1685 ATLANTIC BEACH DR RES25-0023 Truss Eng Roof - StrongJOB NAME:
SUBDIV:
STRONG RF WIND:155mph,H=35',Cat.II,Exp.B,Enclosed
20.0,10.0,0.0,10.0
TCLL-TCDL-BCLL-BCDL
LOADING:
DELIVERY ADDRESS:
1685 ATLANTIC BEACH
JACKSONVILLE, FL
This package includes individual, dated Truss Drawings designed using Mitek software. With my seal affixed
to this sheet, I herby certify that I am the Truss Design Engineer and this index sheet conforms to 61G15-31.003,
section 5 of the Florida Board of Professional Engineers Rules.
63
Note:The seal on this index sheet indicates acceptance of professional engineering responsibility solely for
the Truss Design Drawings listed below and attached. The Suitability and use of each component for any
particular building is the responsibility of the Building Designer, per ANSI/TPI 1.
Truss Design Engineer's Name License #:John Presley 55886
5631 S. NC 62 Burlington NC 27215 Tel: (336) 226-9356 Fax: (336) 476-9146
JOB #:72435534PER
BLUEWAVE BUILDERS INC
BUILDING CODE: FBC2023/FRC2023
No. Truss ID# Date
A1 1 11/12/24
A2 2 11/12/24
A3 3 11/12/24
A4 4 11/12/24
A5 5 11/12/24
B1 6 11/12/24
B2 7 11/12/24
B3 8 11/12/24
B4 9 11/12/24
B5 10 11/12/24
B6 11 11/12/24
B7 12 11/12/24
C1 13 11/12/24
C10 14 11/12/24
C11 15 11/12/24
C12 16 11/12/24
C2 17 11/12/24
C3 18 11/12/24
C4 19 11/12/24
C5 20 11/12/24
C6 21 11/12/24
C7 22 11/12/24
C8 23 11/12/24
C9 24 11/12/24
D1 25 11/12/24
D2 26 11/12/24
D3 27 11/12/24
E1 28 11/12/24
E2 29 11/12/24
E3 30 11/12/24
E4 31 11/12/24
E5 32 11/12/24
G1 33 11/12/24
G2 34 11/12/24
G3 35 11/12/24
G4 36 11/12/24
No. Truss ID# Date
G5 37 11/12/24
G6 38 11/12/24
G7 39 11/12/24
G8 40 11/12/24
J1 41 11/12/24
J10 42 11/12/24
J11 43 11/12/24
J12 44 11/12/24
J13 45 11/12/24
J14 46 11/12/24
J2 47 11/12/24
J4 48 11/12/24
J5 49 11/12/24
J6 50 11/12/24
J7 51 11/12/24
J8 52 11/12/24
J9 53 11/12/24
P2 54 11/12/24
V1 55 11/12/24
V2 56 11/12/24
V3 57 11/12/24
V4 58 11/12/24
V5 59 11/12/24
V6 60 11/12/24
V7 61 11/12/24
V8 62 11/12/24
V9 63 11/12/24
512
=3x6
=5x6
=5x4
=3x4
=5x10
=5x6
=3x4
=5x10
=3x6
=3x4
=5x4
=5x6
=3x6
9
29 30 1431 32 33 13 12 34 11 35 36 3710 38 39
1 8
72728221 22 3 23 24 4 25 26 5 6
T1
T3T2
T4
B2B1
W2W1 W2 W3 W1W2W2W3
1-6-0
30-2-0
3-10-0
3-10-0
4-4-0
14-4-0
4-4-0
18-8-0
3-10-0
28-8-0
6-2-0
24-10-0
6-2-0
10-0-0
3-5-8
16-0-12
5-2-8
21-3-4
5-2-8
12-7-4
7-4-12
28-8-0
7-4-12
7-4-122-6-70-6-32-1-6Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.84 Vert(LL) 0.05 10-11 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.40 Vert(CT) -0.09 10-20 >999 180
BCLL 0.0*Rep Stress Incr NO WB 0.37 Horz(CT) 0.01 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 149 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 5-2-1 oc purlins, except
2-0-0 oc purlins (4-1-9 max.): 2-7.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size)1=450/0-5-8, (min. 0-1-8), 8=777/0-5-8, (min. 0-1-8), 13=1932/0-5-8, (min.
0-2-4)
Max Horiz 1=-69 (LC 13)
Max Uplift 1=-199 (LC 8), 8=-362 (LC 5), 13=-922 (LC 4)
Max Grav 1=451 (LC 21), 8=778 (LC 22), 13=1932 (LC 1)
1 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-692/402, 2-21=-360/75, 21-22=-360/75, 3-22=-360/75, 3-23=-656/1404, 23-24=-656/1404, 4-24=-656/1404, 6-27=-1265/512, 27-28=-1265/512, 7-28=-1265/512, 7-8=-1232/657
BOT CHORD 1-29=-323/625, 29-30=-323/625, 14-30=-323/625, 12-13=-459/245, 12-34=-459/245, 11-34=-459/245, 11-35=-531/1080, 35-36=-531/1080, 36-37=-531/1080, 10-37=-531/1080,
10-38=-549/1118, 38-39=-549/1118, 8-39=-549/1118
WEBS 3-14=-84/715, 2-14=-340/368, 3-13=-1450/792, 4-13=-1341/712, 7-10=0/346, 6-10=0/408, 6-11=-1043/597, 4-11=-379/949
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 199 lb uplift at joint 1, 362 lb uplift at joint 8 and 922 lb
uplift at joint 13.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
8)Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 124 lb down and 181 lb up at 3-10-0, 48 lb down
and 78 lb up at 5-10-12, 48 lb down and 78 lb up at 7-10-12, 48 lb down and 78 lb up at 9-10-12, 48 lb down and 78 lb up at 11-10-12, 48 lb down
and 78 lb up at 13-10-12, 48 lb down and 78 lb up at 14-9-4, 48 lb down and 78 lb up at 16-9-4, 48 lb down and 78 lb up at 18-9-4, 48 lb down and
78 lb up at 20-9-4, and 48 lb down and 78 lb up at 22-9-4, and 124 lb down and 181 lb up at 24-10-0 on top chord, and 64 lb down at 3-10-0, 28 lb
down at 5-10-12, 28 lb down at 7-10-12, 28 lb down at 9-10-12, 28 lb down at 11-10-12, 28 lb down at 13-10-12, 28 lb down at 14-9-4, 28 lb down
at 16-9-4, 28 lb down at 18-9-4, 28 lb down at 20-9-4, and 28 lb down at 22-9-4, and 64 lb down at 24-9-4 on bottom chord. The design/selection of
such connection device(s) is the responsibility of others.
9)In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-2=-60, 2-7=-60, 7-9=-60, 15-18=-20
Concentrated Loads (lb)
Vert: 2=-77 (B), 7=-77 (B), 12=-20 (B), 3=-33 (B), 6=-33 (B), 21=-33 (B), 22=-33 (B), 23=-33 (B), 24=-33 (B), 25=-33 (B), 26=-33 (B),
27=-33 (B), 28=-33 (B), 29=-46 (B), 30=-20 (B), 31=-20 (B), 32=-20 (B), 33=-20 (B), 34=-20 (B), 35=-20 (B), 36=-20 (B), 37=-20 (B),
38=-20 (B), 39=-46 (B)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1A1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:10 Page: 1
ID:_5_YHe7igDNsoyC7s9HNRuybk1f-muHFZeGI7bkLH29qHXLqjA?MGsYUzeHfPjeYzwyJsFq
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6
=5x6
=3x4
=3x4
=3x4 =3x6
=3x4
=3x4
=3x6 =3x4
=3x4
=5x6
=3x6
9
14 13 12 11 10
1 8
2 3 21 4 5 22 6 7
T1
T2 T3
T4
B1 B2
W3 W2 W2 W1W1W3W2W2
HW1 HW2
1-6-0
30-2-0
3-5-11
22-10-0
3-5-11
9-3-11
5-0-5
14-4-0
5-0-5
19-4-5
5-10-0
5-10-0
5-10-0
28-8-0
0-1-7
12-7-4
3-6-15
16-2-3
5-11-12
28-8-0
5-11-12
5-11-12
6-6-1
22-8-4
6-6-1
12-5-133-4-70-6-32-11-6Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.42 Vert(LL) 0.05 14-17 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.40 Vert(CT) -0.09 10-11 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.30 Horz(CT) 0.01 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 131 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 5-9-13 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 2-7.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size)1=371/0-5-8, (min. 0-1-8), 8=642/0-5-8, (min. 0-1-8), 13=1370/0-5-8, (min.
0-1-10)
Max Horiz 1=-90 (LC 15)
Max Uplift 1=-172 (LC 10), 8=-267 (LC 11), 13=-554 (LC 6)
Max Grav 1=376 (LC 23), 8=642 (LC 1), 13=1370 (LC 1)
2 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-473/229, 2-3=-369/256, 3-21=-176/613, 4-21=-176/613, 6-7=-726/361, 7-8=-856/344
BOT CHORD 1-14=-186/375, 10-11=-242/620, 8-10=-200/723
WEBS 4-11=-139/524, 6-11=-525/256, 4-13=-920/442, 3-13=-809/379, 3-14=-103/434
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone2 3-0-0 to 10-0-15, Zone1 10-0-15 to 18-7-1, Zone2 18-7-1 to 27-2-0, Zone3 27-2-0 to 30-2-0
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 172 lb uplift at joint 1, 267 lb uplift at joint 8 and 554 lb
uplift at joint 13.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1A2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:10 Page: 1
ID:9D9ibPGc4bmIcfYE0y_yOCybk1U-E4rem_GwuvsBvCk1qFs3FOYeZGugi6apdNN5VNyJsFp
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6
=5x8
=2x3 =3x8 =2x3 =3x4
=3x4 =3x6 =2x3
=5x8
=3x6
7
12 11 10 9 8
1 6
24
19 2320
52222134
T1
T2
T3
B1 B2
W1 W2 W1 W4 W1W1W3
HW1 HW2
1-6-0
30-2-0
1-8-12
14-4-0
4-9-4
12-7-4
6-6-0
20-10-0
7-10-0
7-10-0
7-10-0
28-8-0
1-8-12
14-4-0
4-7-8
12-7-4
6-4-4
20-8-4
7-11-12
28-8-0
7-11-12
7-11-124-2-70-6-33-9-6Plate Offsets (X, Y):[1:Edge,0-0-7], [2:0-3-0,0-2-8], [5:0-3-0,0-2-8], [6:Edge,0-0-11]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.79 Vert(LL) 0.15 12-15 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.58 Vert(CT) -0.22 12-15 >695 180
BCLL 0.0*Rep Stress Incr YES WB 0.59 Horz(CT) 0.02 1 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 134 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-2-10 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 2-5.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)1=503/0-5-8, (min. 0-1-8), 6=736/0-5-8, (min. 0-1-8), 11=1145/0-5-8, (min.
0-1-8)
Max Horiz 1=-110 (LC 15)
Max Uplift 1=-239 (LC 10), 6=-326 (LC 11), 11=-439 (LC 6)
3 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-19=-642/300, 19-20=-564/302, 2-20=-554/318, 4-22=-338/298, 5-22=-338/298, 5-23=-873/407, 23-24=-887/391, 6-24=-965/381
BOT CHORD 1-12=-320/511, 11-12=-235/519, 10-11=-129/338, 9-10=-221/813, 8-9=-221/813, 6-8=-223/806
WEBS 2-12=0/311, 2-11=-655/215, 4-10=-24/388, 5-10=-591/158, 5-8=0/320, 4-11=-735/301
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 3-7-1, Zone2 3-7-1 to 12-0-15, Zone1 12-0-15 to 16-7-1, Zone2 16-7-1 to 25-0-15,
Zone1 25-0-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 239 lb uplift at joint 1, 439 lb uplift at joint 11 and 326 lb
uplift at joint 6.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1A3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:11 Page: 1
ID:5touauVWbR9bOaVudSpQfDybk1B-iHP0_KHYfD_2WMJDOyNIob4jYgB8RUQys17f1pyJsFo
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6 =2x3
=3x4
=5x6
=3x4 =3x6
=3x4
=3x4
=5x6
=3x4 =2x3
=3x6
8
13 12 11 10 9
1 7
23
20
222162
534
T1
T2
T3
B1 B2
W4W3W2
W1 W1
W2W3W4
1-6-0
30-2-0
3-10-9
9-10-0
3-10-9
22-8-9
4-6-0
14-4-0
4-6-0
18-10-0
5-11-7
5-11-7
5-11-7
28-8-0
3-5-8
16-0-12
5-7-14
21-8-10
5-7-14
12-7-4
6-11-6
28-8-0
6-11-6
6-11-65-0-70-6-34-7-6Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.36 Vert(LL) 0.05 13-16 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.42 Vert(CT) -0.11 13-16 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.37 Horz(CT) 0.01 1 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 140 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 3-5.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size)1=357/0-5-8, (min. 0-1-8), 7=621/0-5-8, (min. 0-1-8), 12=1405/0-5-8, (min.
0-1-11)
Max Horiz 1=-130 (LC 15)
Max Uplift 1=-176 (LC 10), 7=-294 (LC 11), 12=-471 (LC 6)
Max Grav 1=392 (LC 23), 7=639 (LC 24), 12=1405 (LC 1)
4 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-20=-504/227, 20-21=-440/237, 2-21=-373/238, 2-3=-380/259, 3-4=-53/431, 5-6=-720/384, 6-22=-714/363, 22-23=-780/361, 7-23=-845/343
BOT CHORD 1-13=-226/411, 9-10=-24/341, 7-9=-223/720
WEBS 4-12=-830/375, 3-12=-655/290, 3-13=-258/537, 2-13=-316/286, 6-9=-293/275, 5-9=-236/494, 5-10=-445/198, 4-10=-136/491
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 5-7-1, Zone2 5-7-1 to 23-0-15, Zone1 23-0-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 176 lb uplift at joint 1, 294 lb uplift at joint 7 and 471 lb
uplift at joint 12.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1A4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:11 Page: 1
ID:w1A9ryZHBHvl6Vy2ziwqvUybk15-iHP0_KHYfD_2WMJDOyNIob4qFgEgRYrys17f1pyJsFo
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6 =2x3
=3x4
=5x8
=3x4 =3x6 =5x8
=5x6
=3x4
=2x3 =3x6
7
12 11 10 9 8
1 6
22
19
2 52120
43
T1
T2
T3
B1 B2
W1 W2 W1
W3 W3
W2
W4
HW1 HW2
1-6-0
30-2-0
5-0-0
16-10-0
4-8-8
21-6-8
4-8-9
11-10-0
7-1-7
7-1-7
7-1-8
28-8-0
3-5-8
16-0-12
5-5-12
21-6-8
5-5-13
12-7-4
7-1-7
7-1-7
7-1-8
28-8-05-10-70-6-35-5-6Plate Offsets (X, Y):[1:Edge,0-0-7], [3:0-5-4,Edge], [6:Edge,0-0-11]
Loading (psf)Spacing 3-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.87 Vert(LL) 0.13 12-15 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.74 Vert(CT) -0.20 12-15 >767 180
BCLL 0.0*Rep Stress Incr NO WB 0.76 Horz(CT) 0.02 1 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 143 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD 2-0-0 oc purlins (3-10-9 max.)
(Switched from sheeted: Spacing > 2-0-0).
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size)1=629/0-5-8, (min. 0-1-8), 6=1003/0-5-8, (min. 0-1-8), 11=1944/0-5-8,
(min. 0-2-5)
Max Horiz 1=-226 (LC 15)
Max Uplift 1=-309 (LC 10), 6=-493 (LC 11), 11=-528 (LC 6)
Max Grav 1=671 (LC 23), 6=1019 (LC 24), 11=1944 (LC 1)
5 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-19=-876/387, 2-19=-766/411, 3-20=0/330, 3-4=-305/353, 4-21=-435/340, 5-21=-451/313, 5-22=-1226/619, 6-22=-1343/583
BOT CHORD 1-12=-409/707, 11-12=-395/707, 10-11=-446/338, 9-10=-446/338, 8-9=-380/1132, 6-8=-380/1132
WEBS 2-12=0/428, 2-11=-992/583, 5-8=0/418, 3-11=-1344/533, 4-9=-273/166, 5-9=-937/552, 3-9=-380/1091
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 7-7-1, Zone2 7-7-1 to 21-0-15, Zone1 21-0-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 309 lb uplift at joint 1, 528 lb uplift at joint 11 and 493 lb
uplift at joint 6.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1A5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:12 Page: 1
ID:2XS4ZOjR7HYvAUSXExftwDybk0u-ATzOBgIBQW6v8WuPyguXLpdt04VqAv?65hsCaFyJsFn
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=7x8 =3x6
=3x4
=3x6
=5x12 =5x4
=7x8
=3x6
=7x8 =2x3
=5x8
=5x8
=5x5 =5x5 =5x5 =3x4
=7x8
=7x8
=M18AHS 7x10
=5x8
=5x8
=5x6
=5x8
=5x6
=2x3
=5x5
LUS26LUS26LUS26LUS26
HGUS28-3
1
24 33 34 3523 36 22 3738 21 20
2
3 4
155
1918 17 16
1462526
7 13811 12
9 10
T3
T1
T2
T4
T5
T6
B1 B2
B4 B5 B6
B3
W5
W7
W11
W10
W9
W2W1
W3 W4
W8W6 W13W14
W15
W12
HW1
6-3-06-10-41-1-4
28-0-0
1-6-0
44-10-0
1-6-0
-1-6-0
2-0-0
34-4-8
2-0-5
22-4-9
2-10-9
37-3-1
4-4-8
32-4-8
4-6-3
26-10-12
6-0-15
43-4-0
6-3-9
6-3-9
6-9-11
20-4-4
7-3-0
13-6-9
1-1-4
28-1-12
2-4-3
13-11-12
5-1-0
5-1-0
6-1-0
34-2-12
6-4-8
20-4-4
6-6-9
11-7-9
0-3-8
27-0-8
9-1-4
43-4-0
6-4-12
26-9-012-7-50-10-120-6-36-5-1410-8-1410-8-141-9-1412-6-120-7-40-7-45-10-106-5-14Plate Offsets (X, Y):[19:0-4-8,Edge], [21:0-2-8,0-4-12], [26:0-4-0,0-3-1]
Loading (psf)Spacing 3-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.69 Vert(LL) -0.32 21-23 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.80 Vert(CT) -0.59 21-23 >550 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr NO WB 0.85 Horz(CT) 0.08 19 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic 0.12 20-21 >668 360 Weight: 1025 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T3:2x4 SP SS
BOT CHORD 2x8 SP No.1 *Except* B4:2x4 SP No.2, B5,B6:2x6 SP No.2, B3:2x8 SP No.2
WEBS 2x4 SP No.3 *Except* W5,W11,W9,W6:2x4 SP No.2
WEDGE Left: 2x4 SP No.2
BRACING
TOP CHORD 2-0-0 oc purlins (6-0-0 max.)
