893 Amberjack Ln RES24-0285 energy sheetsFORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 2C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Builder Name:Custom 1 Story 2306 Right SEProject Name:
Duval CountyPermit Office:893 Amberjack LaneStreet:
Permit Number:Atlantic Beach, FL 32233City, State, Zip:
261300Jurisdiction:Ow ner:
Duval (Florida Climate Zone 2)County:FL, Jacksonville NASDesign Location:
1. New construction or existing New (From Plans) Area (ft²)Insulation (R)9. Wall types (2259 ft²)
2. Single family or multiple family Single-Family
298.6713.0Frm wall, 3/8" wood shth, r-13 ca.
1960.0010.0Blk wall, stucco ext, r-10 ext bb.3. Number of units, if multiple family 1 N/Ac.
4. Number of bedrooms N/Ad.4 Area (ft²)Insulation (R)10. Ceiling types (2321 ft²)5. Is this a worst case? No 2320.5038.0Attic ceiling, asphalt shinglesa.
6. Conditioned floor area above grade (ft²) 2306.00 N/Ab.
N/Ac.0Conditioned floor area below grade (ft²)
Area (ft²)R11. Ducts7. Windows (188 ft²) Description Area (ft²)435.886.0Sup: House, Ret: House, AH: Housea.
b.188.42Dbl, 0.290a. U-Factor:
0.26SHGC:
EfficiencykBtu/hr12. Cooling systemsb. U-Factor:
15 SEER232.9Split air source heat pumpa.SHGC:
b.c. U-Factor:EfficiencykBtu/hr13. Heating systemsSHGC:9.5 HSPF225.8Split air source heat pumpa.d. U-Factor:b.SHGC:
14. Hot water systemsft3.368Area Weighted Average Overhang Depth:
Cap: 50 galElectric conventional (50 gal)a.0.260Area Weighted Average SHGC:
UEF: 0.95
8. Floor types (2320.50 ft²) Insulation (R) Area (ft²) Conservation featuresb.
(None)2320.500.0Bg floor, light dry soil, on graa.
N/Ab.
Rad.Bar.;Ceiling Fan;Cross Vent15. CreditsN/Ac.
49.10Total Proposed Modified Loads:Glass/Floor area: 0.081 PASS54.44Total Baseline Loads:
Review of the plans and specificationsI hereby certify that the plans and specifications covered by
this calculation are in compliance with the Florida Energy
Code.
covered by this calculation indicatescompliance with the Florida Energy
Code. Before construction is completed,this building will be inspected forRenee BrownPrepared By______________________________compliance with Section 553.908Florida Statutes.Signature_________________Date___________
I hereby certify that this building, as designed, is in
compliance with the Florida Energy Code.
Building Official Name_____________________Owner/Agent Name________________________
Signature_________________Date__________Signature_________________Date___________
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this projectrequires an envelope leakage test report with envelope leakage no greater than 7.0 ACH50 (R402.4.1.2).
08/15/24
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 3C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
Building Input Summary Report
PROJECT
StreetaddressAddress type:4Bedrooms:Custom 1 Story2306 RightTitle:Lot#:3Bathrooms:FLAsBuiltBuilding Type:Block/Subdivision:2306Conditioned Area:Owner:Platbook:1Total Stories:1# ofUnits:893 Amberjack LaneStreet:NoWorstCase:Builder Name:DuvalCounty:0Rotate Angle:Duval CountyPermit Office:Atlantic Beach,FL 32233City, State, Zip:NoCross Ventilation:261300Jurisdiction:NoWhole House Fan:Single-FamilyFamilyType:SuburbanTerrain:New(From Plans)New/Existing:SuburbanShielding:2024Year Construct:Comment:
CLIMATE
Daily TempDesignHeatingInt Design TempDesign TempIECC RangeMoistureDegree DaysSummerWinter2.5 %97.5 %ZoneTMY SiteDesign Location
Low42906757096342FL_Jacksonville-CrFL, Jacksonville NAS
BLOCKS
VolumeAreaName#
ft³21658.00ft²2306.00House1
SPACES
HeatedCooledFinishedInfil IDBedroomsOccupantsKitchenVolumeArea#
