HomeMy WebLinkAbout8-25-26 CDB Adopted MinutesMINUTES
Community Development Board (CDB) Meeting
Tuesday, August 25, 2026 - 6:00 PM
City Hall, Commission Chamber
800 Seminole Road, Atlantic Beach, FL 32233
Present: Doug Moody, Member
Kirk Hansen, Chair
Rick Ferrin, Member
Jeff Haynie, Member
Absent: Gregory (Greg) Beliles, Member
Richard Arthur, Member
Ellen Golombek, Vice Chair
Also Present: Amanda Askew, Neighborhoods Department Dir. (NDD)
Valerie Jones, Recording Clerk
Payton Jamieson, Principal Planner (PP)
Rob Graham, City Attorney (CA)
1. CALL TO ORDER AND ROLL CALL
2. APPROVAL OF MINUTES
A. Approve minutes of the July 21, 2026 regular meeting of the Community
Development Board.
MOTION. To APPROVE the minutes of the July 21, 2026 regular meeting of the Community
Development Board.
Motion: Jeff Haynie
Second. Rick Ferrin
Motion passed 4 to 0.
3. OLD BUSINESS
There was no old business.
4. NEW BUSINESS
A. 650 Sherry Drive ZVAR26-0014 (Ian Brown)
Request for a variance to Section 24-89 (d) for floodplain storage and Section 24-89 (c)
for compensatory storage (stormwater storage).
Staff Presentation
Environmental Planner and Coordinator Payton Jamieson presented the staff report for
650 Sherry Drive, a request for variance from Sections 24-89(d) and 24-89(c), pertaining
Community Development Board (CDB)
August 25, 2026
to floodplain and stormwater (compensatory) storage requirements, respectively. Planner
Jamieson explained that the property is located west of Sherry Drive, adjacent to Howell
Park, with Sherman's Creek to the north. The lot is zoned RS -2 (Residential Single
Family), is a platted lot of record measuring 50 feet wide by 100 feet deep (5,000 square
feet), and does not meet the standard RS -2 lot width requirement of 70 feet. The property
is predominantly located within the riverine floodplain, classified as Zone A on FEMA
flood maps. The application arose through a 2026 building permit plan review, during
which Public Works flagged the compensatory storage deficiencies.
Planner Jamieson explained Section 24-89(c) addresses stormwater storage, which is
triggered when a lot's impervious coverage exceeds 35 percent. Section 24-89(d)
addresses floodplain storage, which is required whenever fill is placed within a FEMA
Special Flood Hazard Area, resulting in a net loss of natural floodplain storage. Taken
together, these requirements produce the total compensatory storage obligation. The
storage must be located at least one foot above the estimated seasonal high water table,
achieved through excavation and grading of the lot.
For this specific property, the applicant's proposed lot coverage is 45 percent, which
exceeds the 35 percent threshold and triggers stormwater storage. Additionally, the
applicant indicated plans to bring fill onto the property to raise the existing grade from
approximately 4.4-4.8 feet to a proposed elevation of 6 feet, which triggers the
floodplain storage requirement. Public Works calculated the stormwater-only storage
requirement at approximately 1,604 cubic feet. The fill -related floodplain component
would add further to that obligation, but would require signed and sealed engineering
plans to quantify precisely. Planner Jamieson noted that the applicant's submitted plans
showed only approximately 330 cubic feet of proposed storage in the driveway area, and
that no soil boring report had been provided to verify the depth of the estimated seasonal
high water table.
Planner Jamieson read from an email provided by the city's Public Works inspector,
Angela, which summarized the inherent circularity of the site's stormwater problem: the
lot's historical drainage flows toward the rear and into the park; changing the lot grade
to create retention would raise it above neighboring properties; any fill brought in to
create stormwater storage in the floodplain simultaneously increases the compensatory
floodplain storage requirement. The email further noted that the only viable location for
retention appeared to be the front yard, which could theoretically provide approximately
807 cubic feet of storage at one foot of depth — though without a boring report, staff
could not confirm whether that excavation depth was achievable above the seasonal high
water table. Planner Jamieson concluded that a variance is needed, and noted that
because this property sits within the riverine floodplain (east of Mayport Road) rather
than the intracoastal waterway floodplain, it would continue to require CDB review
regardless of proposed changes to floodplain ordinance language. Three options were
presented to the Board: approve, approve with conditions (requiring front -yard
compensatory storage of approximately 807 cubic feet), or deny and require the applicant
to rework the site plan.
