Loading...
NFTPO Update on ARRA projects 2-10-110.33% 0.94% 84.60% 1.48% 88.76% 88.79% 34.98% 0.00% 19.32% 47.60% 12.70% District 2 Las[Updalcd• 01/26/11 LonstruCTIon Lti iviaterlais i esting vroject i oral CONSTRUCTION CONTRACT INFORMATION Bid Piad % paid ARRA 9 FAP FPI 1 CONTRACT J DESCRIPTION WORK MI COUNTY ADVERTISE DATE BID OPEN/ LETTING CONTRACT AWARD DATE AMOUNT BID ARRA PAID TO DATE AMOUNT AWARDED ARRA PAID TO DATE FHWA AUTH AMOUNT ARRA PAID TO DATE ARRA-202-B 208166-2 E2N37 SR 23 (BRANNON FIELD CHAFFEE) OVERPASS AT PLANTATION OAKS BLVD ARRA-201-B 209513-7 E2N34 WIDEN BEACH BLVD FROM HODGES BLVD TO SAN PABLO FROM 3 LANES TO 4 {SR 212) SR 9B / PHASE I FROM US 1/PHILLIPS HWY TO SOUTH OF SR 9A WIDEN SR 200 (A1A) FROM STRATTON ROAD TO GRIFFIN ROAD FROM 2 LANES TO 4 ARRA-549-B 209294-1 E2N35 ARRA-203-B 210687-3 E2N36 NEW CONSTRUCTION ADD LANES & RECONSTRUCT NEW ROAD CONSTRUCTION ADD LANES & RECONSTRUCT Clay 2/2/2009 05/29/09 06/09/09 $7,250,000 57,129,680 $773,778 $610,865 (RFQAdv) Duval 2/2/2009 05/29/09 06/09/09 $12,875,652 57,468,119 $2,191,314 51,381,794 (RFQAdv) Duval 10/05/09 02/11/10 02/19/10 $58,473,000 $17,303,336 $4,641,225 $571,801 $194,000 $117,939 $8,217,778 $7,858,484 $293,690 590,227 $918,000 $63,091 $15,360,656 58,940,140 $64,032,225 $17,938,228 Nassau 2/2/2009 05/29/09 06/09/09 $26,205,000 $13,254,938 $3,055,491 $1,317,700 $677,130 $181,146 $29,937,621 $14,753,784 (RFQAdv) FDOT Selected projects Sum = , , 0 4 ,4 , ARRA-073-B 426231-1 E2N60 ARRA-072-B 426230-1 T2297 ARRA-074-B 426232-1 E2N61 ARRA-600-B 428308-1 E2061 ARRA-051-B 426229-1 E2N59 KINGSLEY AVENUE @ US 17 {SR 15) CONSTRUCT RIGHT TURN LANE PEORIA ROAD {FROM CR 224 TO MOODY RD} OPERATIONAL IMPROVEMENTS KNIGHT BOXX (CR 220B) {FROM SR 21/BLANDING BLVD TO CR 220) RESURFACING MOODY AVENUE FROM: DRS. LAKE ROAD TO: PEORIA RESURFACING CR 214 EAST {FROM SR 100 TO CR 315C} RESURFACING, ADD PAVED SHOULDERS Clay 07/14/09 09/29/09 10/19/09 $352,010 $352,010 $32,412 $32,406 55,727 $3,644 $390,149 $388,060 Clay Clay Clay Clay 06/08/09 07/08/09 07/24/09 07/22/09 09/29/09 10/19/09 04/19/10 05/25/10 06/14/10 07/14/09 09/22/09 10/20/09 5688,566 $682,715 $119,727 $119,726 $633,940 $651,133 $37,061 $37,056 $858,000 $857,769 $86,479 $53,916 51,350,241 51,327,643 $98,889 $98,639 $21,136 $14,909 $829,429 $817,350 $6,545 $3,549 $677,546 $691,738 $15,838 $7,789 $960,317 $919,475 $17,454 $9,601 $1,466,584 $1,435,884 95.63% 58.20% 28.01% 49.28% 4 .1 99.46% 98.54% 102.09% 95.75% 97.91% ARRA-719-B 428307-1 E2091 ARRA-603-B 428314-1 62063 E2087 