YesYesYes100Noft³476.00ft²51.00laundry1 YesYesYes101Noft³1026.67ft²110.00study/dining2 YesYesYes111Noft³1512.00ft²162.00bed 33 YesYesYes100Noft³487.67ft²52.25bath 24 YesYesYes111Noft³1638.00ft²175.50bed 25 YesYesYes100Noft³2083.67ft²223.25dining6 YesYesYes100Yesft³1785.00ft²191.25kitchen7 YesYesYes100Noft³485.33ft²52.00foyer8 YesYesYes102Noft³3922.33ft²420.25great room9 YesYesYes111Noft³1761.67ft²188.75inlaw suite10 YesYesYes100Noft³396.67ft²42.50bath 311 YesYesYes100Noft³1120.00ft²120.00o. wic12 YesYesYes100Noft³114.33ft²12.25ac13 YesYesYes112Noft³2762.67ft²296.00ow ners14 YesYesYes100Noft³212.33ft²22.75wc15 YesYesYes100Noft³1001.00ft²107.25o. bath16 YesYesYes100Noft³872.67ft²93.50hall17
(Total Exposed Area = 2321 sq.ft.)FLOORS
CarpetWoodTileU-FactorAreaR-ValuePerimeterSpaceFloor Type#
01.000.989ft²51.000ft15laundryBg floor, light dry soil, on grade depth1 01.000.989ft²110.000ft18study/diningBg floor, light dry soil, on grade depth2 01.000.989ft²162.000ft20bed 3Bg floor, light dry soil, on grade depth3 01.000.989ft²52.250ft6bath 2Bg floor, light dry soil, on grade depth4 01.000.989ft²175.500ft27bed 2Bg floor, light dry soil, on grade depth5 01.000.989ft²223.250ft22diningBg floor, light dry soil, on grade depth6 01.000.989ft²191.250ft5kitchenBg floor, light dry soil, on grade depth7 01.000.989ft²52.000ft5foyerBg floor, light dry soil, on grade depth8 01.000.989ft²420.250ft16great roomBg floor, light dry soil, on grade depth9 01.000.989ft²188.750ft32inlaw suiteBg floor, light dry soil, on grade depth10 01.000.989ft²42.500ft0bath 3Bg floor, light dry soil, on grade depth11 01.000.989ft²120.000ft22o. wicBg floor, light dry soil, on grade depth12 01.000.989ft²12.250ft0acBg floor, light dry soil, on grade depth13 01.000.989ft²296.000ft44ow nersBg floor, light dry soil, on grade depth14 01.000.989ft²22.750ft7wcBg floor, light dry soil, on grade depth15 01.000.989ft²107.250ft7o. bathBg floor, light dry soil, on grade depth16 01.000.989ft²93.500ft0hallBg floor, light dry soil, on grade depth17
ROOF
PitchDeckEmittEmittSASolarRadRoofGableRoof
(deg)Insul.TestedTestedAbsor.BarrColorAreaAreaMaterialsType#
230No0.90No0.75YDark483 ft²2514 ft²RoofAsphGable or shed1 230No0.90No0.75YDark94 ft²490 ft²RoofAsphGable or shed2
ATTIC
IRCCRBSAreaVent Ratio (1 in)VentilationType#
NYft²2320.50300VentedFull attic1 NYft²452.00300VentedFull attic2
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 4C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
FORM R405-2023
(Total Exposed Area = 2321 sq.ft.)CEILING
Truss TypeFraming FractionAreaU-FactorR-ValueSpaceCeiling Type#
--0.10ft²51.000.02638laundryAttic ceiling, asphalt shingles roof1 --0.10ft²110.000.02638study/diningAttic ceiling, asphalt shingles roof2 --0.10ft²162.000.02638bed 3Attic ceiling, asphalt shingles roof3 --0.10ft²52.250.02638bath 2Attic ceiling, asphalt shingles roof4 --0.10ft²175.500.02638bed 2Attic ceiling, asphalt shingles roof5 --0.10ft²223.250.02638diningAttic ceiling, asphalt shingles roof6 --0.10ft²191.250.02638kitchenAttic ceiling, asphalt shingles roof7 --0.10ft²52.000.02638foyerAttic ceiling, asphalt shingles roof8 --0.10ft²420.250.02638great roomAttic ceiling, asphalt shingles roof9 --0.10ft²188.750.02638inlaw suiteAttic ceiling, asphalt shingles roof10 --0.10ft²42.500.02638bath 3Attic ceiling, asphalt shingles roof11 --0.10ft²120.000.02638o. wicAttic ceiling, asphalt shingles roof12 --0.10ft²12.250.02638acAttic ceiling, asphalt shingles roof13 --0.10ft²296.000.02638ow nersAttic ceiling, asphalt shingles roof14 --0.10ft²22.750.02638wcAttic ceiling, asphalt shingles roof15 --0.10ft²107.250.02638o. bathAttic ceiling, asphalt shingles roof16 --0.10ft²93.500.02638hallAttic ceiling, asphalt shingles roof17
(Total Exposed Area = 2259 sq.ft.)WALLS
Below
Grade%
Solar
Absor.