Community Development Board (CDB)
August 25, 2026
Board Questions
Moody asked to confirm the storage figures: the 1,604 cubic feet applied to stormwater
only, and that figure would likely increase once floodplain storage was added based on
engineering calculations. Planner Jamieson confirmed this. Moody then asked whether
the 807 cubic feet figure for front -yard storage was reliable. Planner Jamieson explained
it was a mathematical estimate by Public Works based on a one -foot excavation depth,
consistent with what has been achievable on surrounding properties, but cautioned that
the absent boring report made it unverifiable.
Moody asked whether it was customary to proceed without a boring report. Planner
Jamieson explained that the plan was flagged and denied during review partly because
of the absence of the boring report, which is the mechanism used to verify the seasonal
high water table depth.
Ferrin observed that the lot coverage ratio of 45 percent is what triggers the 1,604 -cubic -
foot stormwater requirement, and that the additional fill to bring the lot from
approximately 4.8 to 6 feet would trigger a further floodplain storage obligation —
potentially doubling the total requirement - while the maximum achievable front -yard
storage, even under optimistic assumptions about the water table, is only 807 cubic feet.
Planner Jamieson confirmed this analysis and noted that even fill associated with pilings
on typical floodplain properties generates some floodplain compensatory storage
obligation.
Haynie confirmed that there is no existing pool on the property, and that the pool shown
is part of the proposed new construction. He asked whether the city had discussed with
the applicant whether the 807 -cubic -foot front -yard storage option was feasible. Planner
Jamieson suggested deferring that question to the applicant. Haynie then asked whether,
in the city's view, it was even possible to comply with the full requirements on this site
plan. Planner Jamieson stated plainly that while some storage could be placed in the front
yard, it would not satisfy the full code requirement.
Applicant Presentation
Ian Brown, appearing on behalf of the property owners, provided a detailed presentation
characterizing the site as "truly atypical." He noted that the property currently contains
a 1970s -era dwelling in a state of significant deferred maintenance, and that with the
home's existing finished floor elevation (FFE) of approximately 7.8 feet falling well
below the required minimum FFE of 9.5 feet for this flood zone, any renovation
exceeding 50 percent of the structure's assessed value of approximately $280,000 would
trigger the FFE compliance requirement, effectively necessitating demolition and new
construction.
Brown described what he termed a "storage squeeze": the site is too low and too wet to
excavate for stormwater storage, and too encumbered by the floodplain to add fill
without triggering additional compensatory storage obligations. He explained the
circular logic as follows — to go down and excavate for storage, the applicant hits
groundwater; the soil borings, which had been submitted to planning and public works
Community Development Board (CDB)
August 25, 2026
but may not have been in the presenter's materials, show a seasonal high water table at
only 1.5 feet below existing grade. With a required one -foot buffer between the bottom
of any retention facility and the water table, only six inches of effective excavation depth
is achievable, reducing the potential front -yard storage to roughly half of the 807 -cubic -
foot estimate. Conversely, to go up with fill in order to create above -grade bermed
storage is also not viable because (a) every cubic foot of fill in the FEMA floodplain
increases the compensatory floodplain storage requirement in a self -reinforcing loop,
and (b) raising the grade above neighboring properties could constitute tortious flooding
of adjacent properties.
Brown identified a small triangular area outside the FEMA flood zone in the front -left
corner of the lot as the only location where any meaningful storage could be placed
without generating additional compensatory requirements, but emphasized that even
there, the shallow water table limits what is achievable. He characterized this as a platted
lot of record rendered effectively unbuildable by post -platting legislation — in his words,
"classic after enacted legislation putting an undue burden hardship on a platted lot of
record." He argued that the applicant meets at least several of the six variance approval
criteria under Section 24-65(f), including exceptional topographic conditions, disparate
surrounding conditions, exceptional circumstances preventing reasonable use, and
regulations enacted after platting. He stated that the owner is not seeking any relief from
setbacks or coverage requirements — only from the compensatory storage obligation —
and that the footprint proposed is consistent with what any RS -2 lot of this shape and
size could otherwise support.
Brown acknowledged that approval with conditions — placing whatever storage can be
physically accommodated into the triangular front corner — would be acceptable to the
owner, even if that amount is modest. He cautioned that denial without some relief could
render the lot legally unbuildable, which he suggested could give rise to an inverse
condemnation claim.
Paul Zobouni, identified as the builder (Blue Wave Builders), spoke briefly to confirm
that every effort had been made to comply, that Public Works had personally advised
seeking a variance as the only viable path forward, and that the team had no history of
circumventing retention requirements on any of their many previous Atlantic Beach
projects.
Public Comment
The Chair opened the courtesy of the floor.
