Loading...
715 Amberjack Ln RESO24-0058 TAYLOR DUVAL STORMWATER VOLUME CALCULATIONS (2) (1) 06.17.2024Comp. By: Date:5/10/2024 Public Works Department City of Atlantic Beach Permit No: Address: Required Storage Volume Criteria: Section 24-68 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations requires that stormwater runoff from impervious areas be stored onsite. Volume to be retained is as follows: V = CAR/12 which is the Modified Rational Method for estimating stormwater runoff Where: V = Volume of Runoff to be stored (cubic feet) C = Runoff Coefficient, 0.92, the difference between impervious area (C=1.0) and undeveloped conditions (C=0.08). A = Impervious Area (square feet) R= 25-yr / 24-hr rainfall depth (9.3 inches for Atlantic Beach) Onsite Storage Volume Required for Impervious Area: Lot Area = 7,500 ft2 Impervious Area (A) = 2,962 ft2 =39% V = 0.92 x 2,962.0 x9.3/ 12 V = 2,112 ft3 Provided Storage: Area 1 - Relative Elev. Area Storage Sideslope:3 :1 (ft) (ft 2) (ft 3) 12.1 110 BOTTOM size:36.98 X 2.98 14.8 1,007 TOB size:53 X 19 Area 2 - Relative Elev. Area Storage (ft) (ft 2) (ft 3) 0.0 0 BOTTOM size:0 X 0 0.0 0 TOB size:0 X 0 Area 3 - Relative Elev. Area Storage (ft) (ft 2) (ft 3) 0.0 0 BOTTOM size:0 X 0 0.0 0 TOB size:0 X 0 Inground Storage: = A*d/pf Total Storage Area at TOB (A) =1007.0 ft2 Depth to ESHWT from BOTTOM (d) =2.1 ft, default is 2.0 ft, verify onsite ESHWT Pore Factor (pf) = 0.3 default is 0.4 Inground Storage Provided =634.4 ft3 Required Treatment Volume =2,112 ft3 Supplied Treatment Volume =2,126 ft3 Scott Walker PE 1,491 0 0 ATLANTIC BEACH, FLORIDA 32233 715 AMBERJACK LANE, Retention W.R. for sending (Working Copy) 5/28/2024