1954 Francis Ave TREE24-0067 12.24.2024 NOIPERMIT #:TREE24-0067
ADDRESS:1954 Francis Avenue
APPLICANT: Lindsey O'Steen
PHONE: 904-325-4063
EMAIL: linddsey@sellsnefl.com
CATEGORY DBH 8" - 13.9"# OF TREES INCHES OWED DBH 14" - 29.9"# OF TREES INCHES OWED DBH 30"+# OF TREES INCHES OWED TOTAL INCHES
REMOVED PRESERVATION CREDIT TOTAL OWED
OAK 34 34
Oak 20 (double 8" + 12")1 20 and/or
14 1 14
5,100.00$
MARITIME SPECIES
and/or
-$
PALM
and/or
-$
OTHER
Pine and/or
-$
34 34
and/or
5,100.00$
CATEGORY INCHES # OF TREES STAFF NOTES PROPOSED- PLANT PROPOSED- PAY CATEGORY INCHES # OF TREES STAFF NOTES FINAL- PLANT FINAL- PAY
OAK 40" OAK
Live oak 4 5 double credit
MARITIME SPECIES MARITIME SPECIES
PALM PALM
OTHER OTHER
TOTALS 40"
PROPOSED MITIGATION FINAL MITIGATION
DEVELOPED LOT
MITIGATION RATIOS: (inches removed : inches replaced)
DBH 8" -13.9"= 1: 0.5
DBH 14" - 29.9" = 1: 1
TREES REMOVED
DBH 30"+ = 1:2
Status in accordance with the City of Altantic Beach code of ordinances in effect at the time of application submittal.
APPROVDED
DENIED
TPO ADMINISTRATOR DATE
ADDITIONAL INFORMATION:
•The current tree fund rate is $150.00 per inch.
•One shade tree shall be planted or preserved within the required front yard of every lot.
PLANTING REQUIRMENTS
•Oaks must be replaced with oaks and have a 4" caliper and 12' tall at time of planting.
•Maritime Species must be replaced with Maritime Species.
•Mininum 2" caliper for non oaks and 10' tall at time of planting.
•Palms may replace plams.Mininum 8ft clear trunk height at time of planting.
•Maritime species receive double credit when replacing non-Maritime species.
Zoning Approved
12/18/2024
5- 4" live oaks
DEVELOPED LOT
TREE24-0067
TREE REMOVAL PERMIT APPLICATION - EXHIBIT A: Tree Permitting Process 03.15.2024
SIGNATURE OF APPLICANT PRINT OR TYPE NAME DATE
This document provides a general guide of the tree removal permitting process. For complete information on
permitting procedures see Section 23-23. Please sign the bottom of this page to certify that you have read this
document and understand the permitting process.
EXHIBIT A: TREE PERMITTING PROCESS
City of Atlantic Beach
Community Development Department
800 Seminole Road Atlantic Beach, FL 32233
(P) 904-247-5800
1. Submit Completed Application
• All trees on property must be labeled on Exhibits C and D.
2. Schedule Inspections
• All trees to be removed must be labeled with red or orange tape or ribbon and numbered per Exhibit C.
• If there is construction on property, a barricade inspection will also be done at this time.
Call for more information at (904) 247-5847.
3. Mitigation Assessment
• Mitigation shall be in the form of preservation or relocation of existing trees, replacement with new trees or
payment into the tree fund. See Section 23-33 for more information.
• Staff will review the trees proposed for removal and send the applicant a Tree Permit Calculations sheet
which outlines mitigation that is owed.
4. Proposed Mitigation Replacement Plan
• Submit a mitigation replacement plan within 30 days of receiving the mitigation calculations.
• The proposed plan must include a site plan, proposed species, and size(s). Plans must account
for all inches owed.
• A MITIGATION PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO REMOVAL OF IDENTIFIED TREES.
5. Permit Issuance
• When the permit is approved, staff will place a sign in the yard and contact the applicant. This sign must
remain until the permit is finaled.
• If paying for mitigation, payment must be made within 7 days following the issuance of the permit.
6. Mitigation Replacement
• Replacement trees must be planted within 30 days of permit issuance or prior to issuance of a Certificate of
Occupancy or Certificate of Completion.
7. Final Inspection
• After trees are planted and/or construction is complete, a final inspection must be scheduled.
• Trees planted, preserved and relocated must survive three (3) years following the date the permit is finaled.
BEFORE PERMIT ISSUANCE
AFTER PERMIT ISSUANCE