(Switched from sheeted: Spacing > 2-0-0).
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
JOINTS 1 Brace at Jt(s): 10, 11, 12, 25
This truss requires both edges of the bottom chord be sheathed in the room
area.REACTIONS (lb/size)2=3587/0-5-8, (min. 0-1-8), 14=-941/0-5-8, (min. 0-1-8), 19=9040/0-5-8,
(min. 0-4-10)
Max Horiz 2=742 (LC 8)
Max Uplift 2=-1602 (LC 8), 14=-1893 (LC 19), 19=-2294 (LC 8)
Max Grav 2=3591 (LC 23), 14=431 (LC 8), 19=11799 (LC 2)
6 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-6525/2930, 3-4=-5862/2371, 4-5=-5724/2404, 5-6=-308/304, 6-7=-139/339, 7-8=-374/448, 8-9=-3071/13127, 9-10=-2796/12505, 10-11=-1711/7771, 11-12=-1184/5288,
12-13=-1290/5627, 13-14=-1216/5415
BOT CHORD 2-24=-3265/5929, 24-33=-3196/5888, 33-34=-3196/5888, 34-35=-3196/5888, 23-35=-3196/5888, 23-36=-1879/3801, 22-36=-1879/3801, 22-37=-1879/3801, 37-38=-1879/3801,
21-38=-1879/3801, 19-20=0/1497, 19-26=-10038/2422, 9-26=-1089/505, 18-19=-592/152, 17-18=-6647/1689, 16-17=-6647/1689, 14-16=-4859/1192
WEBS 21-25=-1147/6263, 7-25=-290/489, 25-26=-6892/1622, 10-18=-2166/8910, 18-26=-11189/2886, 10-26=-16767/3953, 3-23=-699/764, 3-24=-245/269, 5-23=-2175/5081,
5-21=-5002/2508, 8-26=-5431/1452, 8-25=-2294/9810, 11-16=-701/3487, 12-16=-2102/521, 13-16=-565/431, 11-18=-902/624
NOTES
1)3-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc.
Bottom chords connected as follows: 2x8 - 2 rows staggered at 0-4-0 oc, 2x4 - 1 row at 0-9-0 oc, 2x6 - 2 rows staggered at 0-9-0 oc.
Web connected as follows: 2x4 - 1 row at 0-9-0 oc.
2)All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections
have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3)Unbalanced roof live loads have been considered for this design.
4)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)Provide adequate drainage to prevent water ponding.
6)All plates are MT20 plates unless otherwise indicated.
7)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
9)Ceiling dead load (5.0 psf) on member(s). 25-26
10)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 20-21
11)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1602 lb uplift at joint 2, 2294 lb uplift at joint 19 and 1893 lb
uplift at joint 14.
12)Load case(s) 1, 2 has/have been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
13)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
14)This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the
bearings. Building designer must provide for uplift reactions indicated.
15)Use Simpson Strong-Tie LUS26 (4-SD9112 Girder, 4-SD9212 Truss, Single Ply Girder) or equivalent at 6-11-12 from the left end to connect truss(es) to
back face of bottom chord.
16)Use Simpson Strong-Tie LUS26 (4-10d Girder, 3-10d Truss, Single Ply Girder) or equivalent spaced at 2-0-0 oc max. starting at 8-11-12 from the left
end to 12-11-12 to connect truss(es) to back face of bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 3B1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:12 Page: 1
ID:NVPOMpR7IOI8bcZI6OUZL8ybjlB-ATzOBgIBQW6v8WuPyguXLpdwv4UxAtc65hsCaFyJsFn
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
Continued on page 2
17)Use Simpson Strong-Tie HGUS28-3 (36-16d Girder, 12-16d Truss) or equivalent at 14-10-4 from the left end to connect truss(es) to back face of
bottom chord.
18)Fill all nail holes where hanger is in contact with lumber.
19)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-10=-90, 10-11=-90, 11-12=-90, 12-15=-90, 27-37=-30, 20-37=-120 (F=-90), 19-30=-30, 25-26=-15
Concentrated Loads (lb)
Vert: 33=-1244 (B), 34=-546 (B), 35=-546 (B), 36=-546 (B), 37=-2162 (B)
2) Dead + 0.75 Roof Live (balanced) + 0.75 Uninhab. Attic Storage + 0.75 Attic Floor: Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-10=-75, 10-11=-75, 11-12=-75, 12-15=-75, 27-36=-53, 36-37=-75, 37-38=-338 (F=-263), 21-38=-315 (F=-263), 20-21=-383
(F=-263), 19-30=-53, 25-26=-15
Concentrated Loads (lb)
Vert: 33=-1085 (B), 34=-474 (B), 35=-474 (B), 36=-474 (B), 37=-1888 (B)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 3B1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:12 Page: 2
ID:NVPOMpR7IOI8bcZI6OUZL8ybjlB-ATzOBgIBQW6v8WuPyguXLpdwv4UxAtc65hsCaFyJsFn
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x6
=3x4
=5x6
=5x5
=5x6
=5x8 =5x8 =2x3
=5x4
=5x6
=5x5 =5x5
=5x5 =2x5
=7x8
=5x4
=M18AHS 5x10
=5x8
=5x8
=5x6
=5x5
=5x6
=5x5
1
21 34 20
19 18
2 3 31
4
135
1716 15 14
12
33
22 23
6 32 11107
8 9
T3
T1
T2
T4
T5
T6
B1 B2
B4 B5 B6
B3
W1
W2 W3
W4
W13
W10
W6 W9
W8
W7W5 W11 W12
HW1
6-3-06-10-41-1-4
28-0-0
1-6-0
44-10-0
1-6-0
-1-6-0
2-0-0
36-1-8
2-0-5
22-4-9
4-6-3
26-10-12
6-1-8
34-1-8
6-5-5
13-4-6
6-11-14
20-4-4
6-11-1
6-11-1
7-2-8
43-4-0
1-1-4
28-1-12
4-4-8
20-4-4
6-7-0
15-11-12
7-4-4
43-4-0
7-10-0
35-11-12
0-3-8
27-0-8
9-4-12
9-4-12
6-4-12
26-9-012-7-50-10-120-6-36-5-1410-0-210-0-22-6-1012-6-120-5-80-5-86-0-66-5-14Plate Offsets (X, Y):[4:0-3-0,0-3-0], [5:0-3-0,0-3-0], [19:0-1-12,0-2-8], [23:0-4-0,0-2-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.92 Vert(LL) -0.26 19-21 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.77 Vert(CT) -0.45 19-21 >718 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr YES WB 0.82 Horz(CT) 0.06 17 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic 0.08 18-19 >988 360 Weight: 312 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2 *Except* B4:2x4 SP No.3, B3:2x8 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x4 SP No.3 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 10-11.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-19, 22-23, 9-23
This truss requires both edges of the bottom chord be sheathed in the room
area.REACTIONS (lb/size)2=901/0-5-8, (min. 0-1-8), 12=301/0-5-8, (min. 0-1-8), 17=2510/0-5-8,
(min. 0-3-10)
Max Horiz 2=494 (LC 10)
Max Uplift 2=-328 (LC 10), 12=-324 (LC 11), 17=-995 (LC 10)
Max Grav 2=951 (LC 26), 12=511 (LC 25), 17=3087 (LC 2)
8 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-494/0, 3-31=-1370/476, 4-31=-1319/496, 4-5=-1203/460, 6-32=-113/306, 7-32=-99/314, 7-8=-998/2726, 8-9=-876/2586, 9-10=-550/1562, 10-11=-366/610, 11-33=-401/670,
12-33=-483/636
BOT CHORD 2-21=-736/1217, 21-34=-423/661, 20-34=-423/661, 19-20=-423/661, 17-18=0/278, 17-23=-2804/911, 8-23=-343/243, 15-16=-1031/507, 14-15=-1031/507, 12-14=-594/384
WEBS 4-21=-324/327, 5-21=-215/734, 5-19=-854/550, 19-22=-225/1057, 6-22=-309/302, 11-14=-339/219, 9-16=-698/2035, 22-23=-1338/508, 16-23=-2139/997, 9-23=-3818/1323,
7-23=-1223/556, 7-22=-746/1962, 10-16=-776/579, 10-14=-221/836
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 2-10-0, Zone1 2-10-0 to 21-10-7, Zone2 21-10-7 to 28-0-0, Zone3 28-0-0 to 34-1-8, Zone2 34-1-8 to 40-6-0,
Zone3 40-6-0 to 44-10-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Ceiling dead load (5.0 psf) on member(s). 22-23
8)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 18-19
9)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 328 lb uplift at joint 2, 995 lb uplift at joint 17 and 324 lb
uplift at joint 12.
10)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
11)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1B2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:13 Page: 1
ID:cV_DpilRANZSjcZHdryfPdybjkn-efWmO0JpBqEmmgTbWNQmt0915UqcvLJFJLcl6iyJsFm
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=5x4
=5x6
=5x5
=5x6
=5x8 =5x8 =2x3
=5x4
=5x6
=5x5 =5x5
=5x5 =2x5
=7x8
=5x4
=M18AHS 5x10
=5x8
=3x4
=5x8
=5x6
=5x8
=5x6
=5x5
1
22 35 21 20 19
2 3 32
4
145
1817 16 15
13
34
23 24
1211633107
8 9
T3
T1
T2
T4
T5
T6
B1 B2
B4 B5 B6
B3
W1
W2 W3
W4
W13W14W6
W10
W9
W8
W7W5 W11 W12
HW1
6-3-06-10-41-6-0
44-10-0
1-6-0
-1-6-0
2-0-5
22-4-9
2-2-3
36-1-8
5-2-8
43-4-0
6-5-5
13-4-6
6-11-1
6-11-1
6-11-14
20-4-4
2-0-0
38-1-8
1-1-4
28-0-0
4-6-3
26-10-12
5-11-5
33-11-5
4-4-8
20-4-4
0-11-8
28-0-0
6-7-0
15-11-12
0-1-12
36-3-4
0-1-12
28-1-12
7-0-12
43-4-0
0-3-8
27-0-8
9-4-12
9-4-12
6-4-12
26-9-0
7-11-12
36-1-812-7-50-10-120-6-36-5-149-2-29-2-23-4-1012-6-120-5-80-5-86-0-66-5-14Plate Offsets (X, Y):[2:0-5-7,0-0-6], [4:0-3-0,0-3-0], [5:0-3-0,0-3-0], [20:0-1-12,0-2-8], [24:0-4-0,0-2-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.91 Vert(LL) -0.26 20-22 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.78 Vert(CT) -0.45 20-22 >721 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr YES WB 0.83 Horz(CT) 0.06 18 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic -0.08 19-20 >977 360 Weight: 317 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2 *Except* B4:2x4 SP No.3, B3:2x8 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 11-12.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-20, 23-24, 9-24
This truss requires both edges of the bottom chord be sheathed in the room
area.REACTIONS (lb/size)2=901/0-5-8, (min. 0-1-8), 13=300/0-5-8, (min. 0-1-8), 18=2511/0-5-8,
(min. 0-3-10)
Max Horiz 2=494 (LC 10)
Max Uplift 2=-328 (LC 10), 13=-323 (LC 11), 18=-995 (LC 10)
Max Grav 2=951 (LC 26), 13=509 (LC 25), 18=3088 (LC 2)
9 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-641/0, 3-32=-1372/438, 4-32=-1319/458, 4-5=-1205/424, 6-33=-112/278, 7-33=-98/284, 7-8=-996/2727, 8-9=-869/2577, 9-10=-546/1551, 10-11=-475/897, 11-12=-437/791,
12-34=-503/604, 13-34=-560/583
BOT CHORD 2-22=-734/1218, 22-35=-424/663, 21-35=-424/663, 20-21=-424/663, 18-19=-1/278, 18-24=-2837/913, 8-24=-352/254, 16-17=-1057/502, 15-16=-1057/502, 13-15=-537/464
WEBS 4-22=-320/321, 5-22=-215/735, 5-20=-855/551, 20-23=-225/1057, 6-23=-309/302, 11-15=-180/337, 12-15=-405/259, 23-24=-1339/507, 9-17=-710/2079, 17-24=-2130/998,
9-24=-3822/1313, 7-24=-1221/555, 7-23=-745/1963, 10-17=-754/492, 10-15=-152/604
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 2-10-0, Zone1 2-10-0 to 21-10-7, Zone2 21-10-7 to 33-11-5, Zone1 33-11-5 to 36-1-8, Zone2 36-1-8 to
40-6-0, Zone3 40-6-0 to 44-10-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Ceiling dead load (5.0 psf) on member(s). 23-24
8)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 19-20
9)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 328 lb uplift at joint 2, 995 lb uplift at joint 18 and 323 lb
uplift at joint 13.
10)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
11)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1B3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:14 Page: 1
ID:k?G8Y8vb7NCcnc2nu4hiQNybjka-6s48cMJRx8MdNp2o34x?QEiCwt9geoMOY?LJe8yJsFl
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=5x4
=5x6
=5x5
=5x6
=5x8 =5x8 =2x3
=5x4
=5x6
=5x5 =5x5
=5x5 =2x5
=7x8
=5x8
=M18AHS 5x10
=8x8
=5x8
=3x6
=5x6
=5x8
=5x6
=5x5
1
22 36 21 20 19
2 3 32
4
145
1817 16 15
13
35
23
11 12
24
6 1034337
8 9
T3
T1
T2
T4
T5
T6
B1 B2
B4 B5 B6
B3
W1
W2 W3
W4
W13W14W6
W10
W9
W8
W7W5
W11 W12
HW1
6-3-06-10-41-1-4
28-0-0
1-6-0
44-10-0
1-6-0
-1-6-0
2-0-0
40-1-8
2-0-5
22-4-9
3-1-5
38-1-8
3-2-8
43-4-0
4-6-3
26-10-12
6-5-5
13-4-6
6-11-14
20-4-4
6-11-1
6-11-1
7-0-3
35-0-3
1-1-4
28-1-12
4-4-8
20-4-4
5-0-12
43-4-0
6-7-0
15-11-12
0-3-8
27-0-8
9-4-12
9-4-12
6-4-12
26-9-0
10-1-8
38-3-412-7-50-10-120-6-36-5-148-4-28-4-24-2-1012-6-120-5-80-5-86-0-66-5-14Plate Offsets (X, Y):[2:0-5-7,0-0-6], [4:0-3-0,0-3-0], [5:0-3-0,0-3-0], [18:0-4-8,0-2-8], [20:0-1-12,0-2-8], [24:0-4-0,0-2-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.93 Vert(LL) -0.26 20-22 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.83 Vert(CT) -0.45 20-22 >718 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr YES WB 0.88 Horz(CT) 0.06 18 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic 0.08 19-20 >957 360 Weight: 317 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2 *Except* B4:2x4 SP No.3, B3:2x8 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 11-12.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-20, 23-24, 9-24
This truss requires both edges of the bottom chord be sheathed in the room
area.REACTIONS (lb/size)2=900/0-5-8, (min. 0-1-8), 13=299/0-5-8, (min. 0-1-8), 18=2513/0-5-8,
(min. 0-3-10)
Max Horiz 2=494 (LC 10)
Max Uplift 2=-328 (LC 10), 13=-322 (LC 11), 18=-994 (LC 10)
Max Grav 2=951 (LC 26), 13=508 (LC 25), 18=3089 (LC 2)
10 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-641/0, 3-32=-1372/424, 4-32=-1320/445, 4-5=-1205/410, 6-33=-110/275, 7-33=-96/281, 7-8=-995/2730, 8-9=-876/2589, 9-34=-541/1525, 10-34=-556/1477, 10-11=-835/731,
11-12=-737/630, 12-35=-636/460, 13-35=-688/455
BOT CHORD 2-22=-734/1218, 22-36=-425/663, 21-36=-425/663, 20-21=-425/663, 18-19=-1/278, 18-24=-2984/894, 8-24=-340/235, 16-17=-1022/464, 15-16=-1022/464, 13-15=-373/601
WEBS 4-22=-321/321, 5-22=-215/736, 5-20=-856/552, 20-23=-224/1058, 6-23=-309/301, 11-15=-362/259, 12-15=-329/273, 23-24=-1341/505, 9-17=-679/2158, 17-24=-2068/1000,
9-24=-3949/1315, 7-24=-1222/556, 7-23=-743/1964, 10-17=-830/576, 10-15=-163/759
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 2-10-0, Zone1 2-10-0 to 21-10-7, Zone2 21-10-7 to 34-1-9, Zone1 34-1-9 to 38-1-8, Zone2 38-1-8 to 40-6-0,
Zone3 40-6-0 to 44-10-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Ceiling dead load (5.0 psf) on member(s). 23-24
8)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 19-20
9)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 328 lb uplift at joint 2, 994 lb uplift at joint 18 and 322 lb
uplift at joint 13.
10)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
11)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1B4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:15 Page: 1
ID:zkJYRD0E?8LKM_EWwTLpIGybjkR-6s48cMJRx8MdNp2o34x?QEiCct8renZOY?LJe8yJsFl
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=5x4
=5x6
=5x5
=5x6
=5x8 =5x8 =2x3
=5x4
=5x6
=5x5 =5x5
=5x5 =2x5
=7x8
=5x6
=M18AHS 5x10
=8x8
=5x8
=3x6
=5x5
=7x8
=7x8
=5x5
1
24 37 23 22 21
2 3 34
4
145
2019 18 17 16 15
1311 122526
6 1036357
8 9
T3
T1
T2
T4
T5 T6
B1 B2
B4 B5 B6
B3
W1
W2 W3
W4
W14 W14
W6
W10
W9
W8
W5 W7
W11 W12
W13
HW1 6-10-46-3-0
1-1-4
28-0-0
1-6-0
44-10-0
1-6-0
-1-6-0
1-2-8
43-4-0
2-0-0
42-1-8
2-0-5
22-4-9
4-6-3
26-10-12
5-1-5
40-1-8
6-5-5
13-4-6
6-11-14
20-4-4
6-11-1
6-11-1
7-0-3
35-0-3
1-1-4
28-1-12
1-4-4
43-4-0
1-8-8
41-11-12
2-1-12
40-3-4
4-4-8
20-4-4
6-7-0
15-11-12
0-3-8
27-0-8
9-4-12
9-4-12
6-4-12
26-9-0
9-11-12
38-1-812-7-50-10-120-6-36-5-147-6-27-6-25-0-1012-6-120-5-80-5-86-0-66-5-14Plate Offsets (X, Y):[2:0-5-7,0-0-6], [4:0-3-0,0-3-0], [5:0-3-0,0-3-0], [11:0-3-12,0-3-0], [12:0-4-0,0-2-2], [22:0-1-12,0-2-8], [26:0-4-0,0-2-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.93 Vert(LL) -0.28 22-24 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.82 Vert(CT) -0.46 22-24 >698 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr YES WB 0.91 Horz(CT) 0.07 20 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic -0.09 21-22 >893 360 Weight: 316 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2 *Except* B4:2x4 SP No.3, B3:2x8 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 11-12.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except:
8-6-4 oc bracing: 2-24
10-0-0 oc bracing: 22-24.
