulkhead and access road 250,000 reconstruction 1,400,000 1,300,000 992,000 Attachment A to 7-25-23 Minutes Capital Improvement Projects — Water & Sewer (Cont'd) Cavalla service connections east end Aeration tank improvement 250,000 250,000 WTP #1 ground tank clean/paint inside/out 250,000 Clay service line replacement — Selva 200,000 Marina, Oak Harbor and Park Terrace Mayport Road water PVC (carryover) 197,100 Replace digester catwalk (carryover) 185,030 Attachment A to 7-25-23 Minutes GRANT FUNDING Aquatic Gardens Drainage Improvements Stormwater Phase! $2,813,000 $524,326 HMGP - $1,488,674 State Allocation — $800,000 Donner Park Splash Parks $607,500 $382,500 FRDAP - $185,500 CDBG — $39,500 CDBG - $91,200 (might be Tess due to Levy Rd Multiuse Path Streets $629,000 $537,800 design fees, need to check grant balance w/ Kim) Vulnerability CDBG-MIT 486,950 Assessment & Planning $165,000 $13,050 FDEP Resilient FL - $65,000 Adaptation Plan Update Mary St Drainage Stormwater $371,400 $$92,850 HMGP - $$278,550 Construction Pad Stanley Rd Drainage Stormwater $102,789 $10,279 HMGP - $92,510 Improvements Design Cutlass Drive Box Stormwater $81,886 $8,189 HMGP - $73,697 Culvert Design Public Works Building Facilities $194,000 $0 HLMP - $194,000 Storm Rated Bay Doors Attachment A to 7-25-23 Minutes Commission Consensus Needed Public Works Public Works Public Works Pickleball court expansion/tennis court conversion Seminole Road gateway improvement Baseball field improvements (ABAA) 230,000 Attachment A to 7-25-23 Minutes COMMISSIONER REQUESTS Attachment A to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Attachment B to 7-25-23 Minutes Investigations Animal Control Attachment B to 7-25-23 Minutes Vacant FIT Patrol Unassi ui ed Patrol Position Cars Available 6 * 3 (+2 requested = S) Projected Hires in 2024 5