John Flynn disagreed with characterizing the lot as nonstandard, noting that 50 -foot lots
are common in Atlantic Beach and have been built upon without difficulty. He expressed
concern that granting the variance would set a dangerous precedent for an estimated 11
other lots in similar conditions on the same side of Sherry Drive. He calculated that a
footprint reduced to 35 percent lot coverage — approximately 1,750 square feet — could
be built to two or three stories to achieve adequate living space without exceeding the
impervious threshold, and noted that there are already homes on stilts along Sherman's
Creek.
Community Development Board (CDB)
August 25, 2026
Suzanne Barker requested denial of the variance, arguing that all Atlantic Beach property
owners are held to stormwater retention requirements and the applicant should be no
exception. She acknowledged sympathy for the buyers but suggested they had purchased
the property with knowledge of its characteristics.
Marisa Carbone expressed concern about precedent, characterizing Sherry Drive as
uniformly low-lying and potentially wet, and warned that approval could generate many
more similar requests. She also raised the possibility that the property could be flipped
to another developer who would not share the current applicants' restraint.
Sarah Boren asked whether any analysis had been performed regarding the downstream
impact on Howell Park of having no on-site stormwater or floodplain storage — where
the water from the redeveloped lot would in fact go.
Brian Vonn raised the issue of flood insurance rates and questioned how expanding a
property's footprint below minimum code elevation would affect community -wide
insurance costs.
Lisa Harold of the property across the street testified that she had lived in the
neighborhood for over 30 years and confirmed the lot has always been low, wet, and 50 -
by -100. She urged the Board not to set a dangerous precedent and noted that the out-of-
town buyers had the property available for purchase for approximately a year before
acquiring it.
Elizabeth Rozas expressed an asymmetry in the analysis: the environmental and
precedent -setting risks of approval appeared significant, while the argument in favor
appeared to be primarily a desire for a larger house.
Ian Brown was permitted a rebuttal. He acknowledged the audience's concerns but
argued that the "slippery slope" concern was less applicable here than it might be
elsewhere, because the yellow flood zone on the FEMA map makes it visually apparent
which properties face the same constraints. He reiterated that the lot is a platted lot of
record and that, in his view, denying all relief could constitute an unbuildable condition
for a legally established parcel, with potential legal consequences for the city.
Board Discussion
Moody asked Director Askew whether a smaller footprint — at or below 35 percent lot
coverage — would meaningfully reduce the compensatory storage problem. Director
Askew confirmed that reducing the footprint would reduce the stormwater component,
but that floodplain storage would still be triggered by any fill associated with achieving
the required FFE, whether through a stem wall or pilings. She noted that any fill in any
portion of the yellow FEMA -mapped area generates the obligation. Moody asked
whether denial with an invitation to return with a revised smaller -footprint plan would
be beneficial. Director Askew confirmed that the Board could also defer the matter.
Ferrin explored the scenario of a stem wall or piling foundation that brings the home to
the required FFE without raising the overall lot grade, asking whether the only
Community Development Board (CDB)
August 25, 2026
compensatory storage required would then be for the volume displaced by the structural
elements. Director Askew confirmed that this was essentially correct.
Haynie stated he was inclined against approval, reasoning that while unique
circumstances exist, he was not convinced they are unique to this particular lot versus
the broader street. He was troubled that only one plan had been presented — one seeking
a larger house and pool — rather than alternative designs exploring reduced coverage.
He cited the variance ordinance's prohibition on granting relief for situations created by
the owner's own choices and suggested the applicant was limiting its own options.
However, he was sensitive to the fact that denial would preclude the applicant from
returning for one year, which he acknowledged made the decision more consequential.
Chair Hansen stated that the city engineer had not signed off on the proposal as being
sound, and expressed concern about waiving requirements given existing flooding
conditions in the broader area of old Atlantic Beach. He indicated he was not prepared
to approve a variance without engineering endorsement.
Moody expressed the board's need to be cautious about approving construction that
would exacerbate flooding, noting that he had personally walked the adjacent park and
observed that the boardwalk immediately behind the property was one of the lowest and
wettest points on the path. He agreed with concerns about precedent but indicated he
would be willing to hear a revised plan from the applicant.
At this point, the applicant requested a deferral to allow an opportunity to revise the plans
and present alternatives.
MOTION. To DEFER ZVAR26-0014.
Motion: Rick Ferrin
Second. Doug Moody
Motion passed 4 to 0.
B. 1337 Estrela Lane ZVAR26-0015 (Lane Strumlauf)
Request for a variance to Section 24-151(e)(2) for required accessory structure side yard
setbacks to construct a screen enclosure.