WEBS 1 Row at midpt 5-22, 25-26, 9-26
This truss requires both edges of the bottom chord be sheathed in the room
area.
REACTIONS (lb/size)2=900/0-5-8, (min. 0-1-8), 13=299/0-5-8, (min. 0-1-8), 20=2513/0-5-8,
(min. 0-3-10)
Max Horiz 2=494 (LC 10)
Max Uplift 2=-329 (LC 10), 13=-319 (LC 11), 20=-991 (LC 10)
Max Grav 2=953 (LC 26), 13=504 (LC 25), 20=3088 (LC 2)
11 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-642/0, 3-34=-1377/404, 4-34=-1325/425, 4-5=-1211/389, 6-35=-110/270, 7-35=-96/277, 7-8=-989/2727, 8-9=-869/2587, 9-36=-534/1519, 10-36=-549/1470, 10-11=-795/763,
11-12=-850/628, 12-13=-878/638
BOT CHORD 2-24=-736/1223, 24-37=-427/667, 23-37=-427/667, 22-23=-427/667, 20-21=-3/279, 20-26=-2958/902, 8-26=-340/237, 18-19=-1004/462, 17-18=-1004/462, 16-17=-652/937,
15-16=-604/850, 13-15=-539/778
WEBS 4-24=-321/321, 5-24=-216/737, 5-22=-858/553, 22-25=-223/1057, 6-25=-310/301, 11-16=-396/265, 12-15=-296/324, 25-26=-1339/501, 9-19=-688/2141, 19-26=-2068/993,
9-26=-3928/1317, 7-25=-740/1962, 7-26=-1222/556, 10-19=-858/586, 10-17=-104/686
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 2-10-0, Zone1 2-10-0 to 21-10-7, Zone2 21-10-7 to 34-1-9, Zone1 34-1-9 to 40-1-8, Zone2 40-1-8 to 42-1-8,
Zone3 42-1-8 to 44-10-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Ceiling dead load (5.0 psf) on member(s). 25-26
8)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 21-22
9)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 329 lb uplift at joint 2, 991 lb uplift at joint 20 and 319 lb
uplift at joint 13.
10)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
11)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1B5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:15 Page: 1
ID:Jh6RUw4NqgzdSl7Uj0x_?KybjkM-b2eXphK3iRUU?zd_doSEyRFNPHVENDLYnf5sAayJsFk
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=5x4
=5x6
=5x5
=5x6
=5x8 =5x8 =2x3
=5x4
=5x6
=5x5 =5x5
=5x5 =2x5
=7x8
=5x6
=M18AHS 5x10
=5x8
=3x4
=2x3 =3x5
1
18 32 17 16 15
2 3 28
4
5
1413 12
111920
3161030297
8 9
T3
T1
T2
T4
B1 B2
B4
B5
B3
W1
W2 W3
W4
W6
W10
W9
W8
W7W5
W11 W12
HW2
HW1
6-3-06-10-41-1-4
28-0-0
1-6-0
-1-6-0
2-0-5
22-4-9
4-6-3
26-10-12
6-5-5
13-4-6
6-5-15
41-4-0
6-10-1
34-10-1
6-11-14
20-4-4
6-11-1
6-11-1
1-1-4
28-1-12
4-4-8
20-4-4
6-5-15
41-4-0
6-7-0
15-11-12
6-8-5
34-10-1
0-3-8
27-0-8
9-4-12
9-4-12
6-4-12
26-9-012-7-50-10-120-6-36-5-1412-6-120-5-80-5-86-0-66-5-14Plate Offsets (X, Y):[2:0-5-7,0-0-6], [4:0-3-0,0-3-0], [5:0-3-0,0-3-0], [11:Edge,0-0-11], [16:0-1-12,0-2-8], [20:0-4-0,0-2-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.91 Vert(LL) -0.27 16-18 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.79 Vert(CT) -0.47 16-18 >680 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr YES WB 0.92 Horz(CT) 0.07 14 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic -0.09 15-16 >910 360 Weight: 289 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2 *Except* B4:2x4 SP No.3, B5:2x4 SP No.2, B3:2x8 SP No.2
WEBS 2x4 SP No.3
WEDGE Right: 2x4 SP No.2
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-16, 19-20, 9-20
This truss requires both edges of the bottom chord be sheathed in the room
area.
REACTIONS (lb/size)2=904/0-5-8, (min. 0-1-8), 11=70/0-5-8, (min. 0-1-8), 14=2488/0-5-8, (min.
0-3-10)
Max Horiz 2=509 (LC 10)
Max Uplift 2=-323 (LC 10), 11=-232 (LC 26), 14=-1021 (LC 10)
Max Grav 2=954 (LC 26), 11=307 (LC 25), 14=3073 (LC 2)
12 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-642/0, 3-28=-1380/387, 4-28=-1327/408, 4-5=-1213/373, 7-29=-118/256, 7-8=-1001/2695, 8-9=-876/2548, 9-30=-518/1495, 10-30=-533/1453, 10-31=-395/899, 11-31=-415/859
BOT CHORD 2-18=-738/1225, 18-32=-427/669, 17-32=-427/669, 16-17=-427/669, 14-15=-3/283, 14-20=-2864/978, 8-20=-354/251, 12-13=-793/411, 11-12=-793/411
WEBS 4-18=-319/321, 5-18=-218/738, 5-16=-859/554, 16-19=-223/1051, 6-19=-307/301, 19-20=-1319/499, 9-13=-784/2172, 13-20=-2150/993, 9-20=-3900/1393, 7-20=-1216/553,
7-19=-739/1946, 10-13=-911/505, 10-12=0/324
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 2-10-0, Zone1 2-10-0 to 21-10-7, Zone2 21-10-7 to 34-1-9, Zone1 34-1-9 to 37-0-0, Zone3 37-0-0 to 41-4-0
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
3)All plates are MT20 plates unless otherwise indicated.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Ceiling dead load (5.0 psf) on member(s). 19-20
7)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 15-16
8)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 232 lb uplift at joint 11, 323 lb uplift at joint 2 and 1021 lb
uplift at joint 14.
9)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1B6Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:15 Page: 1
ID:1zMLQPEzSsx8MMtknT8GLMybjit-b2eXphK3iRUU?zd_doSEyRFNmHVrND9Ynf5sAayJsFk
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=5x4
=5x6
=5x5
=5x6
=5x8 =5x8 =2x3
=5x4
=5x6
=5x5 =5x5
=5x5 =2x5
=7x8
=5x6
=M18AHS 5x10
=5x8
=3x6
=3x4
=2x3 =3x5
1
20 33 19 18
17
2 3 30
4
135
1615 14
12
32
21 22
6 1131710
8 9
T3
T1
T2
T4
T5
B1 B2
B4
B5
B3
W1
W2 W3
W4
W12W6
W10
W5
W9
W8
W7
W11
HW2
HW1
6-3-06-10-41-1-4
28-0-0
1-6-0
42-10-0
1-6-0
-1-6-0
2-0-5
22-4-9
4-6-3
26-10-12
6-5-5
13-4-6
6-5-15
41-4-0
6-10-1
34-10-1
6-11-14
20-4-4
6-11-1
6-11-1
1-1-4
28-1-12
4-4-8
20-4-4
6-5-15
41-4-0
6-7-0
15-11-12
6-8-5
34-10-1
0-3-8
27-0-8
9-4-12
9-4-12
6-4-12
26-9-012-7-50-10-120-6-36-5-1412-6-120-5-80-5-86-0-66-5-14Plate Offsets (X, Y):[2:0-5-7,0-0-6], [4:0-3-0,0-3-0], [5:0-3-0,0-3-0], [12:Edge,0-0-11], [18:0-1-12,0-2-8], [22:0-4-0,0-2-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.91 Vert(LL) -0.27 18-20 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.79 Vert(CT) -0.47 18-20 >681 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr YES WB 0.91 Horz(CT) 0.07 16 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Attic -0.09 17-18 >910 360 Weight: 291 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2 *Except* B4:2x4 SP No.3, B5:2x4 SP No.2, B3:2x8 SP No.2
WEBS 2x4 SP No.3
WEDGE Right: 2x4 SP No.2
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-18, 21-22, 9-22
This truss requires both edges of the bottom chord be sheathed in the room
area.
REACTIONS (lb/size)2=904/0-5-8, (min. 0-1-8), 12=164/0-5-8, (min. 0-1-8), 16=2484/0-5-8,
(min. 0-3-10)
Max Horiz 2=494 (LC 10)
Max Uplift 2=-329 (LC 10), 12=-285 (LC 11), 16=-1008 (LC 10)
Max Grav 2=954 (LC 26), 12=401 (LC 25), 16=3070 (LC 2)
13 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-641/0, 3-30=-1379/421, 4-30=-1327/441, 4-5=-1213/407, 6-7=-120/287, 7-8=-986/2696, 8-9=-861/2550, 9-10=-505/1496, 10-31=-516/1456, 11-31=-520/1454, 11-32=-388/905,
12-32=-409/866
BOT CHORD 2-20=-736/1225, 20-33=-426/669, 19-33=-426/669, 18-19=-426/669, 16-17=-3/282, 16-22=-2864/967, 8-22=-354/250, 14-15=-800/420, 12-14=-800/420
WEBS 4-20=-319/321, 5-20=-216/738, 5-18=-859/553, 18-21=-223/1051, 6-21=-307/301, 11-14=0/321, 21-22=-1320/500, 9-15=-786/2169, 7-21=-739/1946, 15-22=-2150/997,
9-22=-3901/1386, 7-22=-1216/553, 11-15=-893/446
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 2-7-10, Zone1 2-7-10 to 22-1-14, Zone2 22-1-14 to 33-10-2, Zone1 33-10-2 to 38-8-6, Zone3 38-8-6 to
42-10-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3)All plates are MT20 plates unless otherwise indicated.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Ceiling dead load (5.0 psf) on member(s). 21-22
7)Bottom chord live load (40.0 psf) and additional bottom chord dead load (0.0 psf) applied only to room. 17-18
8)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 329 lb uplift at joint 2, 1008 lb uplift at joint 16 and 285 lb
uplift at joint 12.
9)ATTIC SPACE SHOWN IS DESIGNED AS UNINHABITABLE.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 8 1B7Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:16 Page: 1
ID:D4WVkAMssEKaA2DrwHrrIgybjii-3ECv11LhTlcLd7BABVzTVfnYVhr46ggh0JqQj0yJsFj
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6
=2x3
=5x4
=5x6
=5x6 =5x4 =5x4
=5x8
=5x4 =5x4
=5x6
=3x6
NAILED
NAILED
8
13 20 21 12 11 10 9
1 7
65
2 4
3
T1 T2
T3
T4
B1 B2
W4 W5 W4
W1
W2 W2
W1 W3
1-6-0
30-2-0
2-0-0
26-8-0
2-0-0
28-8-0
3-7-10
24-8-0
5-7-10
5-7-10
7-8-6
13-4-0
7-8-6
21-0-6
1-8-8
26-6-4
2-1-12
28-8-0
7-0-0
24-9-12
8-10-4
8-10-4
8-11-8
17-9-126-5-150-6-31-4-31-4-34-8-116-0-14Plate Offsets (X, Y):[5:0-2-12,0-2-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.99 Vert(LL) 0.19 10-11 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.92 Vert(CT) -0.36 10-11 >944 180
BCLL 0.0*Rep Stress Incr NO WB 0.55 Horz(CT) 0.06 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 158 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1 *Except* T3,T4:2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (3-7-11 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 6-8-4 oc bracing.
REACTIONS (lb/size) 1=1144/0-5-8, (min. 0-1-8), 7=1231/0-5-8, (min. 0-1-9)
Max Horiz 1=-165 (LC 13)
Max Uplift 1=-407 (LC 8), 7=-490 (LC 9)
Max Grav 1=1237 (LC 2), 7=1308 (LC 2)
14 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-2545/889, 2-3=-2243/680, 3-4=-2490/798, 4-5=-4360/1430, 5-6=-2312/794, 6-7=-2401/814
BOT CHORD 1-13=-876/2319, 13-20=-381/1565, 20-21=-381/1565, 12-21=-381/1565, 11-12=-381/1565, 10-11=-907/2828, 9-10=-1179/3909, 7-9=-683/2189
WEBS 5-10=-829/331, 5-9=-1805/529, 6-9=-225/828, 2-13=-494/454, 3-13=-204/720, 3-11=-341/1067, 4-11=-785/549, 4-10=-386/1442
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 407 lb uplift at joint 1 and 490 lb uplift at joint 7.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
8)"NAILED" indicates 3-10d (0.148"x3") or 2-12d (0.148"x3.25") toe-nails per NDS guidlines.
9)In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-3=-60, 3-5=-60, 5-6=-60, 6-8=-60, 14-17=-20
Concentrated Loads (lb)
Vert: 9=9 (B)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:16 Page: 1
ID:90h6HUoSNIsTVazm1rUIlGybji8-3ECv11LhTlcLd7BABVzTVfnXBhp06mEh0JqQj0yJsFj
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x6
=2x3
=3x6
=3x4
=5x6
=3x6 =3x4
=3x4
=5x6
=3x10
=5x6
=5x6
1 10
14 25 26 13 12 11
2 9
21 24
87
634
2322
5
T2
T1
T3
T4
T5
B1 B2
W1
W2 W2
W3 W4
W5 W6
HW2HW1
1-6-0
-1-6-0
1-6-0
30-2-0
1-11-1
22-8-0
2-0-0
24-8-0
4-0-0
28-8-0
6-0-14
6-0-14
7-3-2
13-4-0
7-4-15
20-8-15
5-2-8
22-9-12
5-10-4
28-8-0
8-6-8
17-7-4
9-0-12
9-0-126-5-150-6-32-2-32-2-33-10-116-0-14Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.86 Vert(LL) -0.30 12-14 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.98 Vert(CT) -0.52 12-14 >657 180
BCLL 0.0*Rep Stress Incr YES WB 0.43 Horz(CT) 0.09 9 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 139 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (3-2-15 max.): 7-8.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
REACTIONS (lb/size) 2=1237/0-5-8, (min. 0-1-9), 9=1237/0-5-8, (min. 0-1-9)
Max Horiz 2=150 (LC 10)
Max Uplift 2=-465 (LC 10), 9=-489 (LC 11)
Max Grav 2=1315 (LC 2), 9=1312 (LC 2)
15 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-21=-2433/934, 3-21=-2334/954, 3-4=-2173/820, 4-22=-2112/829, 5-22=-2100/845, 5-23=-2303/972, 6-23=-2378/955, 6-7=-3283/1264, 7-8=-2978/1164, 8-24=-2401/975,
9-24=-2426/963
BOT CHORD 2-14=-794/2193, 14-25=-417/1538, 25-26=-417/1538, 13-26=-417/1538, 12-13=-417/1538, 11-12=-948/2700, 9-11=-755/2179
WEBS 3-14=-430/403, 5-14=-201/696, 5-12=-337/988, 6-12=-772/510, 6-11=-129/606, 7-11=-1199/425, 8-11=-341/1142
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 9-1-1, Zone2 9-1-1 to 17-6-15, Zone1 17-6-15 to 22-8-0, Zone2 22-8-0 to 27-2-0,
Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 465 lb uplift at joint 2 and 489 lb uplift at joint 9.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:17 Page: 1
ID:abNFvWqKgDE2M1iLiz1?Nvybji5-XRmHENMJE3kCEHmNlDUi2sKk_58IrEGrEzazFTyJsFi
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=2x3
=3x4
=5x6
=3x6 =3x4
=5x6
=3x4
=5x6
=5x6
7
11 22 23 10 9 8
1 6
21
18
2 54
19 20
3
T1
T2
T3
T4
B1 B2
W4 W5W1
W2
W3
W2
HW1 HW2
1-6-0
30-2-0
2-0-0
22-8-0
6-0-14
6-0-14
6-0-0
28-8-0
7-4-0
20-8-0
7-3-2
13-4-0
4-11-0
22-6-4
6-1-12
28-8-0
8-6-7
17-7-4
9-0-12
9-0-126-5-150-6-33-0-33-0-33-0-116-0-14Plate Offsets (X, Y):[1:Edge,0-0-11]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.99 Vert(LL) -0.28 9-11 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.95 Vert(CT) -0.50 9-11 >686 180
BCLL 0.0*Rep Stress Incr YES WB 0.36 Horz(CT) 0.09 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 134 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (3-9-11 max.): 4-5.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
REACTIONS (lb/size) 1=1144/0-5-8, (min. 0-1-8), 6=1239/0-5-8, (min. 0-1-9)
Max Horiz 1=-165 (LC 15)
Max Uplift 1=-406 (LC 10), 6=-490 (LC 11)
Max Grav 1=1238 (LC 2), 6=1314 (LC 2)
16 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-18=-2453/1027, 2-18=-2354/1046, 2-19=-2188/906, 3-19=-2116/922, 3-20=-2286/1017, 4-20=-2353/1001, 4-5=-2191/998, 5-21=-2330/1010, 6-21=-2401/990
BOT CHORD 1-11=-812/2214, 11-22=-447/1545, 22-23=-447/1545, 10-23=-447/1545, 9-10=-447/1545, 8-9=-978/2645, 6-8=-763/2149
WEBS 4-8=-806/361, 5-8=-241/783, 2-11=-441/411, 3-11=-211/709, 4-9=-724/467, 3-9=-308/952
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 9-1-1, Zone2 9-1-1 to 17-6-15, Zone1 17-6-15 to 20-8-0, Zone2 20-8-0 to 27-2-0,
Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 406 lb uplift at joint 1 and 490 lb uplift at joint 6.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:17 Page: 1
ID:SMcmlttrkSlUqf06xp6xXlybji1-XRmHENMJE3kCEHmNlDUi2sKi_59prFOrEzazFTyJsFi
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x6
=2x3
=3x4
=5x6
=3x6
=5x6
=5x8
=5x6
=5x6
7
10 22 23 9 8
1 6
21
17 20
2
541819
3
T1
T2
T3
T4
B1 B2
W1
W2 W3
W4 W5
HW1 HW2
1-6-0
30-2-0
2-0-0
20-8-0
5-4-0
18-8-0
6-0-14
6-0-14
7-3-2
13-4-0
8-0-0
28-8-0
9-0-12
9-0-12
9-9-0
18-9-12
9-10-4
28-8-06-5-150-6-33-10-33-10-32-2-116-0-14Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.93 Vert(LL) -0.34 8-10 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.99 Vert(CT) -0.58 8-10 >594 180
BCLL 0.0*Rep Stress Incr YES WB 0.63 Horz(CT) 0.07 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 131 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T1:2x4 SP No.1
BOT CHORD 2x4 SP No.2 *Except* B2:2x4 SP No.1
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (3-7-7 max.): 4-5.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 6=1239/0-5-8, (min. 0-1-9)
Max Horiz 1=-165 (LC 15)
Max Uplift 1=-406 (LC 10), 6=-490 (LC 11)
Max Grav 1=1241 (LC 2), 6=1317 (LC 2)
17 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-17=-2468/1049, 2-17=-2369/1069, 2-18=-2203/925, 3-18=-2129/942, 3-19=-2605/1238, 4-19=-2638/1222, 4-5=-2361/1055, 5-20=-2229/997, 20-21=-2243/980, 6-21=-2311/970
BOT CHORD 1-10=-820/2227, 10-22=-464/1541, 22-23=-464/1541, 9-23=-464/1541, 8-9=-464/1541, 6-8=-736/2057
WEBS 2-10=-441/414, 3-10=-212/732, 3-8=-519/1257, 4-8=-1113/590, 5-8=-134/658
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 9-1-1, Zone2 9-1-1 to 17-6-15, Zone1 17-6-15 to 18-8-0, Zone2 18-8-0 to 24-10-15,
Zone1 24-10-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 406 lb uplift at joint 1 and 490 lb uplift at joint 6.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:17 Page: 1
ID:L7sGbFwLnhFvJGJuAfBtibybjhz-XRmHENMJE3kCEHmNlDUi2sKjx588rBFrEzazFTyJsFi
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=2x3
=3x4
=5x6
=3x6
=5x6
=5x8
=5x8
=3x4 =2x3
=3x8
8
12 23 24 11 10 9
1 7
22
19
212
6
20 54
3
T1
T2
T3
T4
B1 B2
W1
W2 W3
W4 W5 W4
W6
HW1 HW2
1-6-0
30-2-0
2-0-0
18-8-0
2-4-10
21-0-10
3-4-0
16-8-0
6-0-14
6-0-14
7-3-2
13-4-0
7-7-6
28-8-0
1-8-8
18-6-4
7-9-0
16-9-12
9-0-12
9-0-12
10-1-12
28-8-06-5-150-6-34-8-34-8-31-4-116-0-14Plate Offsets (X, Y):[1:Edge,0-0-11], [5:0-3-0,0-2-8], [7:Edge,0-0-7]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.76 Vert(LL) -0.22 9-18 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.99 Vert(CT) -0.47 9-18 >740 180
BCLL 0.0*Rep Stress Incr YES WB 0.38 Horz(CT) 0.08 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 144 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T1:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (4-1-8 max.): 4-5.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing, Except:
8-2-15 oc bracing: 10-12.