Frm.U-Sheathing
R-Value
HeightWidthCavityAdjacent
To Frac.FactorAreaInFtInFtR-ValueSpaceWall TypeOrnt#
00.750.250.0910ft²135.34961413laundryFrm wall, 3/8" woPartition-1 00.750.220.07710ft²93.3490100study/diningBlk wall, stuccoExteriorSE2 00.750.220.07710ft²18.749020study/diningBlk wall, stuccoExteriorSW3 00.750.250.0910ft²51.3496513study/diningFrm wall, 3/8" woPartition-4 00.750.220.07710ft²121.3490130bed 3Blk wall, stuccoExteriorNE5 00.750.250.0910ft²65.3490713bed 3Frm wall, 3/8" woPartition-6 00.750.220.07710ft²51.349650bath 2Blk wall, stuccoExteriorNE7 00.750.220.07710ft²126.0496130bed 2Blk wall, stuccoExteriorNE8 00.750.220.07710ft²121.3490130bed 2Blk wall, stuccoExteriorNW9 00.750.220.07710ft²84.049090diningBlk wall, stuccoExteriorSW10 00.750.220.07710ft²121.3490130diningBlk wall, stuccoExteriorNW11 00.750.250.0910ft²46.7490513kitchenFrm wall, 3/8" woPartition-12 00.750.220.07710ft²46.749050foyerBlk wall, stuccoExteriorSE13 00.750.220.07710ft²149.3490160great roomBlk wall, stuccoExteriorNW14 00.750.220.07710ft²98.0496100inlaw suiteBlk wall, stuccoExteriorNE15 00.750.220.07710ft²116.7496120inlaw suiteBlk wall, stuccoExteriorSE16 00.750.220.07710ft²79.349680inlaw suiteBlk wall, stuccoExteriorSW17 00.750.220.07710ft²93.3490100o. wicBlk wall, stuccoExteriorSE18 00.750.220.07710ft²112.0490120o. wicBlk wall, stuccoExteriorSW19 00.750.220.07710ft²84.049090ow nersBlk wall, stuccoExteriorNE20 00.750.220.07710ft²172.7496180ow nersBlk wall, stuccoExteriorSW21 00.750.220.07710ft²149.3490160ow nersBlk wall, stuccoExteriorNW22 00.750.220.07710ft²60.749660wcBlk wall, stuccoExteriorSW23 00.750.220.07710ft²60.749660o. bathBlk wall, stuccoExteriorSW24
(Total Exposed Area = 42 sq.ft.)DOORS
HeightWidth AreaInFtInFtU-ValueStormsSpaceDoor TypeOrnt#
ft²17.886820.390NonekitchenDoor, wd sc typeN1 ft²24.008030.390NonefoyerDoor, wd sc typeSE2
(Total Exposed Area = 188 sq.ft.)WINDOWS
InteriorOverhangWall
ScreeningShadeSeparationDepthW x H, AreaImpactSHGCU-FactorNFRCPanesFrameIDOrnt#
outdoorNone1 ft 0 in1 ft 4 inft²3'0'' x 5'0'' , 15No0.260.290YesLow-E DoubleVinyl2SE1 outdoorNone1 ft 0 in1 ft 4 inft²3'0'' x 5'0'' , 15No0.260.290YesLow-E DoubleVinyl5NE2 outdoorNone1 ft 0 in1 ft 4 inft²3'0'' x 5'0'' , 15No0.260.290YesLow-E DoubleVinyl9NW3 outdoorNone1 ft 0 in1 ft 4 inft²3'0'' x 5'0'' , 15No0.260.290YesLow-E DoubleVinyl11NW4 outdoorNone1 ft 0 in1 ft 4 inft²3'1'' x 5'0'' , 15No0.260.290YesLow-E DoubleVinyl11NW5 outdoorNone1 ft 0 in9 ft 4 inft²6'0'' x 8'0'' , 48No0.260.290YesLow-E DoubleTIM14NW6 outdoorNone1 ft 0 in1 ft 4 inft²3'0'' x 5'0'' , 15No0.260.290YesLow-E DoubleVinyl16SE7 outdoorNone1 ft 0 in1 ft 4 inft²6'0'' x 2'0'' , 12No0.260.290YesLow-E DoubleVinyl18SE8 outdoorNone1 ft 0 in1 ft 4 inft²6'0'' x 5'0'' , 30No0.260.290YesLow-E DoubleVinyl22NW9 outdoorNone1 ft 0 in1 ft 4 inft²4'0'' x 2'0'' , 8No0.260.290YesLow-E DoubleVinyl24SW10
GARAGE
Exposed Wall InsulationAvg. Wall HeightExposed Wall PerimeterCeiling AreaFloor Area#
109 ft61 ft452 ft²452 ft²1
INFILTRATION
ACH 50ACHEqLAELACFM 50SLAMethodScope#
7.000.55261.0139.025270.000419Blower DoorWholehouse1
HEATING SYSTEM
DuctsBlockCapacityEfficiencySubtypeSystem Type#
sys#1133.0 kBtu/hr9.5 HSPF2Split air source heat pump1
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 5C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
FORM R405-2023
COOLING SYSTEM
DuctsBlockSHRAir FlowCapacityEfficiencySubtypeSystem Type#
sys#110.701160 cfm34.8 kBtu/hr15 SEER2Split air source heat pump1
HOTWATER SYSTEM
ConservationSetPntUseCapEFLocationSubtypeSystem Type#
None120 °F70 gal50 gal0.95 UEFElectric conventional1
DUCTS
HVAC #PercentCFM 25AirReturn ------------------Supply ------------------CoolHeatRLFQNLeakageOutHandlerLeakage TypeAreaLocationAreaR-ValueLocation#