Staff Presentation
Director Askew presented this item. The property is located at the terminus of a private
cul-de-sac, Estrela Lane, on the east side of the roadway and is the northernmost home
in a small subdivision. It is zoned RS -1 (Residential Single Family) and is a newly
constructed home approaching a certificate of occupancy. A substantial portion of the
subdivision, including the rear of the subject property, lies within a conservation
easement and buffer area adjacent to Sherman's Creek.
The applicant constructed a pool permitted to be within five feet of the side property line,
which is the allowable setback for accessory structures. Subsequently, the applicant
Community Development Board (CDB)
August 25, 2026
sought to enclose the pool with a screen enclosure. Because the pool's edge and the
surrounding pavers are already at the five-foot minimum setback, the screen enclosure
structure itself would encroach into the required setback. The request is for a variance to
allow the screen enclosure to be constructed within three feet of the side yard- a two -foot
reduction from the required five feet.
Director Askew reminded the Board that approval requires finding that one or more of
the six criteria in Section 24-65(f) are met.
Applicant Presentation
Homeowner Melissa Strumlauf appeared and introduced their contractor, Ryan Pahlow
of Coastal Oaks Construction, spoke on the project's behalf. Pahlow explained that the
pool's location between the house foundation and the buildable area was constrained by
pier footings for the roofline of an adjacent outdoor living walkway, and that the angle
of structural repose around those footings pushed the pool toward the south property line.
The screen enclosure as currently configured would sit almost directly on the waterline
of the pool's south edge, leaving no room for egress. The request to extend the enclosure
two additional feet into the setback is specifically to provide a deck area along the south
side that would allow safe egress from the pool in an emergency. Pahlow also noted that
the property's rear is entirely wooded, making an unscreened pool area impractical.
Board Discussion
Haynie asked directly why the screen enclosure was not incorporated into the original
construction plans. Pahlow acknowledged the question as fair, attributing the oversight
to the complexity of fitting the pool into the constrained geometry of the lot —
particularly given the pier footings — and the assumption that an enclosure would fit
within allowable limits. Moody echoed this concern, stating that if the intent was always
to have a covered lanai, the pool should have been designed two to three feet narrower
to accommodate the enclosure within the required setback. He expressed sympathy but
characterized the situation as a design flaw rather than a qualifying hardship.
Ferrin agreed that, reviewing the six criteria under Section 24-65(f), none appeared
applicable to this case. Chair Hansen noted that one possible argument could be made
under the criterion regarding chronic conditions or circumstances impacting the property
disparately, given that the buildable area of the lot is compressed by the conservation
easement in the rear — though he acknowledged this was a stretch. No member found
compelling grounds for approval.
MOTION: To DENY ZVAR26-0015 on the basis that none of the grounds for approval were
applicable.
Motion: Jeff Haynie
Second: Rick Ferrin
Motion passed 4 to 0.
Community Development Board (CDB)
August 25, 2026
C. 1415 Ocean Boulevard ZVAR26-0016 (Caroline Davis)
Request for a variance to Section 24-151(e) for allowable maximum size of an accessory
structure to construct a 210 sq. ft. covered pavilion.
Staff Presentation
Planner Jamieson presented this item. The property is located on the northeast corner of
Ocean Boulevard and 14th Street, zoned RS -2, and is the subject of active renovations
including a new garage addition and driveway improvements. The variance request
concerns the construction of a 210 -square -foot detached open-air pavilion. Section 24-
151(e)(5) limits accessory structures to 160 square feet. The applicant seeks to exceed
that limit by 50 square feet. Planner Jamieson clarified that no setback issues are
implicated — the request is solely about the square footage cap.
Moody asked whether attaching the pavilion to the garage (which is attached to the
house) would remove the square footage limitation. Planner Jamieson explained that if
the roof lines were connected, the pavilion would become part of the primary structure's
footprint and the 160 -square -foot accessory structure limitation would no longer apply;
however, the structure would then need to meet primary structure setbacks for the RS -2
district rather than accessory structure setbacks. Applicant Caroline Davis subsequently
clarified that attaching the structure had been explored but was not feasible due to the
required 20 -foot rear setback from what is treated as the front of the house on 14th Street.
Applicant Presentation
Homeowner Caroline Davis explained that the family purchased the property in 2008
and has been invested in maintaining it as a traditional Atlantic Beach home. The impetus
for the current project was the construction of a new garage — the home previously had
none, which the family with two sons found untenable. The garage construction
displaced the existing outdoor living space, which had measured approximately 359
square feet. The 210 -square -foot open-air pavilion is, she noted, already smaller than the
outdoor space they are losing.
