671 AMBERJACK LN POOL24-0045 Construction Site ManagementCONSTRUCTION SITE MANAGEMENT JOBSITE ADDRESS: ADAM J KING 671 AMBERJACK LANE ATLANTIC BEACH, FL 32233 1. Parking plan showing how the site will be accessed and all onsite and abutting street parking areas. North side of property there will be access, and parking will be done on the street leaving the road still flowable. 2. Location of construction trailers, loading/unloading area, and material storage area. No trailers and loading and unloading will be done the same as a amazon truck or mulch delivery quick and easy on one side of the street. 3. Location of chemical toilet area: Chemical toilets must be kept out of the City right-of-way and not further than 15 feet from structure and the door shall face the structure that is under construction. Toilet will be kept in north east corner of lot out of way of all above. 4. Dumpsters are to have tarp covers or rigid covers on windy days. Dumpsters must be removed prior to issuance of Certificate of Occupancy or Certificate of Completion. No dumpster is needed 5. Traffic control plan showing access with dimensions, area to be stabilized, narrative on phasing of construction with adequate parking and delivery of materials. The deliveries are small and within the same day, the usual traffic of this location will not be affected due to low traffic on our end. 6. Site cleanliness: Contractor must have the entire construction site cleaned by Friday of each week. This means removal of scrap lumber, concrete remnants, and other such construction debris including cans, metal, plastic, and paper. There will be zero tolerance of site mess or debris. 7. Erosion and Sediment Control: Contractor must maintain all elements of the approved Erosion & Sediment Control Plan (silt fence, catch basin filters, etc.) until sod or other stabilization has been placed and approved by Public Works. All sediment or erosion will be handled same day if there is any. Nothing will sit or stay all will be handled within same hour of removal or altering. 8. Other activities, where special conditions are identified by the Building Official. Will be handled. JOB COPY Public Works Approved 12/16/2024