110.086.00(Default)HouseDefault Leakage0 ft²House436 ft²6.0House1
TEMPERATURES
Ceiling Fans:NProgrammable Thermostat:
Dec]X[Nov]X[Oct]X[Sep]X[Aug]X[Jul]X[Jun]X[May]X[Apr]X[Mar]X[Feb]X[Jan]X[Cooling Dec]X[Nov]X[Oct]X[Sep]X[Aug]X[Jul]X[Jun]X[May]X[Apr]X[Mar]X[Feb]X[Jan]X[Heating
Dec]X[Nov]X[Oct]X[Sep]X[Aug]X[Jul]X[Jun]X[May]X[Apr]X[Mar]X[Feb]X[Jan]X[Venting
HoursFlorida Building Code, 8th Edition
(2023)
Thermostat Schedule:
121110987654321Schedule Type
757575757575757575757575AMCooling (WD)757575757575757575757575PM
757575757575757575757575AMCooling (WEH)
757575757575757575757575PM
727272727272727272727272AMHeating (WD)727272727272727272727272PM
727272727272727272727272AMHeating (WEH)
727272727272727272727272PM
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 6C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX = 90
The lower the EnergyPerformance Index, the more efficient the home.
1. New home or addition 12.Ducts,location & insulation levelNew(From Plans)1. _______________
6.0R______________a. Supplyducts:
2. Single-familyor multiple-family Single-Family2. _______________ R______________b. Return ducts:House______________c. AHU location:
3. Number ofunits,ifmultiple-family 13. _______________
32.9______________Capacity13.Cooling systems
4. Number ofbedrooms 15.00______________SEERa. Split system:44. _______________
______________SEERb. Single package:
5. Is this a worstcase? (yes/no) No5. _______________ ______________SEER/COPc. Ground/water source:
______________EERd. Room unit/PTAC:
6. Conditioned floor area (ft²) 2306.006. _______________ ______________e. Other:
7. Windows,type and area* 25.8______________Capacity14.Heating systems
9.50______________HSPFa. Split system heat pump:Dbl,0.2907a.______________a. U-Factor:
______________HSPFb. Single package heatpump:0.267b.______________b. Solar Heat Gain Coefficient (SHGC):
______________COPc. Electric resistance:1887c.______________c. Area (ft²)
______________AFUEd. Gas furnace, natural gas:
8. Skylights ______________AFUEe. Gas furnace, LPG:
______________f. Other:8a.______________a. U-Factor:
8b.______________b. Solar Heat Gain Coefficient (SHGC):
15.Waterheating systems
9. Floor type,insulation level 0.95 UEF______________a. Electricresistance:
______________b. Gas fired,natrual gas:0.09a.______________a. Slab-on-grade (R-value):
______________c. Gas fired, LPG:9b.______________b. Wood,raised (R-value):
______________d. Solar system with tank:9c.______________c. Concrete,raised (R-value)
______________e. Dedicated heatpump with tank:
10 Wall type and insulation: ______________HeatRec%f.Heat recoveryunit:
______________g. Other:a. Exterior:
10a1.____________1. Wood/mtl frame (Insulation R-value):
16.HVACcredits claimed (Performance Method)10.010a2.____________2. Masonry(Insulation R-value):
Yes______________a. Ceiling fans:b. Adjacent:
Yes______________b. Cross ventilation:13.010b1.____________1. Wood/mtl frame (Insulation R-value):
______________c. Whole house fan:10b2.____________2. Masonry(Insulation R-value):
______________d. Multizone cooling credit:
11.Ceiling type and insulation level ______________e. Multizone heating credit:
______________f.Programmable thermostat:38.011a._____________a. Under attic (R-value):
11b._____________b. Single assembly(R-value):
11c._____________c. Knee walls/skylightwalls (R-value)
Yes11d._____________d. Radiantbarrier installed
*Label required bySection R303.1.3 ofthe Florida Building Code,EnergyConservation,ifnotDEFAULT.
Icertifythat this home has complied with the Florida Building Code,EnergyConservation,through the above energysaving features
which will be installed (or exceeded) in this home before final inspection. Otherwise,a new EPL DisplayCard will be completed
based on installed Code compliantfeatures.