Davis made the point that felt counterintuitive to the family: if the applicants were
willing to enclose the structure with walls, they could build a pool house of up to 600
square feet, up to 25 feet high, without any variance. They are instead seeking a smaller,
open-air, lower -impact structure that they believe is more in keeping with Atlantic
Beach's character. She framed this as the more responsible choice for the neighborhood.
Photos of the property, showing its modest, well-maintained character and the modest
scale of the proposed pavilion, were displayed for the Board.
Two members of the public spoke in support of the application. A neighbor, Mike
Mesiano of 1375 Ocean Boulevard, acknowledged that he had encouraged the Davis
family to stay in Atlantic Beach despite the challenges of no garage and a growing
family, and vouched for them as model neighbors who had consistently improved the
property in a character -appropriate way. Ryan Rickols of 1450 Ocean Boulevard, who
had previously constructed a 210 -square -foot enclosed pool house across the street,
observed that the 160 -square -foot cap for open, unenclosed structures seemed arbitrary
when an enclosed structure of greater size could be built without a variance at all. A
Community Development Board (CDB)
August 25, 2026
contractor from Magnolia Lane Builders also spoke, reiterating the point that the
variance being requested would actually result in a less impactful structure than what the
applicants could construct by right if they enclosed it.
Board Discussion
Haynie stated he would like to approve the request but could not identify applicable
grounds under Section 24-65(f). He characterized the 50 additional square feet as a
matter of preference and convenience rather than a unique, unworkable condition of the
property.
Ferrin observed that the criterion regarding surrounding conditions impacting the
property disparately from nearby properties, as cited by the applicant, did not appear to
cleanly fit but acknowledged the commonsense argument that the 160 -square -foot cap
may be somewhat arbitrary in this context.
Chair Hansen was candid about his internal conflict: "I want to do something that makes
sense, yet I don't want us to open the code up and say, now it's open season." He
expressed personal admiration for the proposed structure while acknowledging the
institutional risk of approving on thin grounds.
Moody asked whether the Board could locate a more applicable criterion among the six.
Director Askew explained that the 160 -square -foot limit historically derives from shed -
sizing standards — it corresponds to a standard prefabricated shed available from major
retailers — and serves to limit the scale of ancillary structures relative to primary uses.
The Board's discussion remained candid about the tension between the merits of the
specific request and the lack of clear grounds for granting a variance.
MOTION. To APPROVE ZVAR26-0016 based on finding that surrounding conditions
and circumstances impact the property disparately from nearby properties.
Motion: Doug Moody
Second. Rick Ferrin
Doug Moody (Moved By) For
Kirk Hansen For
Rick Ferrin (Seconded By) For
Jeff Haynie Against
Motion passed 3 to 1.
D. 740 Sherry Drive ZVAR26-0017 (Mako Development)
Request for a variance to Section 23-33 of code for required for doubled tree mitigation
after the fact.
Community Development Board (CDB)
August 25, 2026
Staff Presentation
Director Askew presented this item, noting that it falls under the board's jurisdiction to
hear variance requests under Chapter 23 (Vegetative and Tree Code), specifically
Section 23-51(d). The subject property at 740 Sherry Drive is a newly constructed home
on what was formerly a single parcel that was split into two lots (the other being 760
Sherry Drive), both now under separate new construction. Addressing issues had
Director Askew emphasize the legal description of the lot. She noted that because of
addressing issues the variance should reference the legal description.
Director Askew provided a detailed chronological account of the history:
• A courtesy pre -permit site inspection was conducted by a former staff member
to identify trees on the property.
• In March 2025, a tree removal permit application was submitted concurrently
with the new home permit application. Both were deemed incomplete due to
missing information.
• Staff worked with the applicant to revise the tree permit application but noted
that a required initial barricade inspection was never scheduled. Without that
inspection — which allows staff to verify in the field that flagged trees match the
application — the permit cannot be formally issued.
• A building permit was issued on April 25, 2025.
• In August 2025, tree removal commenced while the tree permit remained
incomplete and unissued.
• The applicant has indicated a belief that the tree permit was issued when the
building permit was issued.
• Under Section 23-51(d)(2), staff issued an enforcement finding of unpermitted
tree removal and applied the double mitigation penalty.
• The applicant appealed staffs interpretation of double mitigation to the
Environmental Stewardship Committee's tree subcommittee in September 2025.
The subcommittee upheld staffs interpretation.
• Tonight's hearing is on the applicant's request for a variance to reduce the
required mitigation.