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 7=1239/0-5-8, (min. 0-1-9)
Max Horiz 1=-165 (LC 15)
Max Uplift 1=-406 (LC 10), 7=-490 (LC 11)
Max Grav 1=1236 (LC 2), 7=1312 (LC 2)
18 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-19=-2445/1094, 2-19=-2346/1114, 2-20=-2176/970, 3-20=-2101/986, 3-4=-2200/1144, 4-5=-1993/997, 5-6=-2086/982, 6-21=-2202/1048, 21-22=-2239/1036, 7-22=-2309/1022
BOT CHORD 1-12=-855/2208, 12-23=-496/1538, 23-24=-496/1538, 11-24=-496/1538, 10-11=-496/1538, 9-10=-626/1892, 7-9=-797/2066
WEBS 2-12=-441/413, 3-12=-217/691, 3-10=-437/949, 4-10=-924/557, 5-10=-198/260, 5-9=-188/522, 6-9=-368/333
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 9-1-1, Zone2 9-1-1 to 13-4-0, Zone3 13-4-0 to 16-8-0, Zone2 16-8-0 to 22-10-15,
Zone1 22-10-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 406 lb uplift at joint 1 and 490 lb uplift at joint 7.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:17 Page: 1
ID:Du5nRc_srvlLotdfPVFpsRybjhv-XRmHENMJE3kCEHmNlDUi2sKma588rFArEzazFTyJsFi
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6
=2x3
=3x4
=5x6
=5x6
=3x8
=3x6
=5x6
=3x4 =2x3
=5x6
8
12 11 10 9
1 7
22
19
2
621
20
54
3
T1
T2 T3
T4
B1 B2
W1
W2 W3 W4 W5 W6
W7
HW1 HW2
1-4-0
14-8-0
1-6-0
30-2-0
2-0-0
16-8-0
4-7-1
21-3-1
6-0-14
6-0-14
7-3-2
13-4-0
7-4-15
28-8-0
5-2-5
20-0-1
5-9-0
14-9-12
8-7-15
28-8-0
9-0-12
9-0-126-5-150-6-35-6-35-6-30-6-116-0-14Plate Offsets (X, Y):[1:Edge,0-0-11]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.95 Vert(LL) -0.14 12-15 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.85 Vert(CT) -0.31 12-15 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.30 Horz(CT) 0.08 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 147 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (4-7-7 max.): 4-5.
BOT CHORD Rigid ceiling directly applied or 6-4-5 oc bracing.
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 7=1239/0-5-8, (min. 0-1-8)
Max Horiz 1=-165 (LC 15)
Max Uplift 1=-406 (LC 10), 7=-490 (LC 11)
19 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-19=-2297/1047, 2-19=-2178/1067, 2-20=-1975/924, 3-20=-1886/941, 3-4=-1663/911, 4-5=-1562/858, 5-21=-2029/990, 6-21=-2039/972, 6-22=-2110/967, 7-22=-2197/942
BOT CHORD 1-12=-835/2062, 11-12=-473/1435, 10-11=-521/1528, 9-10=-521/1528, 7-9=-729/1947
WEBS 2-12=-438/408, 3-12=-220/535, 3-11=-292/642, 4-11=-553/289, 5-9=-285/560, 6-9=-354/334
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 9-1-1, Zone2 9-1-1 to 13-4-0, Zone3 13-4-0 to 14-8-0, Zone2 14-8-0 to 20-10-15,
Zone1 20-10-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 406 lb uplift at joint 1 and 490 lb uplift at joint 7.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C6Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:18 Page: 1
ID:6gLIG_1Mv8FnGVwQeKKl0Hybjhr-?dKfSjNx?Mt3sRLZIw?xa4tuJVWbaje_TdJWnvyJsFh
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=2x3
=3x5
=5x8
=MT18HS 3x10
=5x6
=3x8 =2x3
=3x8
7
10 21 22 9 8
1 6
20
17
2 5
1918
3 4
T1
T2
T3
B1 B2
W2
W1
W3 W2
W1
HW1 HW2
1-6-0
30-2-0
3-7-0
16-1-8
5-10-1
21-11-9
5-10-1
12-6-8
6-8-7
6-8-7
6-8-7
28-8-0
9-4-7
19-0-4
9-7-12
28-8-0
9-7-12
9-7-126-2-00-6-35-8-15Plate Offsets (X, Y):[1:Edge,0-0-7], [3:0-1-12,0-2-8], [4:0-2-5,Edge], [6:Edge,0-0-7]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.53 Vert(LL) -0.29 8-10 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.98 Vert(CT) -0.49 8-10 >704 180 MT18HS 244/190
BCLL 0.0*Rep Stress Incr YES WB 0.26 Horz(CT) 0.08 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 135 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.1 *Except* B2:2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-5-14 oc purlins, except
2-0-0 oc purlins (4-7-5 max.): 3-4.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
WEBS 1 Row at midpt 3-8
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 6=1239/0-5-8, (min. 0-1-9)
Max Horiz 1=-158 (LC 15)
Max Uplift 1=-397 (LC 10), 6=-456 (LC 11)
Max Grav 1=1238 (LC 2), 6=1314 (LC 2)
20 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-17=-2406/844, 2-17=-2345/866, 2-18=-2159/756, 3-18=-2095/777, 3-4=-1601/700, 4-19=-2077/759, 5-19=-2140/743, 5-20=-2320/842, 6-20=-2384/819
BOT CHORD 1-10=-732/2164, 10-21=-403/1608, 21-22=-403/1608, 9-22=-403/1608, 8-9=-403/1608, 6-8=-644/2142
WEBS 3-10=-194/684, 2-10=-396/374, 4-8=-121/657, 5-8=-386/367
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 8-3-9, Zone2 8-3-9 to 20-4-7, Zone1 20-4-7 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 397 lb uplift at joint 1 and 456 lb uplift at joint 6.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C7Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:18 Page: 1
ID:90jfxKrKaV_7gIUM5o5xz4ybjAW-?dKfSjNx?Mt3sRLZIw?xa4t_xVUUajE_TdJWnvyJsFh
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=2x3
=3x4
=5x8
=3x6
=5x6
=3x8 =2x3
=3x8
7
10 9 8
1 6
18
17
2 5
3 4
T1
T2
T3
B1 B2
W2
W1
W3 W2
W1
HW1 HW2
1-6-0
30-2-0
3-10-1
21-11-9
3-10-1
10-6-8
6-8-7
6-8-7
6-8-7
28-8-0
7-7-0
18-1-8
9-4-15
19-0-7
9-7-9
28-8-0
9-7-9
9-7-95-4-00-6-34-10-15Plate Offsets (X, Y):[1:Edge,0-0-7], [3:0-1-12,0-2-8], [4:0-2-5,Edge], [6:Edge,0-0-7]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.96 Vert(LL) -0.15 10-13 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.92 Vert(CT) -0.34 8-10 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.18 Horz(CT) 0.08 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 131 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-6-0 oc purlins, except
2-0-0 oc purlins (2-2-0 max.): 3-4.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
WEBS 1 Row at midpt 3-8
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 6=1239/0-5-8, (min. 0-1-8)
Max Horiz 1=-137 (LC 15)
Max Uplift 1=-371 (LC 10), 6=-431 (LC 11)
21 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-17=-2227/862, 2-17=-2146/884, 2-3=-1967/812, 3-4=-1687/763, 4-5=-1957/794, 5-18=-2129/859, 6-18=-2212/837
BOT CHORD 1-10=-684/1981, 9-10=-508/1692, 8-9=-508/1692, 6-8=-655/1965
WEBS 3-10=-129/474, 2-10=-298/309, 4-8=-64/470, 5-8=-287/302
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 6-3-9, Zone2 6-3-9 to 22-0-15, Zone1 22-0-15 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 371 lb uplift at joint 1 and 431 lb uplift at joint 6.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C8Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:18 Page: 1
ID:ZbPoaMtCtQNiXlDxnxeebjybjAT-?dKfSjNx?Mt3sRLZIw?xa4tt6VVOalU_TdJWnvyJsFh
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=2x3
=5x6
=3x8
=3x4
=3x6 =3x8
=5x6
=2x3
=3x8
8
11 10 9
1 7
23
18
2219
2 6
3 20 4 21 5
T1
T2
T3
B1 B2
W2 W3
W1
W3 W2
W1
HW1 HW2
1-6-0
30-2-0
1-10-2
21-11-10
1-10-2
8-6-8
5-9-8
14-4-0
5-9-8
20-1-8
6-8-6
6-8-6
6-8-6
28-8-0
9-4-15
19-0-7
9-7-9
28-8-0
9-7-9
9-7-94-6-00-6-34-0-15Plate Offsets (X, Y):[1:Edge,0-0-7], [7:Edge,0-0-7]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.54 Vert(LL) 0.18 9-11 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.93 Vert(CT) -0.36 9-11 >969 180
BCLL 0.0*Rep Stress Incr YES WB 0.28 Horz(CT) 0.09 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 132 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-6-3 oc purlins, except
2-0-0 oc purlins (3-9-7 max.): 3-5.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 7=1239/0-5-8, (min. 0-1-8)
Max Horiz 1=-117 (LC 15)
Max Uplift 1=-380 (LC 6), 7=-457 (LC 7)
22 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-18=-2226/874, 18-19=-2146/885, 2-19=-2132/896, 2-3=-1968/810, 3-20=-1953/811, 4-20=-1953/811, 4-21=-1945/798, 5-21=-1945/798, 5-6=-1960/796, 6-22=-2116/869,
22-23=-2128/860, 7-23=-2211/847
BOT CHORD 1-11=-694/1981, 10-11=-787/2195, 9-10=-787/2195, 7-9=-663/1964
WEBS 3-11=-203/603, 4-11=-393/249, 2-11=-284/302, 4-9=-400/256, 5-9=-183/592, 6-9=-267/291
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 4-3-9, Zone2 4-3-9 to 12-9-7, Zone1 12-9-7 to 15-10-9, Zone2 15-10-9 to 24-4-7,
Zone1 24-4-7 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 380 lb uplift at joint 1 and 457 lb uplift at joint 7.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C9Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:19 Page: 1
ID:zA5wCNv4ALlHODyWS3CLDLybjAQ-?dKfSjNx?Mt3sRLZIw?xa4t_jVVGajs_TdJWnvyJsFh
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x6
=5x8
=2x3 =3x10 =2x3
=3x6 =2x3
=5x8
=5x6
6
10 9 8 7
1 5
2019
2 17 3 18 4
T1
T2
T3
B1 B2
W1 W2 W1 W2 W1
HW1 HW2
1-6-0
30-2-0
6-6-8
6-6-8
6-6-8
28-8-0
7-9-8
14-4-0
7-9-8
22-1-8
6-8-4
28-8-0
6-8-4
6-8-4
7-7-12
21-11-12
7-7-12
14-4-03-8-00-6-33-2-15Plate Offsets (X, Y):[2:0-3-0,0-2-8], [4:0-3-0,0-2-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.78 Vert(LL) 0.23 7-9 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.75 Vert(CT) -0.38 7-9 >894 180
BCLL 0.0*Rep Stress Incr YES WB 0.62 Horz(CT) 0.09 5 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 127 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP SS
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-1-12 oc purlins, except
2-0-0 oc purlins (3-2-3 max.): 2-4.
BOT CHORD Rigid ceiling directly applied or 6-11-4 oc bracing.
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 5=1239/0-5-8, (min. 0-1-8)
Max Horiz 1=-97 (LC 15)
Max Uplift 1=-414 (LC 6), 5=-490 (LC 7)
23 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-2263/870, 2-17=-2929/1271, 3-17=-2929/1271, 3-18=-2929/1271, 4-18=-2929/1271, 4-19=-2163/853, 19-20=-2218/833, 5-20=-2247/831
BOT CHORD 1-10=-721/2012, 9-10=-717/2018, 8-9=-693/2001, 7-8=-693/2001, 5-7=-697/1995
WEBS 2-10=0/272, 2-9=-480/1089, 3-9=-543/416, 4-9=-489/1098, 4-7=0/270
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone2 3-0-0 to 10-9-7, Zone1 10-9-7 to 17-10-9, Zone2 17-10-9 to 26-4-7, Zone1 26-4-7 to 27-2-0,
Zone3 27-2-0 to 30-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 414 lb uplift at joint 1 and 490 lb uplift at joint 5.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C10Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:19 Page: 1
ID:sxKR2lybDaFjtqFHhvGHNBybjAM-Tpu1f3Namg?wUbwlseWA7HP5luuNJ5t8iH34JLyJsFg
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=5x6
=3x4
=3x4
=3x4
=3x6
=MT18HS 3x10
=3x4
=3x4
=5x6
=3x8
8
12 11 10 9
1 7
2 19 3 4 5 20 6
T1
T2 T3
T4
B1 B2
W1 W2 W3 W3 W2 W1
HW1 HW2
1-6-0
30-2-0
4-6-8
4-6-8
4-6-8
28-8-0
6-6-5
17-7-3
6-6-5
24-1-8
6-6-5
11-0-13
4-8-4
28-8-0
4-8-4
4-8-4
9-7-12
23-11-12
9-7-12
14-4-02-10-00-6-32-4-15Plate Offsets (X, Y):[1:Edge,0-0-7], [7:Edge,0-0-7]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.82 Vert(LL) 0.42 11 >823 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.90 Vert(CT) -0.69 9-11 >502 180 MT18HS 244/190
BCLL 0.0*Rep Stress Incr YES WB 0.49 Horz(CT) 0.13 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 127 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.1
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-2-12 oc purlins, except
2-0-0 oc purlins (2-5-12 max.): 2-6.
BOT CHORD Rigid ceiling directly applied or 4-10-9 oc bracing.
WEBS 1 Row at midpt 3-12, 5-9
REACTIONS (lb/size) 1=1144/ Mechanical, (min. 0-1-8), 7=1239/0-5-8, (min. 0-1-8)
Max Horiz 1=-76 (LC 15)
Max Uplift 1=-447 (LC 6), 7=-523 (LC 7)
24 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-2365/943, 2-19=-2164/907, 3-19=-2164/907, 3-4=-3884/1629, 4-5=-3884/1629, 5-20=-2138/884, 6-20=-2138/884, 6-7=-2339/922
BOT CHORD 1-12=-806/2121, 11-12=-1621/3724, 10-11=-1614/3716, 9-10=-1614/3716, 7-9=-783/2095
WEBS 2-12=-169/634, 3-12=-1702/853, 3-11=0/383, 5-11=0/386, 5-9=-1713/863, 6-9=-169/634
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone2 3-0-0 to 8-9-7, Zone1 8-9-7 to 19-10-9, Zone2 19-10-9 to 27-2-0, Zone3 27-2-0 to 30-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 447 lb uplift at joint 1 and 523 lb uplift at joint 7.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1C11Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:19 Page: 1
ID:GW0agm?TWVdHkI_sM1q_?qybjAJ-Tpu1f3Namg?wUbwlseWA7HP52urxJ7w8iH34JLyJsFg
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x6
=5x8
=2x5 =2x3
=5x8
=3x6 =5x8
=2x5 =5x6 =2x3
=5x8 =2x5
=5x8
=3x6
9
32 15 33 34 3514 36 37 13 12 38 11 39 40 10
1 8
22 2 23 24 25 3 26 27 4 5 28 29 6 30 31 7
T1
T3T2
T4
B2B1
W1 W1 W1 W1 W1W2W2W2W2
1-6-0
30-2-0
2-6-8
2-6-8
2-6-8
28-8-0
5-9-14
14-4-0
5-9-14
20-1-14
5-11-10
26-1-8
5-11-10
8-6-2
2-8-4
28-8-0
2-8-4
2-8-4
5-9-14
25-11-12
5-9-14
20-1-14
5-9-14
14-4-0
5-9-14
8-6-22-0-00-6-31-6-15Plate Offsets (X, Y):[2:0-1-12,0-2-4], [7:0-1-12,0-2-4]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.60 Vert(LL) 0.56 13 >613 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.77 Vert(CT) -0.77 13 >449 180
BCLL 0.0*Rep Stress Incr NO WB 0.59 Horz(CT) 0.05 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 305 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except
2-0-0 oc purlins (4-9-11 max.): 2-7.