ARRA-596-B 428311-1 E2055 ARRA-550-B 209293-2 E2N35 ARRA-076-B 426333-1 E2N64 ARRA-597-B 428312-1 E2051 CR 224A/DRS. LAKE DR FROM: BIRDWOOD DRIVE TO: SR 224/KINGSLEY AVE SR 224/KINGSLEY AVE. FROM: PLAINFIELD AVENUE TO: SMITH STREET CR 220 FROM: CR 209 TO: BLANDING BLVD SR 9B FROM SOUTH OF SR9A TO SR 9A 9TH STREET SOUTH {FROM OSCEOLA AVENUE TO FIRST AVENUE SOUTH} 9th STREET FROM: OSCEOLA AVENUE TO: ST. JOHNS C/L SIDEWALK TRAFFIC OPS IMPROVEMENTS WIDENING & RESURFACING NEW ROAD CONSTRUCTION RESURFACE, DRAINAGE, SAFETY, SIGNALS RESURFACING Clay Clay Clay Duval Duval Duval 10/04/10 11/02/10 11/22/10 10/04/10 11/02/10 11/22/10 04/19/10 05/25/10 06/14/10 10/05/09 02/11/10 02/19/10 08/24/09 10/21/09 12/04/09 02/22/10 04/27/10 05/17/10 $203,943 544,583 $839 $118,800 $32,569 $1,455 $1,458,960 $1,312,374 $149,318 $57,885 $10,000,000 50 $1,162,933 $162,883 $3,280,000 $3,269,776 $807,660 $402,997 $1,035,000 $979,009 $102,764 $36,417 $3,405 $0 $251,931 $839 $3,500 $0 $154,869 $1,455 $18,375 $5,809 51,626,653 $1,376,068 $268,500 56,315 511,431,433 $169,198 $89,618 $34,901 $4,177,278 $3,707,674 $7,352 51,332 51,145,116 51,016,759 ARRA-601-B 428315-1 E2062 CAHOON AVENUE FROM: DEVOE STREET TO: CANNON STREET RESURFACING Duval 02/22/10 03/30/10 04/19/10 $159,895 $159,895 $34,619 $31,281 $3,281 $0 $197,795 $191,176 96.65% ARRA-075-B 426210-1 APL80 ALTA DRIVE/NEW BERLIN ROAD {FROM SR 105/Z00 PARKWAY TO SR 9A} RESURFAING, ADD PAVED SHOULDERS Duval 07/15/09 09/15/09 09/28/09 $3,442,001 $1,135,425 $142,752 $107,064 $112,500 $50,969 $3,697,253 $1,293,457 ARRA-068-B 426291-1 T2307 ARRA-077-B 426235-1 E2N58 ARRA-078-B 426296-1 E2N58 CR 2 {FROM GEORGIA STATE LINE TO CR 121) 14TH STREET {FROM BROOME STREET TO POGY PLACE} 8TH STREET {FROM DADE STREET TO PORT OF FERNANDINA} RESURFACING RESURFACING RESURFACING Nassau Nassau Nassau 07/10/09 08/12/09 09/01/09 06/23/09 08/25/09 09/14/09 06/23/09 08/25/09 09/14/09 $333,210 $333,210 N/A N/A $440,340 $440,340 $70,980 $46,163 $46,204 $46,204 $20,848 517,541 $4,805 $4,649 $9,000 51,802 $520,320 $488,305 $1,568 5393 $68,620 $64,138 93.85% 93.47% ARRA-720-B 428868-1 E2092 ARRA-599-B 428310-1 E2065 ARRA-595-B 428304-1 E2060 CR 200A/PAGES DAIRY FR: SR 15 (US 17) TO: FELMORE ROAD CR 107 BLACKROCK RD FROM: WINDSOR DRIVE TO: HERRON ISLES PKWAY SR A1A/SR 200 @ BLACKROCK ROAD RESURFACING SIDEWALK TRAFFIC OPS IMPROVEMENTS Nassau Nassau Nassau 10/11/10 11/09/10 12/01/10 03/22/10 04/27/10 05/17/10 02/22/10 05/25/10 06/17/10 $831,478 $288,550 $812,245 $69,834 $414,697 $96,139 $101,718 $91,908 $7,250 $19,154 $14,903 $0 $942,520 $0 $9,625 $180 $399,893 $77,263 $8,750 $717 $912,903 $434,568 ARRA-602-B 428306-1 62006 E2078 ARRA-062-B 426334-1 APR84 ARRA-080-B 426236-1 T2302 ARRA-079-B 426214-1 APR84 ARRA-598-B 428303-1 E2054 CR 214 BRIDGE OVER 1-95 BRIDGE REPAIR/REHAB-ILITATION CR 214 {FROM CR 13 TO CR 13A) PIPE AND BOX CULVERT EXTENSIONS 1-95 @ SR 207 {SR 9) RAMP IMPROVEMENTS CR 214 (WEST KING STREET) {FROM CR 13 TO PALMER AVENUE) RESURFACING OLD DIXIE HIGHWAY FROM: SR 312 TO SR 207 RESURFACING St. Johns St. Johns St. Johns St. Johns St. Johns 05/03/10 06/10/10 06/28/10 11/18/09 12/23/09 02/02/10 06/08/09 07/08/09 07/24/09 11/18/09 12/23/09 02/02/10 04/19/10 05/25/10 06/14/10 $123,500 $19,875 $99,305 $12,451 $315,000 $190,602 $24,313 $16,557 $572,802 $572,802 N/A N/A $1,228,000 $1,228,000 $247,602 $234,296 5294,798 $266,704 $62,811 $62,298 $4,375 $234 $227,180 $32,560 $2,704 $284 $342,017 $207,443 $29,476 $12,352 $29,580 529,481 51,505,182 51,491,777 57,452 50 $365,061 $329,001 14.33% 60.65% 99.11% 90.12% ARRA Reporting for FHWA -- Modified formatn by James Bennett for North Florida TPO Board Meeting LEGEND Construction Office Florida Department of Transportation Construction Complete Construction On-going ARRA-604-B 428309-1 62964 E2079 CR 13B/FRUIT COVE ROAD FROM: SR 13 TO:SR 13 RESURFACING St. Johns 05/24/10 06/22/10 07/12/10 $940,930 $128,583 $80,561 $3,091 $17,660 $261 $1,039,151 $131,935 ARRA-063-B 426335-1 APR84 ARRA-081-B 426274-1 APJ08 ARRA-593-B 428301-1 E2050 ARRA-082-B 426277-1 APJ07 ARRA-594-B 428302-1 E2053 CR 214 {FROM CR 13 TO CR 13A} RESURFACING, ADD PAVED SHOULDERS SIDEWALKS @ VARIOUS LOCATIONS {AT DEL MONTE, VARELLA AND SIDEWALK DURBIN CREEK BLVD.} WEST CASTILLO DRIVE FROM: SR 5 (US1) TO: SR 5A/SAN MARCO AVE. SIDEWALK CR 210 AND RACETRACK ROAD {FROM CR 16A TO US 1/SR5} SIGNAL SYSTEM UPGRADE SR 207 @ SR 312 TRAFFIC OPS IMPROVEMENTS PO Selected project sum= St. Johns St. Johns St. Johns St. Johns St. Johns 11/18/09 12/23/09 02/02/10 08/20/09 09/30/09 11/17/09 02/22/10 03/30/10 04/19/10 07/15/09 08/26/09 10/06/09 03/22/10 05/25/10 06/14/10 5630,000 $579,897 $89,177 $85,771 $292,340 $292,340 $92,629 $90,067 5128,000 5128,000 $75,630 547,284 $198,206 $198,206 $97,881 $68,963 $853,779 $33,750 $267,607 $6,955 531,910,738 $15,670,794 Construction CEI $10,444 $10,109 $729,621 $675,777 92.62% $11,938 51,360 $396,907 $383,767 96.69% $5,075 $396 $208,705 $175,679 84.18% $17,277 $0 $313,364 $267,169 85.26% $21,000 $0 $1,142,386 $40,705 3.56% L$37,060,475 517,732,235 Materials Testing Project To