PRE- CONSTRUCTION REQUIREMENTSi L:LtJ
7 `
Japp;` CITY OF ATLANTIC BEACH
r A j 800 SEMINOLE ROAD
1- ATLANTIC BEACH,FL 32233
904)247-5800
P-1.01119
BULLETIN 2-18
To:All Permit Applicants.
From: Dan Arlington, CBO
City Building Official
Date: May 9, 2018
Re: PRE-CONSTRUCTION, FORM BOARD, AND FINAL POST-
CONSTRUCTION SURVEYS REQUIRED.
Per COAB, Section 24-66(a), a PRE-CONSTRUCTION TOPOGRAPHICAL SURVEY and a POST-
CONSTRUCTION TOPOGRAPHICAL SURVEY are required for any new development.
Sec.24-66.-Stormwater,drainage,storage and treatment requirements.
a) Topography and grading. All lots and development sites shall be constructed and graded in such a manner so that the
stormwater drains to the adjacent street, an existing natural element used to convey stormwater(see section 22-303,
definitions: Stormwater management system),or a city drainage structure after meeting onsite storage requirements, as set
forth within this section.The city shall be provided with a pre-construction topographical survey prior to the issuance ofa
development permit and a post-construction topographical survey prior to the issuance of a certificate of occupancy.
Elevations in all topographic surveys will be referenced to NAVD 1988. Said surveys shall be prepared by a licensed Florida
surveyor,and the requirement for either or both surveys may be waived by the director of public works if determined to be
unnecessary.
1. A pre-construction topographical survey must be provided with the building permit
application for any new development over 400 square feet.
2. A site survey, showing Finished Floor Elevation (FFE), Building Restriction Lines (BRL),
and distances to property lines must be on site for the Slab Inspection, where the proposed
structures are less than 0.5 feet from any BRL.
NOTE: A Form Board Elevation Certificate, signed by a licensed surveyor, may suffice, where
the proposed structures are greater than 0.5 feet from all BRLs.
Blank Form Board Certificates are provided by the City)
3. A final post-construction topographical survey must be provided before the Final
Inspections can be scheduled.
Page 1 of 2
The surveys must be prepared by a licensed surveyor, drawn to scale, and should be of
sufficient size and clarity to indicate the location, nature, and extent of the new work and the
existing structures on the site. The surveys must also show the locations and dimensions of the
following: all impervious surfaces, pavers (new and previously existing, not removed by
construction), setbacks, distances from lot lines, finished floor elevation, street address, site
drainage patterns, and established finished grades. Where on-site stormwater retention is
required, elevations must be shown to fully define the retention areas.
All elevations should reference NAVD 1988 and the elevation and location of the benchmark
for the survey should be indicated.
If the structure is located in a flood zone, please provide finish floor elevations for all floor
levels, including garages, enclosures, and habitable spaces. Additionally, a preliminary FEMA
Elevation Certificate is required before the slab is poured and a final Elevation Certificate is
required before final C.O. inspection, per FEMA and NFIP Guidelines.
Other features to be shown include flood zone boundary lines, base flood elevations (BFE),
flood ways, the Coastal Construction Control Line (CCCL), all easements, storm water
retention areas, all storm water requirements of COAB, Land Development Regulations,
Section 24-66 and any other development features.
All fill dirt must be approved by Public Works before delivery.
The pre-construction, form board, and final post-construction surveys are important documents
for ensuring adequate drainage throughout neighborhoods, code compliance, and archiving this
information in the permanent record. We appreciate your cooperation in this matter.
DJA 5/9/2018