BOT CHORD Rigid ceiling directly applied or 8-10-10 oc bracing.
REACTIONS (lb/size) 1=1137/ Mechanical, (min. 0-1-8), 8=1229/0-5-8, (min. 0-1-8)
Max Horiz 1=-56 (LC 13)
Max Uplift 1=-517 (LC 4), 8=-593 (LC 5)
25 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-22=-2629/1231, 2-22=-2588/1227, 2-23=-5423/2615, 23-24=-5423/2615, 24-25=-5423/2615, 3-25=-5423/2615, 3-26=-5423/2615, 26-27=-5423/2615, 4-27=-5423/2615,
4-5=-5423/2615, 5-28=-5399/2610, 28-29=-5399/2610, 6-29=-5399/2610, 6-30=-5399/2610, 30-31=-5399/2610, 7-31=-5399/2610, 7-8=-2574/1217
BOT CHORD 1-32=-1097/2405, 15-32=-1097/2405, 15-33=-1096/2425, 33-34=-1096/2425, 34-35=-1096/2425, 14-35=-1096/2425, 14-36=-3192/6738, 36-37=-3192/6738, 13-37=-3192/6738,
12-13=-3192/6738, 12-38=-3192/6738, 11-38=-3192/6738, 11-39=-1079/2370, 39-40=-1079/2370, 10-40=-1079/2370, 8-10=-1082/2353
WEBS 2-15=0/251, 3-14=-355/294, 5-13=0/299, 6-11=-355/295, 7-11=-1509/3094, 5-11=-1368/658, 2-14=-1490/3077, 5-14=-1354/648
NOTES
1)2-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc.
Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc.
Web connected as follows: 2x4 - 1 row at 0-9-0 oc.
2)All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections
have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3)Unbalanced roof live loads have been considered for this design.
4)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)Provide adequate drainage to prevent water ponding.
6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
8)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 517 lb uplift at joint 1 and 593 lb uplift at joint 8.
9)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
10)Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 29 lb down and 52 lb up at 2-0-12, 29 lb down and
50 lb up at 4-0-12, 29 lb down and 50 lb up at 6-0-12, 29 lb down and 50 lb up at 8-0-12, 29 lb down and 50 lb up at 10-0-12, 29 lb down and 50 lb
up at 12-0-12, 29 lb down and 50 lb up at 14-0-12, 29 lb down and 50 lb up at 16-0-12, 29 lb down and 50 lb up at 18-0-12, 29 lb down and 50 lb up
at 20-0-12, 29 lb down and 50 lb up at 22-0-12, and 29 lb down and 50 lb up at 24-0-12, and 66 lb down and 115 lb up at 26-1-8 on top chord, and
18 lb down and 1 lb up at 2-0-12, 18 lb down and 1 lb up at 4-0-12, 18 lb down and 1 lb up at 6-0-12, 18 lb down and 1 lb up at 8-0-12, 18 lb down
and 1 lb up at 10-0-12, 18 lb down and 1 lb up at 12-0-12, 18 lb down and 1 lb up at 14-0-12, 18 lb down and 1 lb up at 16-0-12, 18 lb down and 1 lb
up at 18-0-12, 18 lb down and 1 lb up at 20-0-12, 18 lb down and 1 lb up at 22-0-12, and 18 lb down and 1 lb up at 24-0-12, and 45 lb down and 4 lb
up at 26-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-2=-60, 2-7=-60, 7-9=-60, 16-19=-20
Concentrated Loads (lb)
Vert: 7=0 (F), 12=1 (F), 5=0 (F), 13=1 (F), 6=0 (F), 11=1 (F), 10=4 (F), 22=0 (F), 23=0 (F), 24=0 (F), 25=0 (F), 26=0 (F), 27=0 (F), 28=0
(F), 29=0 (F), 30=0 (F), 31=0 (F), 32=1 (F), 33=1 (F), 34=1 (F), 35=1 (F), 36=1 (F), 37=1 (F), 38=1 (F), 39=1 (F), 40=1 (F)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 2C12Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:20 Page: 1
ID:ZtxD8A4stfWI4M0CG?SenIybjAC-Tpu1f3Namg?wUbwlseWA7HP8Vuu4J5L8iH34JLyJsFg
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x5
=5x8
=2x5 =7x8 =1.5x3 =5x8
=2x5 =5x6 =5x4
=5x6
=3x5
1 8
13 27 28 12 29 30 31 11 32 10 9
2 7
3 20 21 4 22 23 24 5 25 26 6
T1
T2
T1
B1 B2
W1 W2 W1 W2 W1 W2 W1
1-6-0
21-8-0
1-6-0
-1-6-0
2-2-8
2-2-8
2-2-8
20-2-0
5-1-13
12-7-15
5-3-9
17-11-8
5-3-9
7-6-1
2-4-4
2-4-4
2-4-4
20-2-0
5-1-13
17-9-12
5-1-13
12-7-15
5-1-13
7-6-11-10-50-6-31-5-4Plate Offsets (X, Y):[3:0-1-12,0-2-0]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.81 Vert(LL) 0.36 11-12 >673 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.88 Vert(CT) -0.50 11-12 >483 180
BCLL 0.0*Rep Stress Incr NO WB 1.00 Horz(CT) 0.04 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 109 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 4-4-15 oc purlins, except
2-0-0 oc purlins (2-6-10 max.): 3-6.
BOT CHORD Rigid ceiling directly applied or 5-10-2 oc bracing.
REACTIONS (lb/size) 2=872/0-5-8, (min. 0-1-8), 7=872/0-5-8, (min. 0-1-8)
Max Horiz 2=38 (LC 8)
Max Uplift 2=-410 (LC 4), 7=-410 (LC 5)
26 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-1693/756, 3-20=-3240/1508, 20-21=-3240/1508, 4-21=-3240/1508, 4-22=-3240/1508, 22-23=-3240/1508, 23-24=-3240/1508, 5-24=-3240/1508, 5-25=-1539/698,
25-26=-1539/698, 6-26=-1539/698, 6-7=-1622/719
BOT CHORD 2-13=-640/1547, 13-27=-636/1560, 27-28=-636/1560, 12-28=-636/1560, 12-29=-1524/3376, 29-30=-1524/3376, 30-31=-1524/3376, 11-31=-1524/3376, 11-32=-1524/3376,
10-32=-1524/3376, 9-10=-1524/3376, 7-9=-628/1482
WEBS 3-12=-832/1720, 4-12=-310/247, 5-9=-1881/915, 6-9=-122/447
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 410 lb uplift at joint 2 and 410 lb uplift at joint 7.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
8)Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 53 lb down and 92 lb up at 2-2-8, 23 lb down and
40 lb up at 4-3-4, 23 lb down and 40 lb up at 6-3-4, 23 lb down and 40 lb up at 8-3-4, 23 lb down and 40 lb up at 10-1-0, 23 lb down and 40 lb up at
11-10-12, 23 lb down and 40 lb up at 13-10-12, and 23 lb down and 40 lb up at 15-10-12, and 53 lb down and 92 lb up at 17-11-8 on top chord, and
44 lb down and 10 lb up at 2-2-8, 17 lb down and 4 lb up at 4-3-4, 17 lb down and 4 lb up at 6-3-4, 17 lb down and 4 lb up at 8-3-4, 17 lb down and 4
lb up at 10-1-0, 17 lb down and 4 lb up at 11-10-12, 17 lb down and 4 lb up at 13-10-12, and 17 lb down and 4 lb up at 15-10-12, and 44 lb down and
10 lb up at 17-10-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
9)In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-3=-60, 3-6=-60, 6-8=-60, 14-17=-20
Concentrated Loads (lb)
Vert: 10=4 (B), 13=10 (B), 9=10 (B), 27=4 (B), 28=4 (B), 29=4 (B), 30=4 (B), 31=4 (B), 32=4 (B)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1D1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:21 Page: 1
ID:s1R8J?nFDTp31HSMgBVE7Xybj9I-x0RQsPOCX_7n5kVyQL2PfVyFxIBV2SFHwxodsoyJsFf
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x5
=5x8
=1.5x3 =3x8 =1.5x3
=3x6 =1.5x3
=5x8
=3x5
71
11 10 9 8
62
3 18 4 19 5
T1
T2
T1
B1 B2
W1 W2 W1 W2 W1
HW1 HW2
1-6-0
21-8-0
1-6-0
-1-6-0
4-2-8
20-2-0
4-2-8
4-2-8
5-10-8
10-1-0
5-10-8
15-11-8
4-4-4
20-2-0
4-4-4
4-4-4
5-8-12
15-9-12
5-8-12
10-1-02-8-50-6-32-3-4Plate Offsets (X, Y):[2:Edge,0-0-11], [3:0-3-0,0-2-8], [5:0-3-0,0-2-8], [6:Edge,0-0-11]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.51 Vert(LL) 0.15 10 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.53 Vert(CT) -0.22 10-11 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.34 Horz(CT) 0.04 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 93 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
WEDGE Left: 2x4 SP No.2
Right: 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 4-5-0 oc purlins, except
2-0-0 oc purlins (3-5-13 max.): 3-5.
BOT CHORD Rigid ceiling directly applied or 8-4-14 oc bracing.
REACTIONS (lb/size) 2=897/0-5-8, (min. 0-1-8), 6=897/0-5-8, (min. 0-1-8)
Max Horiz 2=-58 (LC 11)
Max Uplift 2=-374 (LC 6), 6=-374 (LC 7)
27 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-1522/587, 3-18=-2145/936, 4-18=-2145/936, 4-19=-2145/936, 5-19=-2145/936, 5-6=-1522/586
BOT CHORD 2-11=-475/1349, 10-11=-470/1354, 9-10=-473/1354, 8-9=-473/1354, 6-8=-477/1349
WEBS 3-10=-402/891, 4-10=-407/314, 5-10=-402/891
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone2 1-6-0 to 8-5-7, Zone1 8-5-7 to 11-8-9, Zone2 11-8-9 to 18-8-0, Zone3 18-8-0 to 21-8-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 374 lb uplift at joint 2 and 374 lb uplift at joint 6.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1D2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:21 Page: 1
ID:D_E1MirO1?SM72LJSk4Pqaybj9D-PC?o4lPqIHFeju48_3ZeCiVVQicBn3lQ9bYBOEyJsFe
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x6
=7x8
=3x10 =3x8 =1.5x3
=M18AHS 5x10 =3x10
=7x8
=5x8
HHUS26-2
LUS26
LUS26 LUS26
LUS26 LUS26 LUS26
LUS26 LUS26
1
17 18 1019 20 9 21 8 22 7 23 24 25
62
3 4 5
T1
T2
T3
B1 B2
W1 W2 W1 W2 W1
1-6-0
-1-6-0
4-0-0
14-1-0
4-0-0
10-1-0
6-1-0
6-1-0
6-1-0
20-2-0
3-10-4
13-11-4
3-10-4
10-1-0
6-2-12
6-2-12
6-2-12
20-2-03-5-110-6-33-0-10Plate Offsets (X, Y):[2:0-0-7,Edge], [3:0-3-4,0-2-8], [5:0-3-4,0-2-8], [6:Edge,0-1-3]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.98 Vert(LL) 0.22 9 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.80 Vert(CT) -0.37 9-10 >662 180 M18AHS 186/179
BCLL 0.0*Rep Stress Incr NO WB 0.63 Horz(CT) 0.07 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 209 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1 *Except* T2:2x4 SP No.2, T3:2x4 SP SS
BOT CHORD 2x6 SP SS
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (2-11-10 max.): 3-5.
BOT CHORD Rigid ceiling directly applied or 9-0-4 oc bracing.
REACTIONS (lb/size) 2=5688/0-5-8, (min. 0-3-6), 6=6127/0-5-8, (min. 0-3-10)
Max Horiz 2=92 (LC 8)
Max Uplift 2=-2216 (LC 4), 6=-2227 (LC 5)
28 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-11401/4292, 3-4=-12037/4492, 4-5=-12037/4492, 5-6=-11571/4252
BOT CHORD 2-17=-3898/10471, 17-18=-3898/10471, 10-18=-3898/10471, 10-19=-3963/10642, 19-20=-3963/10642, 9-20=-3963/10642, 9-21=-3920/10817, 8-21=-3920/10817, 8-22=-3920/10817,
7-22=-3920/10817, 7-23=-3858/10637, 23-24=-3858/10637, 24-25=-3858/10637, 6-25=-3858/10637
WEBS 3-10=-1217/3143, 3-9=-522/1804, 5-9=-579/1577, 5-7=-1166/3325
NOTES
1)2-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc.
Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc.
Web connected as follows: 2x4 - 1 row at 0-9-0 oc.
2)All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections
have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3)Unbalanced roof live loads have been considered for this design.
4)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)Provide adequate drainage to prevent water ponding.
6)All plates are MT20 plates unless otherwise indicated.
7)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
9)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 2227 lb uplift at joint 6 and 2216 lb uplift at joint 2.
10)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
11)Use Simpson Strong-Tie HHUS26-2 (14-10d Girder, 4-10d Truss) or equivalent at 2-8-0 from the left end to connect truss(es) to front face of bottom
chord.
12)Use Simpson Strong-Tie LUS26 (4-10d Girder, 4-10d Truss) or equivalent spaced at 4-0-0 oc max. starting at 4-7-4 from the left end to 14-7-4 to
connect truss(es) to front face of bottom chord.
13)Use Simpson Strong-Tie LUS26 (4-SD9112 Girder, 4-SD9212 Truss, Single Ply Girder) or equivalent spaced at 4-0-0 oc max. starting at 12-7-4 from
the left end to 18-7-4 to connect truss(es) to front face of bottom chord.
14)Fill all nail holes where hanger is in contact with lumber.
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-3=-60, 3-5=-60, 5-6=-60, 11-14=-20
Concentrated Loads (lb)
Vert: 17=-1117 (F), 18=-1124 (F), 19=-1124 (F), 20=-1124 (F), 21=-1124 (F), 22=-1124 (F), 23=-1124 (F), 24=-1124 (F), 25=-1124 (F)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 2D3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:21 Page: 1
ID:tIzatp_vChyfZuFd9FIDK6ybj91-PC?o4lPqIHFeju48_3ZeCiVN0iY_n?9Q9bYBOEyJsFe
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x6
=3x4
=5x6
=5x4
=3x4
=8x8 =2x3
NAILED
NAILED
NAILED
NAILED
THJA26
NAILED
NAILED
NAILED
1
8 15 16 17
7
2
3
4 13 5 14 6
T1
T2
W1
B1
W1 W2 W3
HW1
1-6-0
-1-6-0
3-9-10
10-8-10
3-11-6
14-8-0
6-11-0
6-11-0
7-0-12
7-0-12
7-7-4
14-8-03-9-140-10-123-9-53-9-5Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.84 Vert(LL) 0.08 7-8 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.62 Vert(CT) -0.16 7-8 >999 180
BCLL 0.0*Rep Stress Incr NO WB 0.72 Horz(CT) 0.02 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 85 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x4 SP No.3 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-11-8 oc purlins, except end
verticals, and 2-0-0 oc purlins (4-4-6 max.): 4-6.
BOT CHORD Rigid ceiling directly applied or 7-7-7 oc bracing.
REACTIONS (lb/size) 2=1124/0-5-8, (min. 0-1-8), 7=1274/ Mechanical, (min. 0-1-8)
Max Horiz 2=193 (LC 8)
Max Uplift 2=-603 (LC 8), 7=-753 (LC 4)
29 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-738/379, 3-4=-1761/959, 4-13=-1568/936, 5-13=-1568/936
BOT CHORD 2-8=-935/1557, 8-15=-715/1099, 15-16=-715/1099, 16-17=-715/1099, 7-17=-715/1099
WEBS 4-8=-64/364, 5-8=-329/640, 5-7=-1426/940
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 753 lb uplift at joint 7 and 603 lb uplift at joint 2.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
8)Use Simpson Strong-Tie THJA26 (THJA26 on 1 ply, Left Hand Hip) or equivalent at 6-11-6 from the left end to connect truss(es) to front face of bottom
chord.
9)Fill all nail holes where hanger is in contact with lumber.
10)"NAILED" indicates 3-10d (0.148"x3") or 3-12d (0.148"x3.25") toe-nails per NDS guidlines.
11)In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-4=-60, 4-6=-60, 7-9=-20
Concentrated Loads (lb)
Vert: 4=-118 (F), 8=-475 (F), 5=-118 (F), 13=-118 (F), 14=-118 (F), 15=-66 (F), 16=-66 (F), 17=-66 (F)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1E1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:22 Page: 1
ID:bhPx6F8SBi8h5m9U8eXiqtybjla-tOZAH5QS3bNVL2fKXm4tlw1a16x0WQ2aOFHkwgyJsFd
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x10
=5x4
=1.5x3
=5x6
=3x8
=3x4
=1.5x3
1
8
7
2
3
13
4
5 6
T1
T2
W2
B1
W1
W2 W3
HW1
1-6-0
-1-6-0
2-6-7
8-11-0
6-4-9
6-4-9
5-9-0
14-8-0
5-7-4
14-8-0
9-0-12
9-0-124-7-140-10-124-7-54-7-5Plate Offsets (X, Y):[2:0-6-15,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.46 Vert(LL) -0.10 8-11 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.57 Vert(CT) -0.21 8-11 >813 180
BCLL 0.0*Rep Stress Incr YES WB 0.28 Horz(CT) 0.02 2 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 79 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 9-2-13 oc bracing.
REACTIONS (lb/size) 2=675/0-5-8, (min. 0-1-8), 7=576/ Mechanical, (min. 0-1-8)
Max Horiz 2=240 (LC 10)
Max Uplift 2=-262 (LC 10), 7=-243 (LC 6)
30 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-530/0, 3-13=-702/300, 4-13=-679/309, 4-5=-566/251, 5-6=-488/254, 6-7=-537/328
BOT CHORD 2-8=-400/648
WEBS 4-8=-244/260, 6-8=-307/597
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 4-8-1, Zone2 4-8-1 to 11-6-4, Zone3 11-6-4 to 14-6-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 243 lb uplift at joint 7 and 262 lb uplift at joint 2.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1E2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:22 Page: 1
ID:u1KbafDrYs1iRrBq2c9LdLybjlT-tOZAH5QS3bNVL2fKXm4tlw1g06ywWX?aOFHkwgyJsFd
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=5x4 =1.5x3
=3x4
=5x6
=3x4 =1.5x3
1
8
7
2
3
4 13
5 6
T1
T2
W4
B1
W3
W1
W2
HW1
1-6-0
-1-6-0
4-10-9
10-11-0
3-9-0
14-8-0
6-0-7
6-0-7
7-3-10
14-8-0
7-4-6
7-4-65-5-140-10-125-5-55-5-5Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.26 Vert(LL) -0.07 7-8 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.49 Vert(CT) -0.15 7-8 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.39 Horz(CT) 0.01 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 82 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 9-0-2 oc bracing.