Director Askew explained the mitigation calculations in detail. Under the new
construction category, trees of 14 to 30 inches diameter at breast height (DBH) carry a
1:2 mitigation ratio — one inch removed requires two inches replaced. Total removed
DBH was 64 inches; after applying preservation credits for trees retained on-site, the
standard (non -doubled) mitigation obligation is 48 inches DBH. Applying the double
mitigation penalty for unpermitted removal produces a required mitigation of 310 inches
DBH. The applicant is proposing to plant 108 inches DBH on-site, including 36 inches
of maritime hardwood species — more than the 48 -inch standard obligation but far less
than the 310 -inch doubled obligation. Director Askew noted that the variance grounds
available under Chapter 23 are distinct from those under Section 24-65: the Board must
find one of only four specific conditions, including existing topographic elevation
changes that would result in planted materials being unlikely to survive.
Community Development Board (CDB)
August 25, 2026
Applicant Presentation
Ben Lavarias, representing both the property owner Ultera Group and contractor Mako
Development, provided the applicant's account. He explained that the owner had walked
the property with a then -city staff member early in the process, believing this constituted
a preliminary tree identification inspection. Time elapsed before construction began, and
when the applications were filed — for both the tree permit and the building permit —
the release of the building permit was assumed to confirm that all approvals, including
the tree permit, were in place. Lavarias acknowledged that the critical missing step was
a phone call to schedule the barricade inspection, characterizing it as a clerical oversight
rather than a deliberate circumvention.
He stated that the primary trees removed were large trees directly within the building
footprint, with only a few ancillary palm trees removed due to overhang conflicts. He
emphasized that the double -mitigation penalty — which he estimated at approximately
$23,000 in tree fund payments or equivalent planting — felt disproportionate to the
nature of the offense, particularly given that the city's concurrent building -and -tree
permitting process created a structural ambiguity. He noted that the city has since
changed its process to require tree permit issuance before building permits are released,
which he argued is itself evidence of a procedural gap that contributed to the confusion.
Lavarias argued that 310 inches of DBH replacement would be physically impossible to
plant on the property in a way that would allow any of the trees to thrive — the landscape
architect had advised that planting more than 108 inches would result in overcrowding
that would kill the trees. He cited the first approval criterion regarding topographic and
site conditions preventing planted materials from surviving as grounds for reducing the
required mitigation to 108 inches, with no additional monetary payment.
Chris Malone, identified as the property owner who personally walked the site and was
present during flagging, corroborated Lavarias's account. He stated that flagged trees
were diseased, dying, or broken in most cases, and that a $125 permit fee had not been
paid — not because of any desire to circumvent the process, but due to an oversight in
the midst of coordinating a complex construction project. He stated he would never have
taken a 20,000 -dollar risk to save $125.
Public Comment
Marisa Carbone, a neighbor across the street who witnessed the construction, offered a
starkly different account: she alleged that the developer had proceeded with tree removal
as soon as funding was available, without regard for the permit process, and that
overbuild on the lot had left no room for mitigation planting because a pool was planned
for the rear yard. She argued that ignorance of the rules is not a defense.
Suzanne Barker argued that other property owners who have removed trees without a
permit have been required to pay the mitigation fees, and that this applicant should not
receive special treatment. She characterized Atlantic Beach as a "Tree City" with strong
community values around canopy preservation.
Community Development Board (CDB)
August 25, 2026
Sarah Boren of 388 8th Street, who also serves on the Environmental Stewardship
Committee, offered a nuanced perspective. She acknowledged that the applicant's
account sounded consistent with an honest mistake, noting that the tree permit
application does require a signature affirming that the applicant has read and understands
the process. She observed that the lot had previously been a single-family property with
a well-known long-time resident, and that the community was braced for significant tree
loss upon development. She raised an additional concern about whether clearing had
occurred beyond the silt fence boundary, potentially into the upland buffers associated
with the wetlands on the southern portion of the property.
Steve Fouraker of 6th Street spoke briefly, directing his remarks to other members of the
public rather than the Board. He noted that the CDB functions as a quasi-judicial body
and makes decisions based on the law as written, not on what may feel appropriate, and
encouraged confidence in the process.
Board Discussion
Haynie described himself as torn, calling the penalty "extreme" on its face while also
acknowledging the difficulty of assessing motives from the dais. He was sympathetic to
the innocent -mistake argument but struggled to map that sympathy onto the specific
approval criteria available under Chapter 23.
Moody observed that the city's own concurrent permitting process — which allowed a
building permit to be issued while the tree permit was still incomplete — appeared to
have contributed to the applicant's confusion, and that the city had since corrected that
process, which he viewed as an implicit acknowledgment of the gap. He noted, however,
that the Chapter 23 variance criteria do not expressly address procedural mitigating
circumstances.
