507 Aquatic Gardens RERF24-0154 Destructive Roof In-Progress 8-28-2024 City of Jacksonville i PERMIT NO. Planning and Development Building Inspection Division OFFICE USE ONLY Application for: Approved by: Destructive Roofing-In-Progress Inspection Date Approved: ROOFING-IN-PROGRESS INSPECTIONS A Roofing-In-Progress Inspection is a required inspection per the Florida Building Code—Existing Building (FBC-EB). The purpose of the inspection is to confirm any required deck nailing has been completed and proper installation of a secondary water barrier as required by Rule 9B-0475, This required inspection was not requested by the contractor prior to completing the shingle installation for the above referenced permit, and now a Destructive Roofing-In- Progress inspection must be performed by removing certain portions of shingles and/or underlayment to insure compliance with state law. Not complying with this requirement could affect your insurance coverage for storm damage. Owner Affirmation I understand that the contractor, for the reason listed below, was unable to acquire a Passed Roofing-in-Progress Inspection. i also understand the Destructive Roof in Progress Inspection will require the Contractor to remove and replace shingles and/or underlayment as required by the City of Jacksonville Building Inspection Division to verify work is in compliance with all state and local codes. �p Before me this 40 day of PM IA5+ has personally appeared In th-e`_C�unty of Duval,State of Florlda, Signed: himself/herselfand affirms all tements and de�aratlonsh herein are erein b acce. Q � L Property Owner Notary Public at Large,State of to t^I "'"°` DONiVAl.BARjlE Personally known County of Ga✓6t 5 = MY $$ppt IDType: FL pr °r Produced identffication�_ ;.- COMMI 16,�,���HH r r IV r Lr ea-e�S e14 .•OP�O'O•Q..-�-�Tom_.�public VIId NNW�,RY Contractor Affirmation Company: Address of Project: Requested By: Reason for Request: r f r r —� �L' f j 1, �� � ��kr I' outlined in Bulletin G-04-08. 1 also als~ndnthesDestructive nd City f Roofing-in-ProgrJacksonville ess inspectionng iisDnot pat of those procedures and is an exception to the procedure. In addition, I understand that any non-code compliant work identified during this inspection may result in the assessmdnt of additional re-inspection fees. Signed: Date: An Approved Copy of this Application Must be On-Site at Time of Destructive Roofing-in-Progress Inspection BUILDING AND INSPECTION DIVISION ?;IY Itle, January 16,2016 Where Florida$egim. MEMORANDUM Bulletin R-01-15 TO: All Permit Applicants. FROM. Thomas H.Gbldsbuiy,P.E.,C.B.O. Chief,Building Inspection Division RE: Destructive Roofing-In-Progress Inspections The Florida Building Code-Existing Building(FBC-EB)requires a Roofing-in-Progress inspection to confirm any required deck nailing has been.completed and the proper installation of a secondary water barrier,per Rule 9B-0475. Effective immediate) where the shingles (or other material)have been coinpleted without obtaining a passed Roofing--in-PrO. ess inspection, the attached application for a Destructive Roofing In.-Progress Inspection must be completed,approved by one of the ' Building Inspection Supervisors,and be on site for the scheduled inspection. Procedures for obiaining destructive roofing-in-progress inspection: 1. Obtain an Application for Destructive Roofing-In-Progress(R-1-P)and complete It. The application does require a notar6d signature from the homeowner. 2. Schedule Destructive R-I-P in same manner as other inspections. Please note the fact this inspection is a Destructive R-1-P in the-scheduling comments. 3. At the time of the inspection,the roofing contractor must have onsite: A. Installers able to,perform all necessary work in a timely manner, B. All permit documents. This includes a copy of the approved Application for Destructive Roofing-In-Progress,as well as installation instructions as published in the State of Florida Product Approval database for all products installed(shingles,underlayment,etc.),and C. Enough new materials(shingles, underlayment,etc.)to replace the materials removed, These products are required to be Installed per the published installation instructions. 4. As selected by the COJ Building Inspector,the roofing contractor will be required to remove multiple portions of the roofing materials so that compliance with all state and local requirements can be verified. This Includes attachment of all new materials(shingles, underlayment,etc.)as well as prescribed roof deck nailing. DEPARTMENT OF PLANNING AND DEVELOPMENT 214 Hogan St.N., Room 273 Jacksonville, FI.32202 Phone:904630-1100 Fax:904 255-8504 www.00j.net S. All materials must be removed to the extent to Insure installation of all new materials comply with published installation instructions. 6. If the inspection passes,the roofer will be responsible to install all new materials as required by the Florida Building Code, The roofing contractor will be responsible to schedule the Final inspection after the installation of new materials is complete. 7. If the inspection does not pass,the roofing contractor may be required to remove all roofing materials from the roof to ensure the roofing replacement is in compliance with the Florida Building Code. DEPARTMENT OF PLANNING AND DEVELOPMENT 214 Hogan St. N.,Room 273 Jacksonville,FI.32202 Phone:904 630-1100 Fax:904 255-8504 www.coj.net