Loading...
Resolution No. 25-23RESOLUTION NO. 25-23 A RESOLUTION OF THE CITY OF ATLANTIC BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER WITH ACON CONSTRUCTION COMPANY FOR THE REPLACEMENT OF THE DUNE WALKOVER AT AHERN STREET; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City awarded ACON Construction Company a design -build contract to rehabilitate and expand the Atlantic Beach Lifeguard Station; and WHEREAS, the existing dune walkover is in poor condition and will be replaced with an American with Disabilities Act (ADA) compliant dune walkover to aid in access to the beach; and WHEREAS, the City received a matching grant for construction of the dune walkover in the amount of $60,000 through the Florida Department of Environmental Protection's Coastal Partnership Initiative program; and WHEREAS, staff completed the design of the new walkover and obtained a Coastal Construction Control Line permit from the Florida Department of Environmental Protection for the construction of the new dune walkover; and WHEREAS, the received a change order request from ACON Construction Company for $125,366.50 to demolish the existing dune walkover and construct the new dune walkover as described in Exhibit A attached hereto and made a part hereof. NOW, THEREFORE, be it resolved by the City Commission of the City of Atlantic Beach as follows: SECTION 1. The City Commission hereby authorizes the City Manager to execute a contract modification with ACON Construction Company for demolition of the existing dune walkover at Ahern Street and construction of a new ADA compliant dune walkover and such other documents as may be necessary to effectuate the purpose of this Resolution. SECTION 2. This Resolution shall be effective immediately upon adoption. ADOPTED at a regular meeting of the City Commission of the City of Atlantic Beach, Florida, I CP day of March 2025. Attest: d oo AA a� Curtis Ford, Mayor Donna L. Bartle, City Clerk Approved as to form and correctness: Jaso G b el, City Attorney Exhibit A ACON Construction Co., IHC. AVAVsVAVAVAVAVAV 3653 Regent Boulevard, Suite 401 • Jacksonville, Florida 32224 • Telephone (904) 565-9060 Fax (904) 565-9080 Feb 27, 2025 City of Atlantic Beach (COAG) 800 Seminole Road Atlantic Beach, FL 32233 Attention: Mr. Steve Swann, P.E. City Engineer Reference: Lifeguard Station Project Beach Walkover Adder COJ DB Contract #71629-22 "Piggyback" Mr. Swann, We are pleased to provide this proposal for the work on the subject project under the guidelines of the referenced contract. The scope of this project phase is to provide the build the walkover at the end of Ahern Street per the permit provided by COAB and the proposal provided by Hayward Construction as attached. We have included a contingency to be utilized by ACON as needed per the base contract. While the contract contingency can be 15%, budget constraint does not accommodate that amount so the $3500.00 contingency is sufficient if no major issues arise. Our Guaranteed Maximum Price (GMP) for the project scope as stated is $125,366.50. The Guaranteed Completion Date (GCD) will be 120 days from receiving an NTP. Breakdowns follow this letter. Please contact me if you have any questions or need further information. Sincerely, Frank Anderson Construction Manager ACON Construction Company DB Coy vract 71629-22 C AB "PIGGYBACKg` Lifegiard Station Walkover Addition t0 Contract DATE: 2/27/25 ITEM # DESCRiP TIONI UNITS S QUANITITYTV,,, N fT COST 17 C) T 4:L COS Project Management Hrs 12 $110.00 $1,320.00 Supervision Hrs 24 $75.00 $1,800.00 Administration Hrs 10 $75.00 $750.00 Hatward Construction per Proposal Al 1 $107,250.00 $107,250.00 Bond Adder AI 1 $2,000.00 $2,000.00 Limited Contingency per Base Contract (Budget Restrained) LS 1 $3,500.00 $3,500.00 Subtotal $116,620.00 DB Fee LS 1 $8,746.50 $8,746.50 TOTAL =$125,366.50