Builder Signature: _________________________ Date: ______________________
Address of New Home: _____________________
893 Amberjack Lane Atlantic Beach,FL 32233City/FLZip: _________________
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 7C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
FORM R405-2023
Florida Building Code, Energy Conservation, 8th Edition (2023)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
PERMIT #:893 Amberjack LaneADDRESS:
Atlantic Beach,FL 32233
MANDATORY REQUIREMENTS - See individual code sections for full details.
SECTION R401 GENERAL
The building official shall require that an energy performance level (EPL)R401.3 Energy Performance Level (EPL) display card (Mandatory).
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
(Section 553.9085, Florida Statues) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. completed and signed by the builder The building official shall verify that the EPL display card accurately reflects the
plans and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix RD.
SECTION R402 BUILDING THERMAL ENVELOP
The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements ofR402.4 Air leakage (Mandatory).
Sections R402.4.1 through R402.4.5.
Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted toException:comply with Section C402.5.
The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealingR402.4.1 Building thermal envelope.
methods between dissimilar materials shall allow for differential expansion and contraction.
The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordanceR402.4.1.1 Installation.
by the code official, an approved third party shall inspect all components and verify compliance.
The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air changesR402.4.1.2 Testing.
per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Dwelling units with an air leakage rate less
than three air changes per hour shall be provided with whole-house mechanical ventilation in accordance with Section R403.6.1 of this code
and M1507.3 of the Florida Building Code, Residential. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a
pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individual as defined in Section 553.993(5) or (7), Florida Statutes,
or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or an approved third party. A written report of the results of the
test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation
of all penetrations of the building thermal envelope.
Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existingException:buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended
weatherstripping or other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond
intended infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
7. If an attic is both air sealed and insulated at the roof deck, interior access doors and hatches between the conditioned space volume
and the attic shall be opened during the test and the volume of the attic shall be added to the conditioned space volume for purposes
of reporting an infiltration volume and calculating the air leakage of the home.
New wood-burning fireplaces shall have tight-fitting flue dampers or doors, and outdoor combustion air. WhereR402.4.2 Fireplaces.
using tight-fitting doors on factory-built fireplaces listed and labeledin accordance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight-figging doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907.
Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm perR402.4.3 Fenestration air leakage.
square foot (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or
AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
Site-built windows, skylights and doors.Exception:
In Climate Zones 3 through 8, where open combustion air ducts provide combustionR402.4.4 Rooms containing fuel-burning appliances.
air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope
or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope
requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door
into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion
air duct shall be insulated where it passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 8C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
MANDATORY REQUIREMENTS - (Continued)
Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakageR402.4.5 Recessed lighting.
between conditioned and unconditioned spaces. All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
Air-sealed electrical and communication boxes that penetrate the air barrier ofR402.4.6 Air-Sealed Electrical and Com munication Boxes.
the building thermal envelope shall be caulked, taped, gasketed, or otherwise sealed to the air barrier element being penetrated.
Air-sealed boxes shall be buried in or surrounded by insulation. Air-sealed boxes shall be marked in accordance with NEMA OS 4.
Air-sealed boxes shall be installed in accordance with the manufacturer's instructions.
SECTION R403 SYSTEMS
R403.1 Controls
At least one thermostat shall be provided for each separate heating and cooling system.R403.1.1 Thermostat provision (Mandatory).
Heat pumps having supplementary electric-resistance heat shall have controlsR403.1.3 Heat pump supplem entary heat (Mandatory).
that limit supplemental heat operation to only those times when one of the following applies:
1. The vapor compression cycle cannot provide the necessary heating energy to satisfy the thermostat setting.
2. The heat pump is operating in defrost mode.
3. The vapor compression cycle malfunctions.
4. The thermostat malfunctions.
All ducts, air handlers, filter boxes and building cavities that form the primary air containment passagewaysR403.3.2 Sealing (Mandatory).
for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7),
Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i), Florida Statutes, to be "substantially leak free" in
accordance with Section R403.3.3.
R403.3.2.1 Sealed air handler.
of the design air flow rate when tested in accordance with ASHRAE 193.
Ducts shall be pressure tested to determine air leakage by one of the following methods:R403.3.3 Duct testing (Mandatory).
1. Rough-in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the
manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test.
2. Post construction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the
entire system, including the manufacturer's air handler enclosure. All registers shall be taped or otherwise sealed during the test.
Exceptions:
1. A duct leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required
for Section R405 compliance where credit is taken for leakage, and a duct air leakage Qn to the outside of less
than 0.080 (where Qn = duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals)
is indicated in the compliance report for the proposed design.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
Building framing cavities shall not be used as ducts or plenums.R403.3.5 Building Cavities (Mandatory).
