No preview available
 /
     
666 Aquatic Dr ROOF24-0059 permitOWNER:ADDRESS:CITY:STATE:ZIP: GONZALEZ CARLOS ET AL 3304 A STREET SAN DIEGO CA 92101-2421 COMPANY:ADDRESS:CITY:STATE:ZIP: TOWNSEND ROOFING & CONSTRUCTIONS SERVICE 1740 Cocoanut Road Unit 101 JACKSONVILLE FL 32224 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 171818 5222 AQUATIC GARDENS JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 666 AQUATIC DR ROOF NON SHINGLE Shingle and flat roof replacement $7685.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $90.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $45.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.03 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $139.03 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 9/30/2024 PERMIT NUMBER ROOF24-0059 ISSUED: 9/30/2024 EXPIRES: 3/29/2025 ROOF NON SHINGLE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 2 of 2Issued Date: 9/30/2024 PERMIT NUMBER ROOF24-0059 ISSUED: 9/30/2024 EXPIRES: 3/29/2025 ROOF NON SHINGLE PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing Dry-In Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In -Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department - Phone: 904-247-5826 - Email: Building-Dept@coab.us Public Works/Utilities - Phone: 904-247-5834 Fire Department - Phone: 904-630-4789 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION DESCRIPTION ACCOUNT QTY PAID PermitTRAK $139.03 ROOF24-0059 Address: 666 AQUATIC DR APN: 171818 5222 $139.03 BUILDING $90.00 BUILDING PERMIT 455-0000-322-1000 0 $90.00 BUILDING PLAN REVIEW $45.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $45.00 STATE SURCHARGES $4.03 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.03 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R28509 $139.03 Printed: Monday, September 30, 2024 9:58 AM Date Paid: Monday, September 30, 2024 Paid By: TOWNSEND ROOFING & CONSTRUCTIONS SERVICE Pay Method: CREDIT CARD 10325479534 1 of 1 Cashier: KW Cash Register Receipt City of Atlantic Beach Receipt Number R28509 How to Prepare for Your LIBERTY™ Project Before you begin, read these instructions thoroughly to understand how the entire system works, when and where to use each component, and how to avoid common mistakes. For more information, please visit gaf.com/LIBERTY or call GAF Technical Services at 877-GAF-ROOF. Where and How to Use the LIBERTY™ SBS Self-Adhering Roofing System • For 2-ply system, install on appropriate substrates with slopes between 1/4:12 and 3:12. • Roof area should be 2,500 sq. ft. [185.8 sq. m] or less. • Ideal installation temperatures should be between 45°F (7°C) and 95°F (35°C) to ensure proper adhesion. • Install over clean, smooth, dry surfaces free of dirt, debris, and damage. • Appropriate substrates include: – Untreated, Exposure 1, Exterior Grade APA–rated plywood or OSB. – Tongue and groove edges or full blocking required. – Dimensional tongue and groove wood plank. – Should be compliant with local building codes. Safety First 1 To protect yourself and others, follow common-sense safety precautions, including: • Work with a partner; GAF recommends at least 2 people install LIBERTY™ SBS Self-Adhering Roofing. • Follow all applicable OSHA and local safety requirements, including fall protection. • Follow local building codes. • Wear appropriate (PPE) personal protective equipment, including but not limited to protective footwear, eyewear, and gloves. LIBERTY™ SBS Self-Adhering 2-Ply Roofing System: • Be aware of your surroundings; identify and stay clear of power lines and other potential hazards. • Be familiar with the product data sheets. LIBERTY™ Roof System Materials Required • LIBERTY™ Asphalt Primer or MATRIX™ 307 Asphalt Primer complying with ASTM D41 • LIBERTY™ Self-Adhering Base/Ply Sheet; each roll is approximately 200 sq. ft. (18.6 sq. m). • LIBERTY™ Flashing Cement or MATRIX™ 201 Premium SBS Flashing Cement complying with ASTM D4586 seals laps and T-joints. • LIBERTY™ Self-Adhering Cap Sheet; each roll is approximately 100 sq. ft. (9.3 sq. m). • Metal Edge Flashing for covering roof perimeter edges. Metal flashings are typically sold in 10-foot (3.0 m) sections and must be primed with asphalt primer. • Wood Fiber Cant Strips • Roofing nails Step 1: Prepare/Repair the Roof Deck • Remove the existing roof(s) 1. Inspect the roof deck to verify it meets the minimum deck requirements identified above. 2. Replace the damaged deck with like materials as necessary. • New construction installations 1. Inspect the roof deck to verify it meets the minimum deck requirements identified above. Step 2: Prime the Roof Deck 1. Apply LIBERTY™ Asphalt Primer (or ASTM D41 equivalent) at the rate of ½ gallon per 100 sq. ft. (0.20 liters/100 m2). 2. Allow the primer to dry. Step 3: Install LIBERTY™ Self-Adhering Base/Ply Sheet 1. Cut length to manageable length (a length that allows for a wrinkle free installation), 10’ suggested. 