REACTIONS (lb/size) 2=675/0-5-8, (min. 0-1-8), 7=576/ Mechanical, (min. 0-1-8)
Max Horiz 2=287 (LC 10)
Max Uplift 2=-262 (LC 10), 7=-235 (LC 10)
31 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-300/0, 3-4=-798/268, 4-13=-686/262, 5-13=-625/279
BOT CHORD 2-8=-420/690, 7-8=-188/301
WEBS 5-7=-507/328, 4-8=-277/294, 5-8=-238/486
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 6-8-1, Zone2 6-8-1 to 11-6-4, Zone3 11-6-4 to 14-6-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 235 lb uplift at joint 7 and 262 lb uplift at joint 2.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1E3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:22 Page: 1
ID:umo90r0AYeu6vEOZZYMMQmybjlk-tOZAH5QS3bNVL2fKXm4tlw1j?6z6WVGaOFHkwgyJsFd
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x10
=5x4
=1.5x3
=3x4
=5x6
=3x4 =1.5x3
1
8
7
2
3
4
13
5 6
T1
T2
W4
B1
W3
W1
W2
HW1
1-6-0
-1-6-0
1-9-0
14-8-0
6-4-9
6-4-9
6-6-7
12-11-0
5-8-15
14-8-0
8-11-1
8-11-16-3-140-10-126-3-56-3-5Plate Offsets (X, Y):[2:0-6-15,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.46 Vert(LL) -0.10 8-11 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.55 Vert(CT) -0.19 8-11 >898 180
BCLL 0.0*Rep Stress Incr YES WB 0.42 Horz(CT) 0.01 2 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 86 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 8-6-13 oc bracing.
REACTIONS (lb/size) 2=675/0-5-8, (min. 0-1-8), 7=576/ Mechanical, (min. 0-1-8)
Max Horiz 2=334 (LC 10)
Max Uplift 2=-252 (LC 10), 7=-293 (LC 10)
32 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-520/0, 3-4=-686/267, 4-13=-564/170, 5-13=-481/187
BOT CHORD 2-8=-464/683
WEBS 5-7=-568/376, 4-8=-377/366, 5-8=-248/529
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 8-8-1, Zone2 8-8-1 to 12-11-0, Zone3 12-11-0 to 14-6-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 293 lb uplift at joint 7 and 252 lb uplift at joint 2.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1E4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:23 Page: 1
ID:Yo?Gz7y2j5FpoTWcm_mBjjybjlp-Mb7YVRQ4qvVLyCEW5Tb6H7arlWISFy0jdv1HS7yJsFc
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=7x8 =5x4
=3x4
=3x6
=5x5 =5x4
7
6
5
1
8
9
2
10 3
11
12
4
W1
T2
T1
W5
B1
W2
W3 W4
6-10-14
6-10-14
7-9-2
14-8-0
6-10-14
6-10-14
7-9-2
14-8-07-0-10-10-127-0-1Plate Offsets (X, Y):[7:0-2-8,0-3-0]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.76 Vert(LL) 0.03 5-6 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.23 Vert(CT) -0.05 5-6 >999 180
BCLL 0.0*Rep Stress Incr NO WB 0.35 Horz(CT) 0.01 5 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 281 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1 *Except* T1:2x4 SP SS
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size) 5=2192/ Mechanical, (min. 0-1-8), 7=1958/0-5-8, (min. 0-1-8)
Max Horiz 7=326 (LC 8)
Max Uplift 5=-1079 (LC 8), 7=-805 (LC 8)
Max Grav 5=2355 (LC 15), 7=2117 (LC 15)
33 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-7=-1994/808, 1-8=-3999/1435, 8-9=-3602/1338, 2-9=-3309/1237, 2-10=-809/170, 3-10=-506/66, 3-11=-467/74, 4-5=-733/409
BOT CHORD 6-7=-685/836, 5-6=-1571/3487
WEBS 1-6=-889/2716, 2-5=-3717/1672
NOTES
1)3-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc.
Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc.
Web connected as follows: 2x4 - 1 row at 0-9-0 oc.
2)All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections
have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3)Unbalanced roof live loads have been considered for this design.
4)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 805 lb uplift at joint 7 and 1079 lb uplift at joint 5.
8)Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 745 lb down and 272 lb up at 3-10-12, 745 lb down
and 272 lb up at 5-10-12, 745 lb down and 272 lb up at 7-10-12, and 745 lb down and 272 lb up at 9-10-12, and 745 lb down and 272 lb up at
11-10-12 on top chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-4=-60, 5-7=-20
Concentrated Loads (lb)
Vert: 8=-600, 9=-600, 10=-600, 11=-600, 12=-600
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 3E5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:23 Page: 1
ID:qtOVsiqm41?EbwlhAubrKcybjlz-Mb7YVRQ4qvVLyCEW5Tb6H7an3WNKFz4jdv1HS7yJsFc
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=3x4
=5x6
=5x4
=3x4
=5x4
=MT18HS 3x10
=M18AHS 5x10
=3x4
=5x4
=5x6
=3x4
=5x8
111
32 33 15 34 35 36 14 37 13 38 39 12 40 41
102
93
82930 3142425 26 5 27 6 28 7
T1
T2 T2
T1
B1 B2
W1 W1 W1 W1 W1 W1HW1 HW1
1-6-0
28-2-0
1-6-0
-1-6-0
3-4-0
3-4-0
3-4-0
26-8-0
6-8-0
16-8-0
6-8-0
23-4-0
6-8-0
10-0-0
6-8-0
13-4-0
6-8-1
20-0-1
6-7-15
26-8-0
6-8-0
6-8-02-3-150-10-122-3-7Plate Offsets (X, Y):[2:0-5-7,0-0-5], [10:0-5-7,0-0-5]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.76 Vert(LL) 0.42 14 >760 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.90 Vert(CT) -0.49 14-15 >657 180 MT18HS 244/190
BCLL 0.0*Rep Stress Incr NO WB 0.51 Horz(CT) 0.07 10 n/a n/a M18AHS 186/179
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 146 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP SS
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x4 SP No.3 -- 1-11-0, Right 2x4 SP No.3 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-11-10 oc purlins, except
2-0-0 oc purlins (2-11-13 max.): 4-8.
BOT CHORD Rigid ceiling directly applied or 4-6-12 oc bracing.
REACTIONS (lb/size) 2=1349/0-5-8, (min. 0-1-9), 10=1350/0-5-8, (min. 0-1-9)
Max Horiz 2=-49 (LC 28)
Max Uplift 2=-777 (LC 4), 10=-779 (LC 5)
34 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-657/281, 3-4=-2198/1372, 4-24=-3135/1834, 24-25=-3135/1834, 25-26=-3135/1834, 5-26=-3135/1834, 5-27=-4382/2617, 6-27=-4382/2617, 6-28=-4382/2617, 7-28=-4382/2617,
7-29=-3136/1835, 29-30=-3136/1835, 30-31=-3136/1835, 8-31=-3136/1835, 8-9=-2200/1375, 9-10=-557/236
BOT CHORD 2-32=-1172/1966, 32-33=-1172/1966, 15-33=-1172/1966, 15-34=-2532/4182, 34-35=-2532/4182, 35-36=-2532/4182, 14-36=-2532/4182, 14-37=-2536/4183, 13-37=-2536/4183,
13-38=-2536/4183, 38-39=-2536/4183, 12-39=-2536/4183, 12-40=-1182/1968, 40-41=-1182/1968, 10-41=-1182/1968
WEBS 4-15=-674/1348, 5-15=-1213/893, 5-14=-16/345, 7-14=-15/344, 7-12=-1212/892, 8-12=-673/1347
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 777 lb uplift at joint 2 and 779 lb uplift at joint 10.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
9)Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 95 lb down and 162 lb up at 3-4-0, 42 lb down and
71 lb up at 5-4-12, 42 lb down and 71 lb up at 7-4-12, 42 lb down and 71 lb up at 9-4-12, 42 lb down and 71 lb up at 11-4-12, 42 lb down and 71 lb
up at 13-4-12, 42 lb down and 71 lb up at 15-4-12, 42 lb down and 71 lb up at 17-4-12, 42 lb down and 71 lb up at 19-4-12, and 42 lb down and 71 lb
up at 21-4-12, and 95 lb down and 162 lb up at 23-4-0 on top chord, and 43 lb down and 8 lb up at 3-4-0, 15 lb down and 13 lb up at 5-4-12, 15 lb
down and 13 lb up at 7-4-12, 15 lb down and 13 lb up at 9-4-12, 15 lb down and 13 lb up at 11-4-12, 15 lb down and 13 lb up at 13-4-12, 15 lb down
and 13 lb up at 15-4-12, 15 lb down and 13 lb up at 17-4-12, 15 lb down and 13 lb up at 19-4-12, and 15 lb down and 13 lb up at 21-4-12, and 43 lb
down and 8 lb up at 23-3-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
10)In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-4=-60, 4-8=-60, 8-11=-60, 16-20=-20
Concentrated Loads (lb)
Vert: 4=-32 (B), 6=-16 (B), 8=-32 (B), 14=-15 (B), 24=-16 (B), 25=-16 (B), 26=-16 (B), 27=-16 (B), 28=-16 (B), 29=-16 (B), 30=-16 (B),
31=-16 (B), 32=-25 (B), 33=-15 (B), 34=-15 (B), 35=-15 (B), 36=-15 (B), 37=-15 (B), 38=-15 (B), 39=-15 (B), 40=-15 (B), 41=-25 (B)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1G1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:24 Page: 1
ID:9j7piJVei6OID2CE3SmgM_ybjNs-Mb7YVRQ4qvVLyCEW5Tb6H7anyWCsFwWjdv1HS7yJsFc
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x10
=5x4
=5x6
=3x4
=3x4
=MT18HS 3x10
=3x4
=5x6
=5x4
=5x10
91
12 11 10
82
73
6421522
T1
T2
T1
B1 B2
W1 W1 W1 W1
HW1 HW1
1-6-0
28-2-0
1-6-0
-1-6-0
5-4-0
5-4-0
5-4-0
26-8-0
8-0-0
21-4-0
8-0-0
13-4-0
7-11-15
17-3-15
9-4-0
9-4-0
9-4-1
26-8-03-1-150-10-123-1-7Plate Offsets (X, Y):[2:0-6-15,Edge], [8:0-6-15,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.97 Vert(LL) 0.29 10-12 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.88 Vert(CT) -0.44 10-12 >731 180 MT18HS 244/190
BCLL 0.0*Rep Stress Incr YES WB 0.30 Horz(CT) 0.11 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 123 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0, Right 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (2-2-0 max.): 4-6.
BOT CHORD Rigid ceiling directly applied or 5-5-11 oc bracing.
REACTIONS (lb/size) 2=1157/0-5-8, (min. 0-1-8), 8=1157/0-5-8, (min. 0-1-8)
Max Horiz 2=-70 (LC 11)
Max Uplift 2=-473 (LC 6), 8=-473 (LC 7)
35 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-557/8, 3-4=-1796/772, 4-21=-2203/900, 5-21=-2203/900, 5-22=-2203/900, 6-22=-2203/900, 6-7=-1796/772, 7-8=-431/8
BOT CHORD 2-12=-621/1588, 11-12=-1112/2612, 10-11=-1112/2612, 8-10=-615/1588
WEBS 4-12=-221/788, 5-12=-543/388, 5-10=-543/388, 6-10=-221/788
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone2 1-6-0 to 9-6-15, Zone1 9-6-15 to 17-1-1, Zone2 17-1-1 to 25-2-0, Zone3 25-2-0 to 28-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)All plates are MT20 plates unless otherwise indicated.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 473 lb uplift at joint 2 and 473 lb uplift at joint 8.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1G2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:24 Page: 1
ID:Whwil1ZmWf1bJp5Cs?Mr32ybjNn-qnhwimRibCdCaMpjfB6LqL7uTvZR_R5trYmr?ZyJsFb
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x10
=5x4
=5x6
=3x4
=3x4
=3x6
=3x4
=5x6
=5x4
=5x10
1 9
12 11 10
2 8
3 7
21 24
23 64225
T1
T2
T1
B1 B2
W1 W2 W2 W1
HW1 HW1
1-6-0
-1-6-0
1-6-0
28-2-0
6-0-0
19-4-0
6-0-0
13-4-0
7-4-0
7-4-0
7-4-0
26-8-0
7-2-11
16-11-5
9-8-11
26-8-0
9-8-11
9-8-113-11-150-10-123-11-7Plate Offsets (X, Y):[2:0-6-15,Edge], [8:0-6-15,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.79 Vert(LL) 0.18 10-12 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.92 Vert(CT) -0.29 12-15 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.20 Horz(CT) 0.10 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 122 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1 *Except* T2:2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0, Right 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except
2-0-0 oc purlins (3-11-2 max.): 4-6.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
REACTIONS (lb/size) 2=1157/0-5-8, (min. 0-1-8), 8=1157/0-5-8, (min. 0-1-8)
Max Horiz 2=90 (LC 10)
Max Uplift 2=-440 (LC 6), 8=-440 (LC 7)
36 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-626/0, 3-21=-1746/683, 4-21=-1663/706, 4-22=-1766/729, 5-22=-1766/729, 5-23=-1766/729, 6-23=-1766/729, 6-24=-1663/706, 7-24=-1746/683, 7-8=-510/0
BOT CHORD 2-12=-527/1533, 11-12=-730/1972, 10-11=-730/1972, 8-10=-516/1533
WEBS 4-12=-93/474, 5-12=-369/232, 5-10=-369/232, 6-10=-93/474
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 3-1-1, Zone2 3-1-1 to 11-6-15, Zone1 11-6-15 to 15-1-1, Zone2 15-1-1 to 23-6-15,
Zone1 23-6-15 to 25-2-0, Zone3 25-2-0 to 28-2-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 440 lb uplift at joint 2 and 440 lb uplift at joint 8.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1G3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:24 Page: 1
ID:sfkbokdvLBfuQbz9fYy0m5ybjNi-qnhwimRibCdCaMpjfB6LqL7xHvYs_SgtrYmr?ZyJsFb
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x10
=5x4
=2x3
=5x6
=3x8 =3x6
=5x8
=3x4 =2x3
=5x4
=5x10
101
13 12 11
92
83
22 23
74
5 6
T1
T2
T1
B1 B2
W1
W2 W3 W2
W1
HW1 HW1
1-6-0
-1-6-0
1-6-0
28-2-0
2-1-1
9-4-0
2-1-1
19-5-1
8-0-0
17-4-0
7-2-15
7-2-15
7-2-15
26-8-0
7-8-8
17-2-4
9-5-12
9-5-12
9-5-12
26-8-04-9-150-10-124-9-7Plate Offsets (X, Y):[2:0-6-15,Edge], [6:0-3-0,0-2-8], [9:0-6-15,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.96 Vert(LL) 0.14 11-13 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.88 Vert(CT) -0.27 11-13 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.13 Horz(CT) 0.08 9 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 133 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T2:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0, Right 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied, except
2-0-0 oc purlins (2-2-0 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 8-1-7 oc bracing.
WEBS 1 Row at midpt 6-13
REACTIONS (lb/size) 2=1157/0-5-8, (min. 0-1-8), 9=1157/0-5-8, (min. 0-1-8)
Max Horiz 2=-110 (LC 11)
Max Uplift 2=-406 (LC 6), 9=-406 (LC 7)
37 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-569/23, 3-22=-1748/694, 4-22=-1662/716, 4-5=-1592/701, 5-6=-1484/680, 6-7=-1592/701, 7-23=-1662/716, 8-23=-1748/694, 8-9=-448/22
BOT CHORD 2-13=-507/1534, 12-13=-437/1483, 11-12=-437/1483, 9-11=-507/1534
WEBS 4-13=-126/250, 5-13=-84/337, 6-11=-134/338
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 5-1-1, Zone2 5-1-1 to 21-6-15, Zone1 21-6-15 to 25-2-0, Zone3 25-2-0 to 28-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 406 lb uplift at joint 2 and 406 lb uplift at joint 9.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1G4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:25 Page: 1
ID:lQz6e5gQPQ9JuCHwuO0ywxybjNe-qnhwimRibCdCaMpjfB6LqL7uZvZW_TntrYmr?ZyJsFb
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x8
=5x4 =2x3
=3x4
=5x6
=3x6
=5x6
=3x8 =2x3
=5x4
=5x10
1 10
13 12 11
2 9
3 8
22 2347
5 6
T1
T2
T1
B1 B2
W2
W1
W3 W2
W1
HW1 HW1
1-6-0
-1-6-0
1-6-0
28-2-0
3-3-2
18-7-2
3-3-2
11-4-0
4-0-0
15-4-0
8-0-14
8-0-14
8-0-14
26-8-0
7-4-7
16-11-9
9-7-3
9-7-3
9-8-7
26-8-05-7-150-10-125-7-7Plate Offsets (X, Y):[5:0-0-12,0-2-8], [6:0-2-5,Edge], [9:0-6-15,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.75 Vert(LL) -0.13 11-20 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.90 Vert(CT) -0.27 11-20 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.17 Horz(CT) 0.07 9 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 135 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1 *Except* T2:2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0, Right 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-10-4 oc purlins, except
2-0-0 oc purlins (4-10-12 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 8-0-4 oc bracing.
REACTIONS (lb/size) 2=1157/0-5-8, (min. 0-1-8), 9=1157/0-5-8, (min. 0-1-8)
Max Horiz 2=-130 (LC 15)
Max Uplift 2=-422 (LC 10), 9=-422 (LC 11)
38 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-594/19, 3-22=-1739/652, 4-22=-1610/678, 4-5=-1592/694, 5-6=-1299/620, 6-7=-1585/689, 7-23=-1609/678, 8-23=-1738/653, 8-9=-486/15
BOT CHORD 2-13=-510/1525, 12-13=-341/1297, 11-12=-341/1297, 9-11=-468/1524
WEBS 5-13=-240/446, 4-13=-286/322, 6-11=-160/412, 7-11=-287/322
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 7-1-1, Zone2 7-1-1 to 19-6-15, Zone1 19-6-15 to 25-2-0, Zone3 25-2-0 to 28-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 422 lb uplift at joint 2 and 422 lb uplift at joint 9.