Ferrin observed that while the situation was sympathetic, none of the four Chapter 23
criteria clearly applied. He nonetheless raised the question of whether the 310 -inch
obligation — and the associated financial penalty — was truly commensurate with what
was described as a single missed phone call and inspection scheduling failure. He and
Moody discussed whether a prior referral to the Environmental Stewardship Committee
had produced any recommendation for reduction; Director Askew clarified that the
ESC's jurisdiction extends only to affirming or reversing staffs legal interpretation of
the code, not to granting relief — only the CDB can provide relief.
Haynie ultimately identified a potential path: the first Chapter 23 criterion — "existing
topographic elevation changes that would result in the likelihood that preserved or
planted materials would not survive" — could be read, somewhat broadly, to encompass
the physical impossibility of planting 310 inches of DBH on the lot without the
overcrowding killing the vegetation. He proposed that the Board approve a lesser
variance, reducing the required mitigation to the 108 inches the applicant proposed to
plant, with no additional monetary payment, on the basis of that criterion.
MOTION: To APPROVE ZVAR26-0017 based upon existing topographic and site elevation
conditions that would result in the likelihood that planted materials would not survive if planted
at the doubled volume
Community Development Board (CDB)
August 25, 2026
Motion: Jeff Haynie
Second. Doug Moody
Motion passed 4 to 0.
E. 1261 Gladiola Street ZVAR26-0018 (Beth Viol!)
Request for a variance to Section 24-89 (d) for floodplain storage and Section 24-89 (c)
for compensatory storage (stormwater storage).
Staff Presentation
Environmental Planner and Coordinator Planner Jamieson presented this case,
describing it as similar in legal structure to Item 4.A but factually distinct in several
important respects. The property at 1261 Gladiola Street is located directly adjacent to
the Intracoastal Waterway (ICW) floodplain — to the west of Mayport Road — and falls
within the Limit of Moderate Wave Action (LIMWA), a FEMA designation that requires
homes to be built on stilts and imposes additional structural requirements. There is a tidal
ditch toward the rear. The property is zoned RS -2 and is entirely located within the ICW
floodplain, Zone AE on FEMA maps.
Planner Jamieson explained that this case originated from a 2024 new single-family
home permit. Unlike Item 4.A, the plans in this case were approved during plan review,
the house has already been built on stilts as required by LIMWA, and the variance
request represents the final compliance item blocking a Public Works final approval and
certificate of occupancy (CO).
The same dual triggers apply: the lot coverage of 35.36 percent —just barely over the
35 percent threshold — triggers stormwater storage, and the fill associated with the
elevated foundation (pilings) and a required elevated septic drain field triggers floodplain
storage. The original approved plans showed compensatory storage to be provided
underneath the elevated house. However, when the builder attempted to excavate for that
storage area, groundwater was encountered at only six inches below existing grade —
far shallower than anticipated — making it physically impossible to achieve the required
one -foot separation above the seasonal high water table. Staff confirmed that the original
plan approval was likely in error, as groundwater conditions should have been assessed
prior to approval.
Planner Jamieson read at length from an email by Public Works Engineer Angela, which
unequivocally stated: "I believe the site's existing conditions create a situation where
strict compliance with Section 24-89 is not physically achievable." Angela further noted
that constructing a retention system in these conditions would be unlikely to function as
intended because the storage area would remain saturated by groundwater and thus
unable to provide detention volume during storm events. She recommended pursuing a
variance and eliminating the on-site retention requirement for the project. Building
Official Gideon had been asked to weigh in and concurred, noting that an open pond
beneath the elevated house — even if achievable — would create long-term moisture
and structural concerns for the home.
Community Development Board (CDB)
August 25, 2026
Planner Jamieson noted a key distinction from Item 4.A: because this property is located
directly on the ICW rather than in the riverine floodplain, it would not need to come
before the CDB for floodplain storage under a proposed floodplain ordinance update
currently being considered — though that update would not affect the stormwater
component. Three options were presented: approve (no compensatory storage required),
approve with conditions (requiring storage that does not conflict with the one -foot
groundwater separation requirement), or deny (resulting in no CO being issued for the
already -completed home).
Board Questions
Moody asked whether boring reports or soil testing had been required before the original
plan was approved. Planner Jamieson confirmed that no such testing had been required
or obtained at the time of the plan approval, and that this was a contributing factor to the
oversight. Moody noted that when pilings were being driven, groundwater should have
been apparent immediately and questioned whether that should have triggered an earlier
flag.