2. Cut the first roll (starter course) to ½ width of the roll; 19 11/16: 3. Starting at the low point of the roof, install the first course off Base/Ply Sheet overlapping 6” (152 mm) on ends to complete the first course. 4. Extend past all roof edges and cover the exposed vertical edges 1½”. 5. While holding the membrane in position, remove the release film from left to right or right to left. Carefully hand-press the sheet into place, avoiding wrinkles and trapped air while maintaining proper alignment. 6. Continue with the first course, across the length of the roof, overlapping each 10 foot length by 6” (152 mm). 7. At each 6” (152 mm) end lap, cut the top and bottom corners of the bottom sheet at a 45-degree angle, and cut the top corner of the top sheet at a 45-degree angle. Install the upper portion of the roll just as the bottom half was installed, working from the center of the sheet outward toward the ends. Firmly hand-press the sheet to avoid wrinkles and trapped air. INSTRUCTIONS What Tools and Equipment Do I Need to Install a LIBERTY ™ SBS Self-Adhering Roofing System? Safety Glasses Gloves Hammer Utility Knife Trowel Brush Tape Measure Weighted Roller Caulk Gun Roller 4" (102 mm) min. Side Lap 39 3/8" (1 m) Sheet 19 5/8" (498 mm) Sheet LIBERTY™ Self-Adhered Cap Sheet 39 3/8" (1 m) Sheet LIBERTY™ Self-Adhered Base Sheet Primed Wood Deck Figure 1 8. Complete the installation of the first course with a weighted roller over the entire sheet to ensure full contact with the deck. 9. Align the next sheet (second and succeeding courses), as needed, to complete the roof, overlapping the previous Base/Ply sheet by a minimum of 3” (76.2 mm). Install as above. Stagger or offset end laps from adjacent sheet to a minimum of 36” (914 mm). 10. Carefully work each sheet into the laps without wrinkles or trapped air. Firmly hand-press the sheet and complete the side lap by rolling with a weighted roller. Step 4: Install Metal Edge Flashing 1. Prime the top and bottom of the horizontal flange of the edge metal and allow it to dry. 2. With a trowel, apply LIBERTY™ Flashing Cement to the LIBERTY™ Base/Ply Sheet where the top flange of the edge metal will be nailed. 3. Set the edge metal into the LIBERTY™ Flashing Cement. 4. Fasten the edge metal with two rows of roofing nails staggered at 4” (101.6 mm) on center. Do not nail through the overlap. 5. Overlap each 10-foot length of edge metal approximately 2” (50.5 mm). Do not nail through the 2” overlap. 6. Install the LIBERTY™ Cap Sheet, over the primed edge metal, approximately 1/4” from the edge of the metal. Step 5: Curb, Wall, and Shingle Transitions and Flashings — Base/Ply Sheet 1. Prior to installing the LIBERTY™ Cap Sheet, the Base/Ply Sheet is to be installed at all flashings. 2. Walls, curbs, and shingle roof decks must be primed with LIBERTY™ Asphalt Primer complying with ASTM D41. 3. Cant strips are to be installed at all 90-degree transitions, such as walls and curbs. Transitions greater than 90-degrees, such as shingle tie-in, do not require a cant strip. 4. Cant strips to be set in place without any securement, loose laid. 5. Cut the Base/Ply Sheet to extend 4” out onto the roof deck and a minimum of 8” up or to the top of curbs and walls. 6. Remove the release film and firmly hand-press the sheet to avoid wrinkles and trapped air. 7. Continue the length of wall, curb, and shingle transition, overlapping the selvage edge 4”. Step 6: Pipe Penetration Flashing *When necessary* 1. Prime the top and bottom of the horizontal flange of lead flashing with LIBERTY™ Asphalt Primer, complying with ASTM D41. 2. With a trowel, apply LIBERTY™ Flashing Cement to the LIBERTY™ Base/Ply Sheet where the top flange of the flashing metal will be installed. 3. Install the lead flashing over the penetration and into the LIBERTY™ Flashing Cement on the LIBERTY™ Base/Ply Sheet. 4. Install a target of LIBERTY™ Base/Ply Sheet over the lead flange, extending 6” beyond all edges. 5. Install the LIBERTY™ Cap Sheet over the LIBERTY™ Base/Ply Sheet. Step 7: Install LIBERTY™ Self-Adhering Cap Sheet 1. Cut a full-width roll (39 5/8”) of the first Cap Sheet to a manageable length. Make sure the length is 36” shorter than the Base/Ply Sheet to create the required 36” stagger. 2. Start at the low point of the roof and align with the edge metal, with the selvage edge (see figure 1) at the high side of the roof. 3. Fold back the top half of the Cap Sheet and remove the split-release film (upper half only) from the underside of the Cap Sheet. Do not remove the release film from the selvage edge. 4. Gradually roll the upper half of the Cap Sheet back into place, making sure that the lower edge remains aligned with the drip edge. 5. Remove the release film from the folded-back Cap Sheet. Gradually roll the Cap Sheet back into place, making sure it aligns with the metal drip edge. 6. Apply even pressure with a weighted roller, over the entire area of the Cap Sheet (from center to edges) to eliminate air bubbles and wrinkles. 