Mechanical systempiping capable of carrying fluids above 105°F (41°C)R403.4 Mechanical system piping insulation (Mandatory).
or below 55°F (13°C) shall be insulated to a minimum of R-3.
Piping insulation exposed to weather shall be protected from damage, including thatR403.4.1 Protection of piping insulation.
caused by sunlight, moisture, equipment maintenance, and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
Heated water circulation systemsR403.5.1 Heated water circulation and temperature maintenance systems (Mandatory).
shall be in accordance with Section R403.5.1.1. Heat trace termperature maintenance systems shall be in accordance with Section
R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
Heated water circulation systems shall be provided with a circulation pump. The systemR403.5.1.1 Circulation system s.
return pipe shall be dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation
systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification
of a demand for how water within the occupancy. The controls shall automatically turn off the pump when the water in the
circulation loop is at the desired temperature and when there is no demand for hot water.
Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for suchR403.5.1.2 Heat trace systems.
systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping
in accordance with the times when heated water is used in the occupancy.
Where installed, demand recirculation water systems shallR403.5.2 Demand recirculation water systems (Mandatory).
have controls that comply with both of the following:
1. The controls shall start the pump upon receiving a signal from the action of a user of a fixture or appliance, sensing the
presence of a user of a fixture or sensing the flow of hot or tempered water to a fixture fitting or appliance.
2. The controls shall limit the temperature of the water entering the cold w ater piping to not greater than 104ºF(40ºC).
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 9C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
MANDATORY REQUIREMENTS - (Continued)
Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heatR403.5.5 Heat traps (Mandatory).
traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 1/2 inches (89 mm) in the hot water distribution line and cold water line located as close as
possible to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1 Storage w ater heater temperature controls.
Service water heating systems shall be equipped with automatic temperature controlsR403.5.6.1.1 Automatic controls.
capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum
temperature setting range shall be from100°F to 140°F (38°Cto 60°C).
A separate switch or a clearly marked circuit breaker shall be provided to permit the power suppliedR403.5.6.1.2 shut dow n.
to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main
burner(s) of combustion types of service water heating systems to be turned off.
Water heating equipment installed in residential units shall meet the minimum efficiencies ofR403.5.6.2 Water heating equipment.
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment
installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the
appropriate water heating category. Solar water heaters shall met the criteria of Section R403.5.6.2.1.
Solar systems for domestic hot water production are rated by the annual solarR403.5.6.2.1 Solar water heating system.
energy factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center
Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods
for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol.
Collectors in installed solar water-heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
The building shall be provided with ventilation that meets the requirements of the FloridaR403.6 Mechanical ventilation (Mandatory).
Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation, including:
Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the
ventilation system is not operating.
When installed to function as a whole-house mechanicalR403.6.1 Whole-house m echanical ventilation system fan efficacy.
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Where mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered byException:an electronically commutated motor.
Residential buildings designed to be operated at a positive indoor pressure of for mechanicalR403.6.2 Ventilation air.
ventilation shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed spaces(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum or R-19, space permitting, or R-10 otherwise.
R403.7 Heating and cooling equipm ent.
Heating and cooling equipment shall be sized in accordance with ACCA Manual S based onR403.7.1 Equipm ent sizing (Mandatory).
the equipment loads calculated in accordance with ACCA Manual J or other approved methodologies, heating and cooling calculation
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and
indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors that
affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
AIRFLOW RATE MAXIMUMMINIMUM EFFICACY (a)AIRFLOW RATE MINIMUMFAN LOCATION
CFMCFM/WATTCFM
Any1.2 cfm/wattAnyHRV or ERV
Any2.8 cfm/wattAnyRange hoods
Any3.8 cfm/wattAnyIn-line fan
<902.8 cfm/watt10Bathroom, utilityroom
Any3.5 cfm/watt90Bathroom, utilityroom
(a) When tested in accordance HVIStandard 916For SI: 1 cfm - 28.3 L/min.
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 10C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
MANDATORY REQUIREMENTS - (Continued)
Cooling only equipment shall be selected so that its total capacity is not lessR403.7.1.1 Cooling equipm ent capacity.
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
equipment shall not be less than the calculated latent load.
expanded performance data shall be used to select cooling-only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water-source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature
Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:1. Attached single- and multiple-family residential equipment sizing may be selected so that its cooling capacity is
less than the calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida-registered engineer, in attached single- and multiple-family units, the
capacity of equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipm ent capacity.
Heat pump sizing shall be based on the cooling requirements as calculated according to SectionR403.7.1.2.1 Heat pumps.
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
Electric resistance furnaces shall be sized within 4 kW of the designR403.7.1.2.2 Electric resistance furnaces.
requirements calculated according to the procedure selected in Section R403.7.1
The capacity of fossil fuel heating equipment with natural draft atmospheric burnersR403.7.1.2.3 Fossil fuel heating equipm ent.
shall not be less than the design load calculated in accordance with Section R403.7.1.