7)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1G5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:25 Page: 1
ID:2mul6VmplZ2KEHJGoMfbiQybjNX-IzFIw6SKMWl3CWNvDudaMYf7eJuNjwO04CWOX?yJsFa
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x10
=5x4 =2x3
=3x6
=3x4
=5x6
=3x6 =3x4
=3x6 =2x3
=5x4
=5x10
1 11
14 23 13 24 12
2 10
93
8475
6
T2
T1
T2
T1
B1 B2
W2
W1
W2
W1
HW1 HW1
1-6-0
-1-6-0
1-6-0
28-2-0
5-3-2
13-4-0
5-3-2
18-7-2
8-0-14
26-8-0
8-0-14
8-0-14
7-5-11
17-0-13
9-7-3
26-8-0
9-7-3
9-7-36-5-150-10-126-5-7Plate Offsets (X, Y):[2:0-6-15,Edge], [10:0-6-15,Edge], [10:0-0-0,0-0-0]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.76 Vert(LL) -0.20 12-14 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 1.00 Vert(CT) -0.31 12-14 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.29 Horz(CT) 0.08 10 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 129 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T1:2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0, Right 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-9-12 oc purlins.
BOT CHORD Rigid ceiling directly applied or 1-4-12 oc bracing.
REACTIONS (lb/size) 2=1157/0-5-8, (min. 0-1-8), 10=1157/0-5-8, (min. 0-1-8)
Max Horiz 2=150 (LC 10)
Max Uplift 2=-444 (LC 10), 10=-444 (LC 11)
Max Grav 2=1228 (LC 2), 10=1228 (LC 2)
39 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-598/3, 3-4=-1879/746, 4-5=-1757/752, 5-6=-1704/770, 6-7=-1704/770, 7-8=-1757/752, 8-9=-1880/746, 9-10=-478/3
BOT CHORD 2-14=-578/1667, 14-23=-311/1253, 13-23=-311/1253, 13-24=-311/1253, 12-24=-311/1253, 10-12=-511/1667
WEBS 6-12=-293/647, 8-12=-343/349, 6-14=-293/647, 4-14=-343/349
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 9-1-1, Zone2 9-1-1 to 17-6-15, Zone1 17-6-15 to 25-2-0, Zone3 25-2-0 to 28-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
5)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 444 lb uplift at joint 2 and 444 lb uplift at joint 10.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1G6Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:25 Page: 1
ID:wX8GyspJpoYljuc21CjYtGybjNT-IzFIw6SKMWl3CWNvDudaMYf7ZJtojuS04CWOX?yJsFa
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x10
=5x4 =2x3
=3x6
=3x4
=5x6
=3x6 =3x4 =2x3
=5x4
=5x8
1
12 23 11 24 10
2 9
3 8
22
74521
6
T2
T1
T3
B1 B2
W2
W1
W2
W1
HW1 HW1
1-6-0
-1-6-0
5-3-2
13-4-0
5-3-2
18-7-2
8-0-14
8-0-14
8-0-14
26-8-0
7-5-11
17-0-13
9-7-3
26-8-0
9-7-3
9-7-36-5-150-10-126-5-7Plate Offsets (X, Y):[2:0-6-15,Edge], [9:0-6-3,0-0-4]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.95 Vert(LL) -0.19 10-12 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.98 Vert(CT) -0.30 10-12 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.30 Horz(CT) 0.07 9 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 127 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* T1:2x4 SP No.1
BOT CHORD 2x4 SP No.1 *Except* B2:2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0, Right 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing.
REACTIONS (lb/size) 2=1159/0-5-8, (min. 0-1-8), 9=1064/0-5-8, (min. 0-1-8)
Max Horiz 2=165 (LC 10)
Max Uplift 2=-445 (LC 10), 9=-386 (LC 11)
Max Grav 2=1230 (LC 2), 9=1151 (LC 2)
40 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-605/0, 3-4=-1884/757, 4-5=-1762/763, 5-6=-1709/781, 6-21=-1715/806, 7-21=-1769/787, 7-22=-1819/781, 8-22=-1891/756, 8-9=-520/0
BOT CHORD 2-12=-594/1671, 12-23=-368/1257, 11-23=-368/1257, 11-24=-368/1257, 10-24=-368/1257, 9-10=-593/1679
WEBS 6-10=-300/659, 7-10=-350/353, 6-12=-293/648, 4-12=-343/349
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 9-1-1, Zone2 9-1-1 to 17-6-15, Zone1 17-6-15 to 23-8-0, Zone3 23-8-0 to 26-8-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60
plate grip DOL=1.60
3)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
5)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 386 lb uplift at joint 9 and 445 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 11 1G7Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:25 Page: 1
ID:pINnoEsqt02BBVwpG1oU16ybjNP-IzFIw6SKMWl3CWNvDudaMYf4VJt6juK04CWOX?yJsFa
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=5x8
=5x4 =5x4
=3x3
4
1
2
9 10
3
T1 W1
B1
HW1
6-6-0
6-6-03-7-40-10-123-7-4Plate Offsets (X, Y):[1:0-2-12,0-0-4]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.91 Vert(LL) 0.15 4-7 >499 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.88 Vert(CT) 0.12 4-7 >626 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) -0.07 1 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 29 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals.
BOT CHORD Rigid ceiling directly applied or 4-5-10 oc bracing.
REACTIONS (lb/size) 1=254/0-5-8, (min. 0-1-8), 4=254/ Mechanical, (min. 0-1-8)
Max Horiz 1=149 (LC 10)
Max Uplift 1=-70 (LC 10), 4=-160 (LC 10)
41 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-466/31, 3-4=-175/383
BOT CHORD 1-4=-677/240
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-0 to 3-0-0, Zone1 3-0-0 to 3-4-4, Zone3 3-4-4 to 6-4-4 zone; cantilever left and right exposed ; end vertical left
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
5)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 70 lb uplift at joint 1 and 160 lb uplift at joint 4.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 4 1G8Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:26 Page: 1
ID:h4dHdbvLwFYdg7EaVtsQCyybjNL-m9ph7STz7qtwqfy5mc8pvmCF_jEvSPHAJsFy3RyJsFZ
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
3.5356 12
=3x4
1
4
2
8
3
T1
B1
2-1-7
-2-1-7
5-3-9
5-3-9
5-3-92-5-140-6-32-0-15Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.60 Vert(LL) -0.03 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.27 Vert(CT) -0.07 4-7 >937 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.01 3 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 19 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 5-3-9 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=362/0-7-6, (min. 0-1-8), 3=129/ Mechanical, (min. 0-1-8), 4=55/
Mechanical, (min. 0-1-8)
Max Horiz 2=134 (LC 6)
Max Uplift 2=-245 (LC 6), 3=-105 (LC 10)
Max Grav 2=362 (LC 1), 3=129 (LC 1), 4=93 (LC 3)
42 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-854/283
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -2-1-7 to 2-1-7, Zone2 2-1-7 to 5-2-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C
for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 105 lb uplift at joint 3 and 245 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1J1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:26 Page: 1
ID:d8BfEw4ZrhlZhBK94bhCkqybk1k-m9ph7STz7qtwqfy5mc8pvmCKijNRSPHAJsFy3RyJsFZ
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x4
1
4
2
3
T1
B1
1-6-0
-1-6-0
3-10-0
3-10-0
3-10-02-6-70-6-32-1-6Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.26 Vert(LL) 0.01 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.13 Vert(CT) -0.02 4-7 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 14 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-10-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=259/0-5-8, (min. 0-1-8), 3=93/ Mechanical, (min. 0-1-8), 4=40/
Mechanical, (min. 0-1-8)
Max Horiz 2=119 (LC 10)
Max Uplift 2=-115 (LC 10), 3=-84 (LC 10)
Max Grav 2=259 (LC 1), 3=93 (LC 1), 4=68 (LC 3)
43 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-396/141
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 84 lb uplift at joint 3 and 115 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 12 1J2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:26 Page: 1
ID:5Kl1RG4Bc_tQJLvMdJCRH2ybk1j-m9ph7STz7qtwqfy5mc8pvmCP5jPaSPHAJsFy3RyJsFZ
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x8
=5x4
1
5
2
3
4
T1
B1
HW1
1-6-0
-1-6-0
4-7-11
4-7-11
4-7-112-10-80-10-122-9-15Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.34 Vert(LL) 0.04 5-8 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.31 Vert(CT) -0.04 5-8 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) -0.02 4 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 21 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 4-7-11 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=288/0-5-8, (min. 0-1-8), 4=114/ Mechanical, (min. 0-1-8), 5=54/
Mechanical, (min. 0-1-8)
Max Horiz 2=138 (LC 10)
Max Uplift 2=-112 (LC 10), 4=-107 (LC 10), 5=-5 (LC 10)
Max Grav 2=288 (LC 1), 4=114 (LC 1), 5=80 (LC 3)
44 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-267/36
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 107 lb uplift at joint 4, 112 lb uplift at joint 2 and 5 lb uplift at
joint 5.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1J4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:26 Page: 1
ID:fIHBha6Bf5uzsS?61DVElSybjlc-m9ph7STz7qtwqfy5mc8pvmCOljNoSPHAJsFy3RyJsFZ
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x8
=5x4
1
5
2
3
4
T1
B1
HW1
1-6-0
-1-6-0
2-7-11
2-7-11
2-7-112-0-80-10-121-11-15Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.26 Vert(LL) 0.00 5-8 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.05 Vert(CT) 0.00 5-8 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 2 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 15 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-7-11 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=219/0-5-8, (min. 0-1-8), 4=53/ Mechanical, (min. 0-1-8), 5=24/
Mechanical, (min. 0-1-8)
Max Horiz 2=91 (LC 10)
Max Uplift 2=-99 (LC 6), 4=-58 (LC 10), 5=-2 (LC 10)
Max Grav 2=219 (LC 1), 4=53 (LC 1), 5=40 (LC 3)
45 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 58 lb uplift at joint 4, 99 lb uplift at joint 2 and 2 lb uplift at
joint 5.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1J5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:26 Page: 1
ID:fIHBha6Bf5uzsS?61DVElSybjlc-m9ph7STz7qtwqfy5mc8pvmCP5jRrSPHAJsFy3RyJsFZ
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
3.535512
=1.5x3
=3x4
=5x4
=3x4
=3x4 =3x3NAILED
NAILED
NAILED NAILED
NAILED
NAILED
NAILED NAILED
1
7
10 6 11
5
2
8 3
9
4
W1
T1 W5
B1
W2
W3 W4
2-1-7
-2-1-7
4-9-15
4-9-15
4-9-15
9-7-14
4-9-15
4-9-15
4-9-15
9-7-143-9-50-10-123-8-14Plate Offsets (X, Y):[2:0-1-8,0-1-4]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.42 Vert(LL) 0.03 5-6 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.34 Vert(CT) -0.05 5-6 >999 180
BCLL 0.0*Rep Stress Incr NO WB 0.30 Horz(CT) -0.01 5 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 54 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size) 5=437/ Mechanical, (min. 0-1-8), 7=564/0-7-6, (min. 0-1-8)
Max Horiz 7=191 (LC 4)
Max Uplift 5=-287 (LC 8), 7=-352 (LC 4)
46 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-7=-522/369, 2-8=-635/292, 3-8=-563/294
BOT CHORD 6-11=-396/571, 5-11=-396/571
WEBS 2-6=-314/581, 3-5=-596/413
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone; cantilever left and right exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60
3)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
5)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 352 lb uplift at joint 7 and 287 lb uplift at joint 5.
6)"NAILED" indicates 3-10d (0.148"x3") or 2-12d (0.148"x3.25") toe-nails per NDS guidlines.
7)In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25, Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-2=-60, 2-4=-60, 5-7=-20
Concentrated Loads (lb)
Vert: 9=-59 (F=-29, B=-29), 10=-6 (F=-3, B=-3), 11=-52 (F=-26, B=-26)
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1J6Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:27 Page: 1
ID:7VrZvw7qQP0qUcaIaw0TIfybjlb-EMN3LoUbu7?nRpXIKJg2SzlYM7icBosJXW?VbuyJsFY
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x8
=5x4
1
5
2
3
10
4
T1
B1
HW1
1-6-0
-1-6-0
6-11-0
6-11-0
6-11-03-9-140-10-123-9-5Plate Offsets (X, Y):[2:Edge,0-6-0]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.80 Vert(LL) 0.18 5-8 >448 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.69 Vert(CT) -0.22 5-8 >383 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) -0.07 4 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 28 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 4-5-10 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=374/0-5-8, (min. 0-1-8), 4=178/ Mechanical, (min. 0-1-8), 5=86/
Mechanical, (min. 0-1-8)
Max Horiz 2=191 (LC 10)
Max Uplift 2=-139 (LC 10), 4=-161 (LC 10), 5=-6 (LC 10)
Max Grav 2=374 (LC 1), 4=178 (LC 1), 5=124 (LC 3)
47 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-581/126
BOT CHORD 2-5=-448/260
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 2-7-5, Zone2 2-7-5 to 6-10-4 zone; cantilever left and right exposed ; end vertical left
and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 161 lb uplift at joint 4, 139 lb uplift at joint 2 and 6 lb uplift
at joint 5.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 4 1J7Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:27 Page: 1
ID:fIHBha6Bf5uzsS?61DVElSybjlc-EMN3LoUbu7?nRpXIKJg2SzlSJ7dABsXJXW?VbuyJsFY
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
3.5355 12
=3x4
1
4
2
8 3
T1
B1
2-1-7
-2-1-7
2-8-7
2-8-7
2-8-71-8-110-6-31-3-12Plate Offsets (X, Y):[2:Edge,0-0-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.61 Vert(LL) -0.01 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.15 Vert(CT) -0.01 4-7 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 2 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 12 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-8-7 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=284/0-7-6, (min. 0-1-8), 3=46/ Mechanical, (min. 0-1-8), 4=9/
Mechanical, (min. 0-1-8)
Max Horiz 2=91 (LC 6)
Max Uplift 2=-233 (LC 6), 3=-40 (LC 10)
Max Grav 2=284 (LC 1), 3=46 (LC 1), 4=40 (LC 3)
48 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-693/248
BOT CHORD 2-4=-133/286
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -2-1-7 to 2-1-7, Zone2 2-1-7 to 2-7-11 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C
for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 40 lb uplift at joint 3 and 233 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1J8Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:27 Page: 1
ID:hp8k48npc?kctQPaT8z3C3ybji9-EMN3LoUbu7?nRpXIKJg2SzlVN7lZBsXJXW?VbuyJsFY
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
3.5355 12
=3x4
1
4
2
8
3
T1
B1
2-1-7
-2-1-7
3-5-10
3-5-10
3-5-101-11-70-6-31-6-8Plate Offsets (X, Y):[2:Edge,0-0-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.61 Vert(LL) -0.01 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.09 Vert(CT) -0.01 4-7 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 14 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-5-10 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=303/0-7-6, (min. 0-1-8), 3=72/ Mechanical, (min. 0-1-8), 4=24/
Mechanical, (min. 0-1-8)
Max Horiz 2=103 (LC 6)
Max Uplift 2=-232 (LC 6), 3=-60 (LC 10)
Max Grav 2=303 (LC 1), 3=72 (LC 1), 4=57 (LC 3)
49 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-733/255
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -2-1-7 to 2-1-7, Zone2 2-1-7 to 3-4-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C
for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 60 lb uplift at joint 3 and 232 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1J9Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:27 Page: 1
ID:WE_Yufz5W5JmO2hks8zqRDybjNF-EMN3LoUbu7?nRpXIKJg2SzlVN7mTBsXJXW?VbuyJsFY
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x4
1
4
2
3
T1
B1
1-6-0
-1-6-0
2-6-8
2-6-8
2-6-82-0-00-6-31-6-15Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.26 Vert(LL) 0.00 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.05 Vert(CT) 0.00 4-7 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 10 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-6-8 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=216/0-5-8, (min. 0-1-8), 3=53/ Mechanical, (min. 0-1-8), 4=19/
Mechanical, (min. 0-1-8)
Max Horiz 2=88 (LC 10)
Max Uplift 2=-111 (LC 6), 3=-50 (LC 10)
Max Grav 2=216 (LC 1), 3=53 (LC 1), 4=42 (LC 3)
50 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-321/125
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 50 lb uplift at joint 3 and 111 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 13 1J10Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:28 Page: 1
ID:Sc5JJK?M2iZUeLr6zZ?IWeybjND-EMN3LoUbu7?nRpXIKJg2Szlar7n6BsXJXW?VbuyJsFY
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
3.5355 12
=3x4
1
4
2
8
3
T1
B1
2-1-7
-2-1-7
3-0-0
3-0-0
3-0-01-9-120-6-31-4-13Plate Offsets (X, Y):[2:Edge,0-0-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.61 Vert(LL) -0.01 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.13 Vert(CT) -0.01 4-7 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 2 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 13 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=291/0-7-6, (min. 0-1-8), 3=56/ Mechanical, (min. 0-1-8), 4=15/
Mechanical, (min. 0-1-8)
Max Horiz 2=96 (LC 6)
Max Uplift 2=-232 (LC 6), 3=-48 (LC 10)
Max Grav 2=291 (LC 1), 3=56 (LC 1), 4=47 (LC 3)
51 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-708/251
BOT CHORD 2-4=-128/271
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -2-1-7 to 2-1-7, Zone2 2-1-7 to 2-11-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C
for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 48 lb uplift at joint 3 and 232 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1J11Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:28 Page: 1
ID:sBnRxM1ELdx3VpZhehZ?8GybjNA-iYwRY8UDeR7e3z6Uu1BH_BHg7W57wJnSmAk28KyJsFX
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x4
1
4
2
3
T1
B1
1-6-0
-1-6-0
2-2-8
2-2-8
2-2-81-10-50-6-31-5-4Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.26 Vert(LL) 0.00 4-7 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.04 Vert(CT) 0.00 4-7 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 9 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-8 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=207/0-5-8, (min. 0-1-8), 3=42/ Mechanical, (min. 0-1-8), 4=12/
Mechanical, (min. 0-1-8)
Max Horiz 2=80 (LC 10)
Max Uplift 2=-112 (LC 6), 3=-41 (LC 10)
Max Grav 2=207 (LC 1), 3=42 (LC 1), 4=35 (LC 3)
52 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-306/122
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 41 lb uplift at joint 3 and 112 lb uplift at joint 2.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 9 1J12Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:28 Page: 1
ID:HmTaZO47dYJeMHIGKp6imvybjN7-iYwRY8UDeR7e3z6Uu1BH_BHlbW7WwJnSmAk28KyJsFX
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
3.5355 12
=3x10
1
5
4
2
6
3
W1
T1
B1
2-1-7
-2-1-7
4-7-1
4-7-1
4-7-12-3-60-10-122-3-0Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.70 Vert(LL) -0.02 4-5 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.19 Vert(CT) -0.03 4-5 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.02 3 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 18 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 4-7-1 oc purlins, except end
verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)3=102/ Mechanical, (min. 0-1-8), 4=38/ Mechanical, (min. 0-1-8),
5=346/0-7-6, (min. 0-1-8)
Max Horiz 5=108 (LC 6)
Max Uplift 3=-91 (LC 10), 5=-241 (LC 6)
Max Grav 3=102 (LC 1), 4=79 (LC 3), 5=346 (LC 1)
53 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-5=-297/638
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -2-1-7 to 2-1-7, Zone2 2-1-7 to 4-6-5 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C
for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
4)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
5)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 241 lb uplift at joint 5 and 91 lb uplift at joint 3.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 2 1J13Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:28 Page: 1
ID:GytIsyS7euutkRvTqcikC8ybjNw-iYwRY8UDeR7e3z6Uu1BH_BHfeW5CwJnSmAk28KyJsFX
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x8
=5x4
1
5
2
3
4
T1
B1
HW1
1-6-0
-1-6-0
3-4-0
3-4-0
3-4-02-3-150-10-122-3-7Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.26 Vert(LL) 0.01 5-8 >999 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.12 Vert(CT) -0.01 5-8 >999 180
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horz(CT) 0.01 2 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MP Weight: 17 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
SLIDER Left 2x6 SP No.2 -- 1-11-0
BRACING
TOP CHORD Structural wood sheathing directly applied or 3-4-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)2=241/0-5-8, (min. 0-1-8), 4=76/ Mechanical, (min. 0-1-8), 5=35/
Mechanical, (min. 0-1-8)
Max Horiz 2=107 (LC 10)
Max Uplift 2=-100 (LC 6), 4=-75 (LC 10), 5=-3 (LC 10)
Max Grav 2=241 (LC 1), 4=76 (LC 1), 5=54 (LC 3)
54 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES
1)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
3)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
4)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 75 lb uplift at joint 4, 100 lb uplift at joint 2 and 3 lb uplift at
joint 5.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 11 1J14Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:28 Page: 1
ID:GytIsyS7euutkRvTqcikC8ybjNw-iYwRY8UDeR7e3z6Uu1BH_BHlbW6EwJnSmAk28KyJsFX
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
0.12512
=7x12 =10x12 =7x8 =5x4
6
5
4
1 2 3
W1
T1
W5
B1
W2 W3 W4
7-0-0
7-0-0
7-0-0
14-0-0
7-0-0
7-0-0
7-0-0
14-0-01-1-121-0-01-1-12Plate Offsets (X, Y):[6:Edge,0-3-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.92 Vert(LL) 0.57 5 >286 240 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.98 Vert(CT) 0.46 5 >355 180
BCLL 0.0*Rep Stress Incr YES WB 1.00 Horz(CT) -0.04 4 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 64 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3 *Except* W1:2x4 SP No.2, W5:2x6 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end
verticals.
