Loading...
8-11-25 Budget Workshop Agenda City of Atlantic Beach Agenda Budget Workshop Monday, August 11, 2025 - 5:00 p.m. City Hall, Commission Chamber 800 Seminole Road, Atlantic Beach, FL 32233 Page(s) CALL TO ORDER 1. PUBLIC COMMENT 2. TOPICS 2.A. Budget Workshop #5 Presentation Overview Public Utilities Budget Workshop #5 Presentation 3 - 12 ADJOURNMENT This meeting will be live-streamed and videotaped. The video recording will be posted within four business days on the City's website. To access live or recorded videos, visit www.coab.us/live. Any person wishing to speak to the City Commission on any matter at this meeting should submit a request to the City Clerk. For your convenience, forms for this purpose are available at the entrance to the Commission Chamber. In accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing special accommodation to participate in this meeting should contact the City Clerk’s Office by 5:00 PM, the Friday prior to the meeting. Page 1 of 12 Page 2 of 12 CITY OF ATLANTIC BEACH Proposed FY2025-26 Annual Operating Budget Budget Workshop 5 August 11, 2025 1 Agenda Item #2.A.11 Aug 2025Page 3 of 12 Agenda August 11, 2025 Public Utilities August 25, 2025 Final Overview 2 Agenda Item #2.A.11 Aug 2025Page 4 of 12 Public Utilities Public Utilities is responsible for safeguarding public health and the environment by operating and maintaining potable water and wastewater systems in compliance with, or exceeding, local, state, and federal regulations and standards. 3 Agenda Item #2.A.11 Aug 2025Page 5 of 12 Total Expenditures By Division 2025 2026 %Change Water 9,612,588 4,608,199 (52.06) Sewer 11,417,760 8,856,154 (22.44) Total 21,030,348 13,464,353 (35.98%) 4 Agenda Item #2.A.11 Aug 2025Page 6 of 12 Water 2025 2026 % Change Personnel Services 967,720 984,407 1.72 Operating Expenses 1,928,628 2,041,169 5.84 Debt Service 556,240 552,624 (0.65) Capital Outlay 6,160,000 1,030,000 (83.28) Other Uses 345,476 345,476 0.00 Total Expenses $9,612,588 $4,608,199 (52.06%) ➢Increase In Personnel (Increase In Overtime, 401 Contribution, Etc) ➢Increase In Operating Supplies (Meter Boxes and Backflow Preventers) ➢Decrease In Capital Projects 5 Agenda Item #2.A.11 Aug 2025Page 7 of 12 Sewer 2025 2026 % Change Personnel Services 1,525,080 1,688,209 10.70 Operating Expenses 3,108,209 3,147,456 1.26 Debt Service 1,226,005 1,227,024 0.08 Capital Outlay 5,070,030 2,305,030 (48.45) Other Uses 488,435 488,435 0.00 Total Expenses $11,417,760 $8,856,154 (22.44%) ➢Increase In Personnel (Increase In Overtime, FICA, and 401 Contributions) ➢Increase In Professional Services (Engineering Pumping Reuse) ➢Decrease In Capital Projects 6 Agenda Item #2.A.11 Aug 2025Page 8 of 12 Water Well #5 @ WTP2 Video Logging $150,000 500 Gallon Diesel Fuel Tanks WTP1 $70,000 Service Line & Valve Replacements (Various) $100,000 Construct 850 LF of 12” WM Ocean Walk 10” WM to Sherry Drive $160,000 Replace 1,400 LF of 4” PVC West Side of Seminole From Saturiba to 19th $160,000 Construct 2,700 LF of 6” WM in Marsh Oaks Plus Service $220,000 Replace 6” WM With 12” PVC on Sailfish From Cavalla Road Tied To Atlantic Blvd.$170,000 Sewer Infiltration & Inflow Control Assessment & Implementation $250,000 Retrofit High Priority Lift Station Vulnerable t Flooding – TBD $700,000 Septic To Sewer 14 Homes In Marsh Oaks (Begonia, Tulip)Phase I $375,000 Lift Station Influent Line Replacement (3 LS) $50,000 Sewer Collection System Master Plan Update $200,000 New Operations Building With Lab, Locker Room, and Office Area $100,000 7 Included Capital Agenda Item #2.A.11 Aug 2025Page 9 of 12 Sewer Install Pumps In Effluent Pond to Feed Reuse During Low Flows $100,000 Improve Aeration Tanks to Include Integrity Study, New Drains, and Sand Blasting $100,000 Odor Control Assessment and Implementation $200,000 Security Cameras $45,000 Replace Digester Catwalk $185,030 8 Included Capital Agenda Item #2.A.11 Aug 2025Page 10 of 12 Enhancements 1. SB 64 Compliance Design and Construction of Alternate Effluent Disposal $250,000 2. Sandblast Interior of two ground storage tanks at WTP # 1 $500,000 3. Mayport Road Bike Path $130,000 4. Construction Administrative Services – WTP #2 $90,000 5. Construction Administrative Services – WWTP Chlorination/Dichlorination System Improvements $35,000 6. Distribution Operator Trainee $68,447 7. New 100KW Generator to Replace Well 2R Generator $70,000 8. New 1,500 Gallon Diesel Fuel Tank at WTP2 $45,000 9. New Isolation Air Valves on Top of Aeration Tanks $50,000 10. New Isolation Air Valves on Top of Reaeration Tanks $45,000 11. Replace Utilities Truck $47,000 12. Replace Truck P-29 $47,000 13. WTP Replace Well Pump Well5 $50,000 9 Agenda Item #2.A.11 Aug 2025Page 11 of 12 Enhancements 14. New Generator at Atlantic Beach Preserve Lift Station $40,000 15. 2 new 4” Super Pumps for Lift Station $16,600 16. 2 new 4” Super Pumps for Mimosa Cove Lift Station $16,600 17. New Jet/Vacuum Truck (PW and PU) $250,000 18. Replace 8” Isolation Valves In Old Clarifier Pit For Plant Drainage $60,000 19. New Check Valves Mimosa Cove $10,400 20. WTP3 Upsize 8” Main From Pump Room to Assisi Lane to 12”PVC $200,000 21. Design Lab/Operations Building Upgrade $50,000 22. Replace Distribution Truck $70,000 23. New Air Conditioner For Office Lab Building $10,000 24. Replace Mini-Split Air Conditioner For Reclaim Building $10,000 25. Computer Equipment $8,000 10 Agenda Item #2.A.11 Aug 2025Page 12 of 12