Residences requiring excess cooling or heating equipment capacity on anR403.7.1.3 Extra capacity required for special occasions.
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
Systems serving multiple dwelling units shall comply with SectionsR403.8 Systems serving multiple dwelling units (Mandatory).
Snow- and ice-melting systems, supplied through energy service to the building,R403.9 Snow melt and ice system controls (Mandatory).
shall include automatic controls capable of shutting off the systemw hen the pavement temperature is above 50°F (10°C), and no
precipitation is falling and an automatic or manual control that w ill allow shutoff when the outdoor temperature is above 40°F (4.8°C).
The energy consumption of pools and permanent spasR403.10 Pools and permanent spa energy consumption (Mandatory).
shall be in accordance with Sections R403.10.1 through R403.10.5.
The electric power to heaters shall be controlled by a readily accessible on-off switch that is anR403.10.1 Heaters.
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas-fired heaters shall not be equipped with continuously burning ignition pilots.
Time switches or other control methods that can automatically turn off and on according to a presetR403.10.2 Time switches.
schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in
compliance with this section.
Exceptions:1. Where public health standards require 24-hour pump operations.
2. Pumps that operate solar- and waste-heat-recovery pool heating systems.
3. Where pumps are powered exclusively from on-site renewable generation.
Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor- retardant coverR403.10.3 Covers.
on or at the water surface or a liquid cover or other means proven to reduce heat loss.
Where more than 70 percent of the energy for heating, computed over an operation season, is from site-recoveredException:energy, such as from a heat pump or solar energy source, covers or other vapor-retardant means shall not be required.
All gas- and oil-fired pool and spa heaters shall have a minimum thermalR403.10.4 Gas- and oil-fired pool and spa heaters.
efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously burning pilot lights.
Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordanceR403.10.5 Heat pump pool heaters.
with AHRI 1160, Table 2, Standard Rating Conditions-Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 11C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
MANDATORY REQUIREMENTS - (Continued)
The energy consumption of electric-powered portable spas shall be controlled by theR403.11 Portable spas (Mandatory).
requirements of APSP-14.
If installed, a dehumidifier shall conform to the following requirements:R403.13 Dehumidifiers (Mandatory).
1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house
is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to
75 pints/day.
2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air.
3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2.
4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential.
Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13,R403.13.1 Ducted dehum idifiers.
conform to the following requirements:
1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system, a backdraft
damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct.
2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system,
a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct.
3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the
central cooling evaporator coil.
4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6.
SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS
All permanently installed luminaires, excluding those in kitchen appliances, shall have anR404.1 Lighting equipment (Mandatory).
efficacy of at least 45 lumens-per-watt or shall utilize lamps with an efficacy of not less than 65 lumens-per-watt.
Low-voltage lighting.Exception:
Fuel gas lighting systems shall not have continuously burning pilot lights.R404.1.1 Lighting equipm ent (Mandatory).
FORM R405-2023
a. In addition, inspection of log w alls shall be in accordance with the provisions of ICC-400.
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 12C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Builder NameCustom 1 Story 2306 Right SEProject Name:Duval CountyPermit Office:893 Amberjack LaneStreet:Permit Number:Atlantic Beach, FL 32233City, State, Zip:261300Jurisdiction:Ow ner:FL, Jacksonville NASDesign Location:
INSULATION INSTALLATION CRITERIAAIR BARRIER CRITERIACOMPONENT
A continuous air barrier shall be installed in theGeneral
requirements Air-permeable insulation shall not be used as abuilding envelope. The exterior therm al envelope sealing material.contains a continuous barrier. Breaks or joints inthe air barrier shall be sealed.
The insulation in any dropped ceiling/soffitThe air barrier in any dropped ceiling/soffitCeiling/attic shall be aligned with the air barrier.shall be aligned with the insulation and any
gaps in the air barrier shall be sealed.Access openings, drop down stairs or knee w alldoors to unconditioned attics paces shall be sealed.
Cavities with corners and headers of fram e w allsThe junction of the foundation and sill plateWalls
shall be insulated by com pletely filling the cavityshall be sealed.The junction of the top plate with a material having a therm al resistance of R-3and the top of exterior w alls shall be sealed.per inch minimum.Knee w alls shall be sealed.
Exterior thermal envelope insulation for framedwalls shall be installed in substantial contact andcontinuous alignment w ith the air barrier
The space betw een window /door jam bs andWindow s, skylights framing, and skylights and framing shall be sealed.and doors
Rim joists shall be insulated.Rim joists are insulated and include an airbarrier.Rim joists
Floor framing cavity Insulation shall be installedThe air barrier shall be installed at any exposedFloors (including
to maintain perm anent contact w ith the undersideedge of insulation.above-garage and of subfloor decking, or floor fram ing cavitycantilevered floors)
insulation shall be perm itted to be in contactwith the top sideof sheathing, or continuousinsulation installed on the underside of floor
framing and extends from the bottom to the top ofall perimeter floor framing m embers.