BOT CHORD Rigid ceiling directly applied.
WEBS 1 Row at midpt 1-5, 2-4
REACTIONS (lb/size) 4=545/0-1-8, (min. 0-1-8), 6=545/0-3-8, (min. 0-1-8)
Max Horiz 6=45 (LC 9)
Max Uplift 4=-429 (LC 6), 6=-431 (LC 6)
55 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-6=-451/746, 1-2=-2443/3917, 2-3=-355/584, 3-4=-211/359
BOT CHORD 5-6=-630/417, 4-5=-3883/2440
WEBS 1-5=-3271/2035, 2-5=-134/255, 2-4=-2101/3362
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 zone; cantilever left and right exposed ; end vertical left and right exposed; porch left and right exposed;C-C for
members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate at joint(s) 4.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 431 lb uplift at joint 6 and 429 lb uplift at joint 4.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 22 1P2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:29 Page: 1
ID:aOwfcbMA_wLEEz7tksYKkzybjMl-iYwRY8UDeR7e3z6Uu1BH_BHbHWuuw49SmAk28KyJsFX
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=7x8 =7x8
=1.5x3 =1.5x3
=1.5x3 =1.5x3
=1.5x3 =1.5x3
=3x6
=2x3 =2x3
12
11 10 9
8
1
2
13
3
4
14
5
6 7
W1
T1
T2
W2
B1
ST3
ST2
ST1
1-6-0
-1-6-0
2-1-8
14-8-0
12-6-8
12-6-8
14-8-04-1-69-4-19-4-1Plate Offsets (X, Y):[2:0-3-13,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.83 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.76 Vert(CT) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.21 Horz(CT) 0.00 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 98 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x6 SP No.2 *Except* W2:2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 5-1-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 6-7.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 7-8, 5-9
REACTIONS All bearings 14-8-0.
(lb) - Max Horiz 12=329 (LC 7)
Max Uplift All uplift 100 (lb) or less at joint(s) 8 except 9=-144 (LC 10), 10=-125 (LC
10), 11=-716 (LC 10)
Max Grav All reactions 250 (lb) or less at joint(s) 8 except 9=432 (LC 2), 10=406 (LC
2), 11=315 (LC 2), 12=504 (LC 10)
56 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-12=-280/226, 2-13=-388/192, 3-13=-383/208
WEBS 5-9=-261/236, 3-11=-413/508
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 8-3-9, Zone2 8-3-9 to 12-6-8, Zone3 12-6-8 to 14-6-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)Gable requires continuous bottom chord bearing.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8 except (jt=lb) 9=144, 10=124,
11=715.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V1Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:29 Page: 1
ID:8nHf2jmgTSIn2JAz80oEC?ybizi-AkUplUVrPlFVh7hgSkiWXOqnKwIZfjqc?qUcgmyJsFW
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x4 =7x8
=1.5x3 =1.5x3
=1.5x3 =1.5x3
=5x6
=1.5x3 =1.5x3 =2x3
11
10 9 8
7
1
2
12
3
13 4
5 6
W1
T1
T2
W2
B1
ST3
ST2
ST1
1-6-0
-1-6-0
4-1-8
14-8-0
10-6-8
10-6-8
14-8-03-3-67-8-17-8-1Plate Offsets (X, Y):[2:0-3-13,Edge], [5:0-2-5,Edge]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.54 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.50 Vert(CT) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.24 Horz(CT) 0.00 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 89 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x6 SP No.2 *Except* W2:2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS All bearings 14-8-0.
(lb) - Max Horiz 11=273 (LC 7)
Max Uplift All uplift 100 (lb) or less at joint(s) 7 except 8=-108 (LC 6), 9=-155 (LC
10), 10=-524 (LC 10)
Max Grav All reactions 250 (lb) or less at joint(s) 7 except 8=406 (LC 2), 9=420 (LC
2), 10=284 (LC 2), 11=316 (LC 7)
57 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-12=-301/138, 3-12=-296/155
WEBS 4-9=-258/214, 3-10=-324/400
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 6-3-9, Zone2 6-3-9 to 11-6-4, Zone3 11-6-4 to 14-6-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)Gable requires continuous bottom chord bearing.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 8=108, 9=154,
10=524.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V2Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:29 Page: 1
ID:hTPGp3BhhiA2CRCe2owv_uybixs-AkUplUVrPlFVh7hgSkiWXOqstwMefjFc?qUcgmyJsFW
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=5x4 =5x5
=1.5x3 =1.5x3
=1.5x3 =1.5x3
=3x6
=1.5x3 =1.5x3
=1.5x3 =2x3
12
11 15 10 9
8
1
2
13
3
14
4
5 6 7
W1
T1
T2
W2
B1
ST3
ST2
ST1
1-6-0
-1-6-0
6-1-8
14-8-0
8-6-8
8-6-8
14-8-02-5-66-0-16-0-1Plate Offsets (X, Y):[2:0-2-8,0-1-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.85 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.32 Vert(CT) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.16 Horz(CT) 0.00 8 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 78 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-7.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS All bearings 14-8-0.
(lb) - Max Horiz 12=217 (LC 7)
Max Uplift All uplift 100 (lb) or less at joint(s) 8 except 9=-136 (LC 6), 10=-150 (LC
10), 11=-369 (LC 10)
Max Grav All reactions 250 (lb) or less at joint(s) 8, 12 except 9=429 (LC 2), 10=407
(LC 2), 11=281 (LC 2)
58 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 6-9=-257/203, 3-11=-250/305
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 4-3-9, Zone2 4-3-9 to 11-6-4, Zone3 11-6-4 to 14-6-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)Gable requires continuous bottom chord bearing.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8 except (jt=lb) 9=136, 10=150,
11=369.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V3Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:29 Page: 1
ID:3jfZL4xy13HCR68xnobqa9ybj03-AkUplUVrPlFVh7hgSkiWXOqn0wOKfkTc?qUcgmyJsFW
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x4 =5x4
=1.5x3 =1.5x3
=3x4
=1.5x3 =2x3
8
7 11
6
1
2
9
10
3
4 5
W1
T1
T2
W2
B1
ST1
1-6-0
-1-6-0
1-9-8
8-4-0
6-6-8
6-6-8
8-4-01-7-64-4-14-4-1Plate Offsets (X, Y):[2:0-2-0,0-1-12]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.61 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.24 Vert(CT) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.12 Horz(CT) 0.00 6 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 40 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)6=128/8-4-0, (min. 0-1-8), 7=353/8-4-0, (min. 0-1-8), 8=262/8-4-0, (min.
0-1-8)
Max Horiz 8=161 (LC 7)
Max Uplift 6=-55 (LC 6), 7=-250 (LC 10), 8=-60 (LC 6)
Max Grav 6=157 (LC 2), 7=393 (LC 2), 8=262 (LC 1)
59 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 3-7=-299/403
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 -1-6-0 to 1-6-0, Zone1 1-6-0 to 2-3-9, Zone2 2-3-9 to 6-6-8, Zone3 6-6-8 to 8-2-4 zone; cantilever left and right
exposed ; end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)Gable requires continuous bottom chord bearing.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members, with BCDL = 10.0psf.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 60 lb uplift at joint 8, 55 lb uplift at joint 6 and 250 lb uplift
at joint 7.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V4Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:30 Page: 1
ID:OP02vUJzKnQdP_zZev5FO?ybixi-fx2BzqWTA2NMIHGt?RDl3cN0bKmqOCPlEUD9CDyJsFV
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=1.5x3
=2x5
=1.5x3 =1.5x3
=3x4
=1.5x3
=1.5x3
7
6
5
1
2 3 4
W1
T1
T2
W2
B1
ST1
3-9-8
8-4-0
4-6-8
4-6-8
0-1-12
0-1-12
8-2-4
8-4-00-9-62-8-12-8-1Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.24 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.15 Vert(TL) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.11 Horiz(TL) 0.00 5 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 32 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (lb/size)5=131/8-4-0, (min. 0-1-8), 6=366/8-4-0, (min. 0-1-8), 7=146/8-4-0, (min.
0-1-8)
Max Horiz 7=93 (LC 10)
Max Uplift 5=-64 (LC 7), 6=-162 (LC 10), 7=-30 (LC 10)
Max Grav 5=141 (LC 24), 6=366 (LC 1), 7=146 (LC 1)
60 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 2-6=-266/365
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-1-12 to 3-1-12, Zone2 3-1-12 to 5-2-4, Zone3 5-2-4 to 8-2-4 zone; cantilever left and right exposed ; end vertical left
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)Gable requires continuous bottom chord bearing.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
7)Bearing at joint(s) 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing
surface.
8)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 30 lb uplift at joint 7, 64 lb uplift at joint 5 and 162 lb uplift
at joint 6.
9)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V5Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:30 Page: 1
ID:hlxhNtOMgwJdl3?vYtjuATybixb-fx2BzqWTA2NMIHGt?RDl3cN6OKnEOCalEUD9CDyJsFV
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x4
=3x4
=3x5 =5x4
1 4
2 3
T1
T2
W1
B1
2-4-6
2-4-6
5-9-8
8-1-14
8-1-141-0-10-0-41-0-1Plate Offsets (X, Y):[3:Edge,0-3-8], [4:0-2-8,0-0-8]
Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.73 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.47 Vert(TL) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.00 Horiz(TL) 0.02 4 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MR Weight: 24 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3.
BOT CHORD Rigid ceiling directly applied or 7-11-15 oc bracing.
REACTIONS (lb/size) 1=321/8-1-14, (min. 0-1-8), 4=321/8-1-14, (min. 0-1-8)
Max Horiz 1=48 (LC 10)
Max Uplift 1=-112 (LC 6), 4=-142 (LC 6)
61 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-705/533, 2-3=-517/422
BOT CHORD 1-4=-550/644
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-10 to 2-5-0, Zone2 2-5-0 to 5-0-12, Zone3 5-0-12 to 8-0-12 zone; cantilever left and right exposed ; end vertical
left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Provide adequate drainage to prevent water ponding.
4)Gable requires continuous bottom chord bearing.
5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 142 lb uplift at joint 4 and 112 lb uplift at joint 1.
8)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V6Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:30 Page: 1
ID:ZWACDERtk9p3DgIgnioqLJybixX-fx2BzqWTA2NMIHGt?RDl3cN_kKiHODGlEUD9CDyJsFV
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x4 =1.5x3 =1.5x3
=3x6
=1.5x3 =1.5x3 =3x6
=1.5x3 =1.5x3
=3x4
7
1
10 9 8
62
3 4 5
T1
T2
T1
B1
ST2
ST1 ST3
0-8-6
0-8-6
0-8-6
15-9-13
3-6-0
9-7-14
5-5-9
6-1-14
5-5-9
15-1-7
15-9-132-7-10-0-42-3-5Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.16 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.15 Vert(TL) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.06 Horiz(TL) 0.00 7 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 53 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except
2-0-0 oc purlins (6-0-0 max.): 3-5.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS All bearings 15-9-13.
(lb) - Max Horiz 1=-64 (LC 11)
Max Uplift All uplift 100 (lb) or less at joint(s) 1, 7, 9 except 8=-181 (LC 11), 10=-167
(LC 10)
Max Grav All reactions 250 (lb) or less at joint(s) 1, 7 except 8=354 (LC 24), 9=271
(LC 1), 10=318 (LC 23)
62 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-3-12 to 3-7-0, Zone2 3-7-0 to 12-5-6, Zone3 12-5-6 to 15-5-6 zone; cantilever left and right exposed ; end vertical
left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed for wind loads in the plane of the truss only.
4)Provide adequate drainage to prevent water ponding.
5)Gable requires continuous bottom chord bearing.
6)Gable studs spaced at 4-0-0 oc.
7)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
9)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 7, 9 except (jt=lb) 10=167, 8=180.
10)Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V7Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:30 Page: 1
ID:_UcmMujEaKgORkUjxooNX4ybj1d-fx2BzqWTA2NMIHGt?RDl3cN7dKnCODNlEUD9CDyJsFV
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
512
=3x4
=5x6
=1.5x3 =3x4
1 3
4
109
2
T1 T1
B1
ST1
5-10-14
5-10-14
5-10-14
11-9-13
11-9-132-5-130-0-4Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.36 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.41 Vert(TL) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.20 Horiz(TL) 0.00 4 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 37 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 8-5-2 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size)1=48/11-9-13, (min. 0-1-8), 3=48/11-9-13, (min. 0-1-8), 4=849/11-9-13,
(min. 0-1-8)
Max Horiz 1=57 (LC 10)
Max Uplift 1=-33 (LC 10), 3=-44 (LC 11), 4=-281 (LC 10)
Max Grav 1=96 (LC 23), 3=96 (LC 24), 4=849 (LC 1)
63 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-9=-413/430, 2-9=-405/497, 2-10=-405/497, 3-10=-413/430
BOT CHORD 1-4=-404/495, 3-4=-404/495
WEBS 2-4=-647/666
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-10 to 3-0-10, Zone2 3-0-10 to 8-10-6, Zone3 8-10-6 to 11-10-6 zone; cantilever left and right exposed ; end
vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Gable requires continuous bottom chord bearing.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 33 lb uplift at joint 1, 44 lb uplift at joint 3 and 281 lb uplift
at joint 4.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V8Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:31 Page: 1
ID:tFrHCFnleZBqwLoVAetJhwybj1Z-fx2BzqWTA2NMIHGt?RDl3cN4QKj9OAAlEUD9CDyJsFV
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.
5 12
=3x4
=5x4
=1.5x3 =3x4
1 3
4
109
2
T1 T1
B1
ST1
3-10-14
3-10-14
3-10-14
7-9-13
7-9-131-7-130-0-4Loading (psf)Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.13 Vert(LL) n/a - n/a 999 MT20 244/190
TCDL 10.0 Lumber DOL 1.25 BC 0.23 Vert(TL) n/a - n/a 999
BCLL 0.0*Rep Stress Incr YES WB 0.14 Horiz(TL) 0.00 4 n/a n/a
BCDL 10.0 Code FRC2023/TPI2014 Matrix-MSH Weight: 24 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or 7-9-13 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
REACTIONS (lb/size)1=69/7-9-13, (min. 0-1-8), 3=69/7-9-13, (min. 0-1-8), 4=487/7-9-13, (min.
0-1-8)
Max Horiz 1=36 (LC 10)
Max Uplift 1=-37 (LC 10), 3=-44 (LC 11), 4=-155 (LC 10)
Max Grav 1=91 (LC 23), 3=91 (LC 24), 4=487 (LC 1)
64 1FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
BOT CHORD 1-4=-190/314, 3-4=-190/314
WEBS 2-4=-340/469
NOTES
1)Unbalanced roof live loads have been considered for this design.
2)Wind: ASCE 7-22; Vult=155mph (3-second gust) Vasd=120mph; TCDL=5.0psf; BCDL=5.0psf; h=35ft; Cat. II; Exp B; Enclosed; MWFRS (envelope)
exterior (2) zone and C-C Zone3 0-0-10 to 3-0-10, Zone2 3-0-10 to 4-10-6, Zone3 4-10-6 to 7-10-6 zone; cantilever left and right exposed ; end vertical
left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Gable requires continuous bottom chord bearing.
4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between
the bottom chord and any other members.
6)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 37 lb uplift at joint 1, 44 lb uplift at joint 3 and 155 lb uplift
at joint 4.
BLUEWAVE BUILDERS INC/STRONG RFJobTrussTruss Type Qty Ply
72435534 1 1V9Truss Job Reference (optional)
UFP Mid Atlantic LLC, 5631 S. NC 62, Burlington, NC, Daniela Chavez Davila Run: 8.81 S Sep 13 2024 Print: 8.810 S Sep 13 2024 MiTek Industries, Inc. Tue Nov 12 18:28:31 Page: 1
ID:DDfAFzqtS5p707gSyBTUOzybj1U-77caAAX5xMVDwRr3Z9k_cpvIpk6D7eLvS8zilfyJsFU
This design is based upon parameters shown, and is for an individual building component to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component
is responsibility of the Building Designer. Building Designer shall verify all design information on this sheet for conformance with conditions and requirements of the specific building and governing
codes and ordinances. Building Designer accepts responsibility for the correctness or accuracy of the design information as it may relate to a specific building. Certification is valid only when truss is
fabricated by a UFPI plant. Bracing shown is for lateral support of truss members only and does not replace erection and permanent bracing. Refer to Building Component Safety Information (BCSI)
for general guidance regarding storage, erection and bracing available from SBCA and Truss Plate Institute.