Loading...
Police building workshop 1-12 Police Building WorkshopJanuary 10, 2012 Atlantic Beach Police Department department and create inefficienciesThey decrease the effectiveness of the the staffThey present safety risks for the community and provide to the citizensThese deficiencies impact the level of service we many waysThe current police building is severely deficient in Facility OperationsLife SafetySecurity paperworkvehicle with prisoners while completing only 1 cell is useable. Officers have to sit in sometimes –Adult holding facility is inadequate several hours supervising officers tied up for –No juvenile holding area unauthorized staff or the publicscreens should not be in view of any computer -staff or anyone in the building Communication center is unsecured and open to completely open to public accessit is –No protection for emergency generator to no video surveillance inside or outsideLittle evidenceseized or –No secure storage for vehicles No security for Records staff or the documentsNo safe room/interview room off of lobby recycle bins etc…cabinets, finger printing table, shred containers, hallway such as copy machine, storage Fire code violations due to storing equipment in No sprinkler system for fire suppression Main Walkway Heat equipment-servers, electronic equipment and A/Cuniforms etc… stored in areas with Potential fire hazards with records, Equipment Supply & Case Records showers)No Hazmat decontamination area (no functional No safe storage for firearms and ammunition2. No proper storage for hazardous materials1. Lacks ventilationstaffProperty and Evidence area is unhealthy for Evidence Storage Area inefficienciescreates disruptions and -out daily operations Patrol squad room is extremely inadequate to carry ECOs. State certification requirement 2012Officers must come off the street to relieve –Center No break room or restroom facilities in the Dispatch witnesses2. No private area to speak with victims or either Records or Communicationsno handicap window at -1. Non ADA compliant Lobby is too small other trainingservice, roll call, orientation or -No space for insimultaneous operations and activitiesCompetition for space for –No conference room employeesconduct private meetings with citizens or cannot –Multiple people sharing all offices for hours.fingerprints etc… Detectives have to vacate office fuming, –No space to process evidence at city hall)not power most of the servers (nothing powered breaks down frequently and does –inadequate Emergency generator is obsolete and No room to house servers or complete laptop Insufficient storage spaceafter a major storm or other disasterNo space to conduct Emergency Operations materials store drugs, guns, jewelry and hazardous Property/Evidence room lacks design to properly with the holding facilitylocated -Property/Evidence room and office is coevidence overflowSecond holding cell serves as a property and wall to repairthousand dollars to tear up concrete floor and Plumbing broken in adult holding cells. Several No women’s locker roomEvidence contamination due to water damageDamage from AC systems and plumbingprotected from the elements or damageBicycles stored off site and not adequately evidence etc…as vehicles, tires, car parts, large crime scene No space to store and secure large items such Decreases professionalismCreates inefficienciescapable of providing to the citizensDecreases the level of service the department is Would not meet present building codesNon survivable for a critical response facilityNot life safety code compliantNon ADA compliant Questions???