Where provided in lieu of floor insulation,Exposed earth in unvented crawl spaces shall beCrawl space insulation shall be perm anently attachedcovered with a Class I vapor retarder with
walls
to the craw lspace w alls.overlapping joints taped.
Duct shafts, utility penetrations, and flue shaftShafts, penetrations
openings to exterior or unconditioned space shallbe sealed.
Batts in narrow cavities shall be cut to fit, orNarrow cavities
narrow cavities shall be filled by insulation thaton installation readily conforms to the availablecavity spaces.
Air sealing shall be provided betw een the garageGarageand conditioned spaces.separation
Recessed light fixtures installed in theRecessed light fixtures installed in the buildingRecessed building thermal envelope shall be air tightthermal envelope shall be sealed to the finished.
lighting
and IC rated.surface.
Batt insulation shall be cut neatly to fit aroundPlumbing and wiring and plum bing in exterior w alls, orwiringinsulation that on installation readily conforms
to available space shall extend behind pipingand wiring.
Exterior walls adjacent to showers and tubsThe air barrier shall be installed behindShower/tub on shall be insulated.electrical or com munication boxes or air-sealed
exterior wall
boxes shall be installed.
Boxes, housings, and enclosures shall be buriedBoxes, housings, and enclosures that penetrateElectrical,in or surrounded by tightly fitted insulation.the air barrier shall be caulked, taped, gasketed,communication, and
or otherwise sealed to the air barrier elem entother equipment being penetrated.boxes, housings,All concealed openings into the box, housing, orand enclosures
enclosure shall be sealed.The continuity of the air barrier shall be m aintainedaround boxes, housings, and enclosures that
penetrate the air barrier.Alternatively, air-sealed boxes shall be installed inaccordance with R402.4.6.
HVAC supply and return register boots thatHVAC register penetrate building therm al envelope shall be sealed
boots
to the subfloor, wall covering or ceiling penetrated
by the boot.
When required to be sealed, concealed fireConcealedsprinklers shall only be sealed in a m anner thatsprinklersis recomm ended by the manufacturer.
Caulking or other adhesive sealants shall not beused to fill voids between fire sprinkler coverplates and walls or ceilings.
FORM R405-2023
2024-Aug-15 08:58:21Section R405.4.1 Compliant Sof twareRight-Energy® Florida 2023Right-Suite® Universal 2024 24.0.01 RSU30476 Page 13C:\Users\RBrown\Downloads\893 Amberjack Lane.rup Calc = MJ8 Front Door faces: SE
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performanceor ERIMethodCompliance
2023 Florida Building Code, Energy Conservation, 8th Edition
Permit Number:261300Jurisdiction:
Job Information
Lot:Community:Builder:
Unit:893 Amberjack LaneAddress:
32233Zip:FLState:Atlantic BeachCity:
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method.
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceedingPRESCRIPTIVE METHOD 7 air changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2.
The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding the selected ACH(50) value, as shown on FORM R405-2023 (Performance) or
R406-2023 (ERI), section labeled as Infiltration, sub-section ACH50.
PERFORMANCE or ERI METHOD
7.000ACH(50) specified on Form R405-2023-Energy Calc (Performance) or R406-2023 (ERI):
Method for calculating building volume:21658_________ x60 ÷ _______________ =_________
ACH(50)Building VolumeCFM(50)Retrieved from architectural plansPASSCode software calculated
Field measured and calculatedWhen ACH(50) is less than 3,Mechanical Ventilation installation
mustbe verified bybuilding department.
The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven airR402.4.1.2 Testing.
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Dwelling units with an air
leakage rate less than three air changes per hour shall be provided with whole-house mechanical ventilation in accordance with
Section R403.6.1 of this code and M1507.3 of the Florida Building Code, Residential. Testing shall be conducted in accordance with
ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individual as
defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the
code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope ofException:
existing buildings in which the new construction is less than 85 percentof the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
7. If an attic is both air sealed and insulated at the roof deck, interior access doors and hatches between the conditioned
space volume and the attic shall be opened during the test and the volume of the attic shall be added to the conditioned
space volume for purposes of reporting an infiltration volume and calculating the air leakage of the home.
Testing Company
Company Name: ___________________________________ Phone: __________________
Iherebyverifythatthe above Air Leakage results are in accordance with the 2023 8th Edition Florida Building Code
EnergyConservation requirements according to the compliance method selected above.
Signature of Tester: ____________________________________ Dateof Test: _____________
PrintedName of Tester: __________________________________________________________
License/Certification #: __________________________ IssuingAuthority: _________________