49 Ardella Rd. RES25-0162 Site Management Plan49 ARDELLA ROADATLANTIC BEACH, FLORIDA 3223312345REVISIONSREMARKS06/09/2501S..._ _ /_ _ /_ _..._ _ /_ _ /_ _..._ _ /_ _ /_ _..._ _ /_ _ /_ __ _ /_ _ /_ _...TOM TROUT, INC.5569 Bowden Rd.CBC026189Jacksonville, FL 32216 (904) 737-541240.0'70.0'46.0'30.0'19.0'100.0' (PLAT)115.0' (PLAT)115.0' (PLAT)100.0' (PLAT)27.0'45.0'54.0'SLOCUM RENOVATIONONE STORYCMU BLOCKPOSTED # 49LOT 4BLOCK 17LOT 4BLOCK 17LOT 7BLOCK 17SITE MANAGEMENT PLANSCALE: 1 / 8 " = 1 'A/CARDELLA ROADPROPERTY DETAIL RE #: 172059-0000 Property Use: 4893 Warehouse/ Storage # of Buildings: 1 Legal Desc: 17-2S-29E .264 PT GOVT LOT 3 RECD O/R 20575-110819-16 DONNERS REPLATU/R LOTS 5,6 BLK 17 Subdivision: 00000 Section Land Total Area: 11768DUMPSTERP/PSITE PARKING*** NOTE: SITE PLAN CREATED FOR CONSTRUCTION SITE MANAGEMENT PURPOSES ONLY AND NOT TO BE USED FOR SURVEY RELATED PURPOSES ***CONSTRUCTION AREA( INTERIOR ONLY )GENERAL NOTES1.Site Management Plan must be posted on the job site2.Chemical toilets must be kept out of the City right-of-way and not further than 15 feet from structure and the door shall face the structure that is under construction.3.Dumpsters are to have tarp covers or rigid covers on windy days. Dumpsters must be removed prior to issuance of Certificate of Occupancy or Certificate of Completion.4.Contractor must have the entire construction site cleaned by Friday of each week. This means removal of scrap lumber, concrete remnants, and other such construction debris including cans, metal, plastic, and paper.5.Contractor must maintain all elements of the approved Erosion & Sediment Control Plan (silt fence, catch basin filters, etc.) until sod or other stabilization has been placed and approved by Public Works.6. Failure to comply with the Construction Site Management Ordinance may result in a Stop Work Order being issued in accordance with City of Atlantic Beach Code of Ordinances Sec. 6-17 (b)(3).