Loading...
8-25-25 Budget Workshop Agenda City of Atlantic Beach Agenda Budget Workshop Monday, August 25, 2025 - 5:00 p.m. City Hall, Commission Chamber 800 Seminole Road, Atlantic Beach, FL 32233 Page(s) CALL TO ORDER 1. PUBLIC COMMENT 2. TOPICS 2.A. Budget Workshop #6 Presentation Final Overview Budget Workshop #6 Presentation 3 - 18 ADJOURNMENT This meeting will be live-streamed and videotaped. The video recording will be posted within four business days on the City's website. To access live or recorded videos, visit www.coab.us/live. Any person wishing to speak to the City Commission on any matter at this meeting should submit a request to the City Clerk. For your convenience, forms for this purpose are available at the entrance to the Commission Chamber. In accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing special accommodation to participate in this meeting should contact the City Clerk’s prior to the meeting. Page 1 of 18 Page 2 of 18 City Of Atlantic Beach Proposed FY2025-26 Annual Operating Budget Budget Workshop 6 August 25, 2025 Agenda Item #2.A.25 Aug 2025Page 3 of 18 Agenda 2 Overview Items to Consider Agenda Item #2.A.25 Aug 2025Page 4 of 18 Ad Valorem Taxes 3 Current Millage Rate: 2.8410 $8,741,703 Rolled Back Rate: 2.6312 ($645,551) Majority Vote Maximum Millage: 2.7499 ($280,313) Two Thirds Vote Maximum Millage: 3.0249 $565,857 Two Thirds Vote Is Based On Full Membership of Body, Not On Members Present.Agenda Item #2.A.25 Aug 2025Page 5 of 18 Millage Comparison 4 17.4183 17.8680 17.9429 18.5720 19.0771 16.5000 17.0000 17.5000 18.0000 18.5000 19.0000 19.5000 Atlantic Beach City of Jacksonville Neptune Beach Jax Beach Town of Baldwin Agenda Item #2.A.25 Aug 2025Page 6 of 18 Overview-Update 5 Fund FY2025 Original FY2025 Proposed Original vs Proposed % Change General Fund $19,973,370 $20,582,553 3.05% Special Revenue Funds $6,657,962 $7,534,018 13.16% Water Fund $9,958,064 $4,981,738 (49.97%) Sewer Fund $11,417,760 $8,887,281 (22.16%) Sanitation Fund $2,593,240 $2,794,349 7.76% Building Code Fund $728,329 $758,451 4.14% Stormwater Fund $4,463,552 $3,235,030 (27.52%) Pension Funds $2,888,107 $3,155,910 9.27% Total $58,680,384 $51,929,330 (11.50%)Agenda Item #2.A.25 Aug 2025Page 7 of 18 General Fund Expenditures By Department 6 Department FY2025 FY2026 % Change Commission $69,366 $70,729 1.96% City Manager $629,636 $654,903 4.01% City Clerk $404,624 $431,325 6.60% Finance $1,469,373 $1,543,194 5.02% Human Resources $409,542 $451,073 10.14% Planning and Code $620,046 $579,678 (6.51%) Information Technology $1,000,508 $988,700 (1.18%) Public Safety $8,309,505 $8,616,553 3.70% Public Works $3,105,742 $3,231,995 4.07% Cultural Arts & Recreation $531,443 $617,786 16.25% Parks Maintenance 1,356,141 1,841,721 35.81% Beautification 241,082 279,969 16.13%Agenda Item #2.A.25 Aug 2025Page 8 of 18 Capital Projects Fund New ERP System $525,705* Ahern Street East Coast - Sherry $650,000* East Coast Atlantic Blvd. to Ahern Street Drainage Improvements $500,000* Ahern Street Drainage Improvements Flood Enhancement $250,000* Replace Broken Curb and Gutter at Royal Palms $500,000* Frances to Mayport Multiuse Path $90,000* Mayport to George Multiuse Path $216,000* George to Main Multiuse Path $272,000* * Carry Forward Project Sailfish Multiuse Path $330,000* New Walkovers – Locations TBD $140,000* Plaza Reconstruction – Sailfish to Parkside $250,000* Milling and Paving $550,000* Sidewalks Throughout City as Needed $125,000* Beaches Veterans Memorial Park Project $9,500* Ahern Street/Ocean to East Coast Multiuse Path $550,000* 7 Agenda Item #2.A.25 Aug 2025Page 9 of 18 Neighborhoods Park Master Plan 1. Grant Matches $325,000 2. Russell Park Baseball Maintenance $25,000 3. Baseball Light Repairs $65,000 4. Ashby Park Upgrade Play Equipment $45,000 5. Tennis and Baseball Resurfacing $100,000 6. Dutton Island Dead Tree Removal $20,000 7. Johansen Park Refurbish Memorial Planter $11,000 8.Veterans’ Park Bike Racks $10,000 9. Tideview Park Kayak Launch Replacement $40,000 10. Dutton Island Trailhead Wayfinding $15,000 11. New Picnic Cabanas at Splash Pad $10,000 12. Sod Aquatic Dog Park $9,000 8 Agenda Item #2.A.25 Aug 2025Page 10 of 18 Neighborhoods Enhancements 1. Jordan Park Entrance Sign and Enhancements $15,000 2. Improve Dudley Entrance at Donner Park $15,000 3. Dutton Island Install of Surface Edging $20,000 4. Fairway Villas Xeriscaping $10,000 5. Fairway Villas Sign and Entrance Feature $3,000 6. Johansen Park Other Signage $10,000 7. Johansen Park Educational Signage For Trees $8,000 8. America 250 Celebration $20,000 9 Agenda Item #2.A.25 Aug 2025Page 11 of 18 Public Works Capital Improvement Plan Dutton Island park Replace/Rehab Causeway Bridge Sheetpiling $900,000 Donner Park Path and Dudley Entrance Upgrade $115,000 Replace Bull Park Cabana at Mailbox Area $60,000 Tideview Park ADA Access to Sunset Pier $15,000 Aquatic Dog Park – Bulkhead In Pond $90,000 Public Works Garage Shed Shop 22 x 30 $35,000 Russell Park Concession Stand Windows $10,000 Thermoplastic Crosswalks Throughout City $25,000 Beach Access and Preserve Walkway Repairs $10,000 New A/C Units – Locations TBD $20,000 Misc. Professional Engineering Services $10,000 (Admin Division) Misc. Professional Engineering Services $10,000 (Road & Streets Division) 10 Agenda Item #2.A.25 Aug 2025Page 12 of 18 Public Works Enhancements Public Works 1. Building Maintenance Technician $65,200 2. Veterans’ Park Pavilion $50,000 3. Plaza Drive Reconstruction - Sailfish W. to Nautical Blvd. $250,000 4. Replace 6 Bay Barn With Metal 6-Bay Building $300,000 5. Tideviews Boardwalk Refurbishment $100,000 6. Gail Baker Center Decking Repair $60,000 7. Adele Grage Roof Replacement $50,000 8. Sidewalks Throughout City As Needed $125,000 9. New Walkovers – Locations TBD $140,000 10. Jordan Park Angled Parking $30,000 11. CAT SKID STEER With Attachments $70,000 12. Ditch Maintenance $25,000 13. Tile Restrooms at Dutton Island and Donner Park $10,000 14. Jordan Park Parallel Parking $60,000 15. Jordan Roof Replacement $65,000 16. Scorpion II Trailer Attenuator $50,000 17. Ice Machine $5,000 18. Towncenter Street Light Replacement $100,000 Sanitation Storm Debris Removal $50,000 Stormwater Replacement Vac Truck (50% Split with Utilities) $250,000 11 Agenda Item #2.A.25 Aug 2025Page 13 of 18 Public Safety Enhancements 1. Outside Air Unit Replacement $120,000 2. Speed Display Trailer $12,500 12 Agenda Item #2.A.25 Aug 2025Page 14 of 18 Public Utilities Enhancement Carry Forwards Water Chlorine Gas With Hypo-Chlorite at WTP 3 $150,000 Replace Water Services On Seminole Road From Atlantic To The 5-Way $120,000 Phase II of Sherry Drive WM Extension to Navy Base Fence $1,435,000 Sewer Retrofit High Priority L/S - Due to Flooding at Cavalla L/S $400,000 13 Agenda Item #2.A.25 Aug 2025Page 15 of 18 Public Utilities Enhancements 1. SB 64 Compliance Design and Construction of Alternate Effluent Disposal $250,000 2. City Works Software/Annual License $150,000/$30,000 3. Sandblast Interior of two ground storage tanks at WTP # 1 $500,000 4. Mayport Road Bike Path $130,000 5. Construction Administrative Services – WTP #2 $90,000 6. Construction Administrative Services – WWTP Chlorination/Dichlorination System Improvements $35,000 7. Distribution Operator Trainee $68,447 8. New 100KW Generator to Replace Well 2R Generator $70,000 9. New 1,500 Gallon Diesel Fuel Tank at WTP2 $45,000 10. New Isolation Air Valves on Top of Aeration Tanks $50,000 11. New Isolation Air Valves on Top of Reaeration Tanks $45,000 12. Replace Utilities Truck $47,000 13. Replace Truck P-29 $47,000 14.WTP Replace Well Pump Well5 $50,000 14 Agenda Item #2.A.25 Aug 2025Page 16 of 18 Public Utilities Enhancements 15. New Generator at Atlantic Beach Preserve Lift Station $40,000 16. 2 new 4” Super Pumps for Lift Station $16,600 17. 2 new 4” Super Pumps for Mimosa Cove Lift Station $16,600 18. New Jet/Vacuum Truck (PW and PU) $250,000 19. Replace 8” Isolation Valves In Old Clarifier Pit For Plant Drainage $60,000 20. New Check Valves Mimosa Cove $10,400 21. WTP3 Upsize 8” Main From Pump Room to Assisi Lane to 12”PVC $200,000 22. Design Lab/Operations Building Upgrade $50,000 23. Replace Distribution Truck $70,000 24. New Air Conditioner For Office Lab Building $10,000 25. Replace Mini-Split Air Conditioner For Reclaim Building $10,000 26. Computer Equipment $8,000 15 Agenda Item #2.A.25 Aug 2025Page 17 of 18 Commission Enhancements Dog Park Upgrades (Neighborhoods) $10,000 City Works Software/Annual License (Public Utilities) $150,000/$30,000 Donner Park Baseball Field Upgrades - LED Lighting Conversion (Public Works) $35,000 Arborist (Neighborhoods) $74,250 16 Agenda Item #2.A.25 Aug 2025Page 18 of 18