Loading...
801 ATLANTIC BLVD ROW24-0021 A02VZ8N DWGSEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATT EX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATT EX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATT EX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATT EX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATTEX_ATT SYMBOL LEGENDPROPOSEDEXISTINGDESCRIPTIONAERIAL CABLEBURIED CABLEBST POLEPOWER POLECONCRETE POLEANCHOR & GUYENCLOSUREENCLOSUREMANHOLEHANDHOLEPIPE/CONDUITN/AN/AN/ABORECUT PAVEMENTSPLICING PITFIBER OPTIC CABLECABINET TYPES(VRAD, XBOX)POWER UTILITYGAS UTILITYWATER UTILITYCATV UTILITYSEWER UTILITYSTORM UTILITYTWO FULL BUS. DAYS BEFORE YOU DIGCALL BEFORE YOU DIG1-800-432-4770DIAL 811 orFLORIDAwww.call811.com TWO FULL BUS. DAYS BEFORE YOU DIGCALL BEFORE YOU DIG1-800-432-4770DIAL 811 orFLORIDAwww.call811.com 10/19/202210:12:16 AMREVISIONDESCRIPTION: REVISION LAST ofSTANDARD PLANS FY 2023-24 SHEETINDEX ROAD WORK END PRESENT WHEN WORKERS DOUBLED SPEEDING FINES AHEAD WORK ROAD CLOSED SHOULDER RIGHT ROAD WORK END PRESENT WHEN WORKERS DOUBLED SPEEDING FINES AHEAD WORK ROAD ROAD WORK END AHEAD WORK ROAD ROAD WORK END AHEAD WORK ROAD CLOSED SHOULDER RIGHT 21102-602 TWO-LANE AND MULTILANE, WORK ON SHOULDER 11/01/21 6" White (See Note 7) BL/3 L/3 NOTE: of the "Shoulder Closed" sign (W21-5a). "Worker" sign (W21-1) may be used instead 9. When there is no paved shoulder, the distances for work on the median. with associated work zone sign spacing 8. Omit "Shoulder Closed" signs (W21-5a) along place for 3 days or less. omitted when the work operation is in 7. Temporary pavement markings may be hours or less. work operation is in place for 24 distances may be omitted when the associated work zone sign spacing Work” Signs (G20-2) along with the Present” signs (MOT-13-06) and “End Road 6. The “Speeding Fines Doubled When Workers use a lane closure. and work zone speed is greater than 45 MPH, 5. For work less than 2' from the traveled way egress. to accommodate work vehicle ingress and work area), use a flagger or lane closure (excluding establishing and terminating the through traffic lanes in a one hour period 4. When four or more work vehicles enter the or less. devices for work operations 60 minutes Engineer may omit signs and channelizing 15' from the edge of traveled way, the 3. Where work activities are between 2' and channelizing device spacing values. See Index 102-600 for “L”, “X”, "B", and B = Buffer Length X = Work Zone Sign Spacing 2. L = Taper Length shoulder. of divided roadways, with work on the and Multilane Roadways, including Medians 1. This Index applies to Two-Lane, Two-Way XXX 10' Min. X X X XXX SYMBOLS: Work Zone Sign Work Area Channelizing Device (See Index 102-600) Lane Identification and Direction of Traffic W21-5a W20-1F W20-1F W21-5a W20-1F (See Note 6) MOT-13-06 (See Note 6) G20-2 WITH WORK ZONE SPEED OF 45 MPH OR LESS SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY TWO-LANE ROADWAY (See Note 6) G20-2 (See Note 6) MOT-13-06 SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY TWO-LANE ROADWAY (See Note 6) G20-2 (See Note 6) G20-2 W20-1F 10/19/202210:12:18 AMREVISIONDESCRIPTION: REVISION LAST ofSTANDARD PLANS FY 2023-24 SHEETINDEX CLOSED SHOULDER RIGHT PRESENT WHEN WORKERS DOUBLED SPEEDING FINES AHEAD WORK ROAD ROAD WORK END CLOSED SHOULDER RIGHT AHEAD WORK ROAD ROAD WORK END 22102-602 TWO-LANE AND MULTILANE, WORK ON SHOULDER 11/01/20 6" White (See Note 7) Median Median BL/3 L/3 10' Min. X XX X XX X SYMBOLS: Work Zone Sign Work Area Channelizing Device (See Index 102-600) Lane Identification and Direction of Traffic (See Note 8) W21-5a (See Note 8) W21-5a WITH WORK ZONE SPEED OF 45 MPH OR LESS SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY MULTILANE ROADWAY SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY MULTILANE ROADWAY W20-1F (See Note 6) MOT-13-06 (See Note 6) G20-2 W20-1F (See Note 6) G20-2