7. Align the next sheet of Cap Sheet as needed, to complete the first course across the roof, overlapping the previous Cap Sheet a minimum of 6” (152mm). Prepare the end lap just as the Base/ Ply Sheet end lap was prepared above, except do not adhere to the overlapping area. Stagger the end laps from adjacent courses by a minimum of 36” (914 mm). 8. Lightly trowel Flashing Cement to the 39 3/8” x 6” (1 m x 152 mm) end lap and set the overlap back into place. 9. Complete the installation of the first course with a weighted roller over the entire sheet to ensure full contact with the deck. 10. Firmly roll the overlap area, as well as the entire remaining Cap Sheet. 11. Set the subsequent courses of Cap Sheet, overlapping 4” (102 mm) of the previous course. Make sure each following course overlaps the selvage edge flush to the bottom edge of the release film on the previous course. 12. Remember to apply Flashing Cement to the top edge of the previous course of the LIBERTY™ Cap Sheet. 13. Fold the upper edge of the Cap Sheet back onto itself, exposing one-half of the split-back release film. Remove the release film and gradually roll the Cap Sheet back into place. INSTRUCTIONS Fasteners [3" (76.2 mm) O.C. Staggered] Drip EdgePrime Metal Surface LIBERTY™ Self-Adhered Cap Sheet Flashing Cement LIBERTY™ Self-Adhered Base Sheet - Turn down edge 1 1/2" min. BOTTOM SHEET 36" (914 mm) min. o set 6" (152 mm) min. FlashingCement Clip the leading edgeof the salvage edge at a 45° angle Clip both edgesof the bottom sheetPrimed Lead Flashing, Min. 2.5 – 4 ib. (1.13 – 1.81 kg) - Roll down into pipe 1" (25.4 mm) Pipe Penetration 4" (102 mm) min. Flange Set In Flashing Cement LIBERTY™ Self-Adhered Cap Sheettarget set in Flashing Cement LIBERTY™ Self-Adhered Base Sheet target set in Flashing Cement 8"(203 mm) Primed Curb Cant Strip LIBERTY™ Self-Adhered Base Sheet Fasteners[8" (203 mm) O.C.] Counter-flashing LIBERTY™ Self-Adhered Cap Sheet Flashing Cement Primed Wood Deck Figure 2 Figure 3 Figure 4 Figure 5 ©2023 GAF • RESLB504-PDF-0523GAF Technical Services: 877-GAF-ROOF INSTRUCTIONS 14. Remove the selvage edge release film from the lap area. 15. Going back to the overlapping Cap Sheet, remove the release film and roll the Cap Sheet into place over the LIBERTY™ Base/Ply Sheet, and then overlap the lower Cap Sheet selvage edge. 16. Apply even pressure, with a weighted roller, over the entire roof area of the Cap Sheet (from center to edges). Thoroughly roll all laps to ensure proper adhesion. 17. Cap Sheet shall extend up the face of the cant strip and onto the wall/curb 2” and up the shingle transition a minimum of 8”. Step 8: Curb, Wall, and Shingle Transitions and Flashings — Cap Sheet 1. Prime the LIBERTY™ Cap Sheet installed in the field of the roof 6” (152 mm) out onto the horizontal surface. 2. Cut the Cap Sheet into manageable lengths. 3. Cut the LIBERTY™ Cap Sheet to the proper width to extend to the top of the wall, curb, or 8” up the shingle transition. (See Figure 3 and 6) 4. Secure with roofing nails 6” (152 mm) on center. 5. If the wall or curb is taller than the width of the membrane, nail off the top of the membrane 6” on center. 6. Apply asphalt primer to the top 6” (152 mm) of the LIBERTY™ Cap Sheet, allow to dry, and install another course(s) of LIBERTY™ Cap Sheet, and secure each course with roofing nails 6” (152 mm) on center. 7. Install unit on top of the curb or terminate the top of the wall with the appropriate metal counterflashing. Step 9: Cleaning Up and Maintaining Your LIBERTY™ Roof 1. Remove all tools, materials, and debris from the roof. 2. Dispose of materials properly, following all federal, state, and local laws. 3. Inspect the roof at least annually, and remove any leaves, branches, vegetation, or other debris that may be present. Look for other damage and repair as necessary. 1 Precautionary note: The installation instructions for this product may require the use of primers, adhesives, or cements that contain solvents. Apply solvent-based products ONLY as instructed. Excess application of solvent- based products may affect the performance of this product, delay application of the cap sheet, cause surface blistering of the cap sheet, or result in the asphalt flowing, dripping, or staining. You may notice unpleasant odors from the solvents, which will dissipate when the solvent-based product has dried. Shingle Underlayment Fasteners [8" (203 mm) O.C.] Fasteners[8" (203 mm) O.C.] Flashing Cement yLIBERTY™ Self-Adhered Cap Sheet LIBERTY™ Self-Adhered Base Sheet LIBERTY™ Self-Adhered Cap Sheet — Extend 24" (610 mm) up transition Prime roof deck24" (610 mm) Figure 6