Haynie asked a series of clarifying questions to establish that the stormwater retention
(triggered by slightly exceeding 35 percent coverage) and the floodplain compensation
(triggered by fill from the pilings and septic drain field) were both encompassed in the
originally approved under -house drainage plan, and that everything the builder
constructed was permitted and approved at the time of construction. Planner Jamieson
confirmed this. Ferrin summarized the sequence: the plan was approved with the under -
house storage solution; the permit was issued; the house was built; only upon beginning
the excavation for the storage area did the shallow groundwater reveal that the approved
plan was unachievable. Planner Jamieson confirmed that summary.
Haynie sought clarification on the proposed ordinance update: if it were adopted, this
property's floodplain storage obligation would be eliminated by rule, though the
stormwater component (triggered by the marginal 35.36 percent coverage) would
remain. Even that residual stormwater component could not be satisfied given the
groundwater conditions.
Applicant Presentation
Beth Violi, representing Colour Homes (the contractor), and the homeowners, the
Johnsons, spoke briefly. She described the extensive effort and expense the firm had
expended in hiring multiple civil engineers to attempt compliance, and confirmed that
the variance was sought only after those efforts failed and the city itself concluded that
compliance was not physically achievable. She stated that Color Homes is committed to
environmental stewardship and would not have come before the Board had there been
any viable path to compliance.
Public Comment
Brian Vonn of 1209 West Plaza, who lives on the east side of the tidal creek that borders
the property, spoke at length. He stated that residents of the Gladiola Street area are well
Community Development Board (CDB)
August 25, 2026
aware of the extreme water table conditions — the city has installed "Street Floods"
warning signs in the neighborhood, king tides bring saltwater into the street each fall,
and he has personally canoed through the neighborhood during northeaster storms. He
did not oppose granting the variance but requested that conditions be imposed —
specifically, a berm or other measure to prevent runoff from silting the tidal creek and
harming the wading birds that use it, and a restriction on chemical lawn treatments given
that runoff flows directly into the ICW and tidal creek without any retention. He also
raised broader concerns about the city's oversight of problematic development in the
neighborhood, referencing a nearby home built below legal elevation and another failed
project with uncapped rebar pits remaining on-site.
A second neighbor, Greg, of 1301 Gladiola Street (identifying himself as living in the
"domed house" adjacent to the subject property), corroborated Vonn's account of
groundwater conditions. He testified that as soon as excavation began for the pilings, the
site "looked like a swoon" — requiring well points and pump equipment to dewater
before piling installation could proceed. He expressed frustration that this clear evidence
of groundwater did not trigger an earlier course correction, and sympathy for the
homeowners now caught in the consequences.
Director Askew, responding to Haynie's question about whether a berm or other
protective condition could be required, advised against it — adding fill in the floodplain
would worsen the compensatory storage obligation. She noted that the required 20 -foot
rear yard setback would serve as a natural buffer before any runoff reached the tidal
ditch, and that the property was not graded to direct runoff toward the ditch.
Board Discussion
Moody acknowledged that "somebody dropped the ball" in the approval and inspection
process, but noted that the house is built and the owners have invested substantially in
good faith. He concluded that the exceptional topographic conditions of the property —
specifically the extreme proximity of the groundwater table to the surface — would
warrant approval of the variance.
Haynie stated clearly what he viewed as the decisive distinction between this case and
Item 4.A: "This is already built. These aren't plans that are wanting, you know, more
than maybe should be granted, but it's already built, and it was built because it's
approved." He acknowledged that without granting the variance, a major financial
hardship would be imposed on owners who had done nothing outside the bounds of their
permits. He stated he "almost didn't know how we don't grant this."
Chair Hansen agreed the situation had become a practical matter: the house exists, and
without a CO, it sits unused. He was uncomfortable with how the situation developed
but recognized that the public works director's own recommendation supported the
variance.
Community Development Board (CDB)
August 25, 2026
MOTION. To APPROVE ZVAR26-0018 based on exceptional topographic conditions.
Motion: Rick Ferrin
Second. Jeff Haynie
Motion passed 4 to 0.
F. 150 Levy Road UBEX26-0002 (David Main)
Request for a use -by -exception approval for a craftsmen and artist operations in a
building that exceeds 2,500 square feet, as required by Section 24-175(d) Code of
Ordinances within the Mayport business overlay district at RE # 171066-0100.
Staff Presentation
Director Askew presented this use -by -exception request. The subject property is an
undeveloped, vacant lot located on the southwest corner of Levy Road and Orchid Street,
with a third frontage on West 14th Street, in the Mayport business overlay district. The
underlying zoning is Commercial General (CG). The purpose and intent of the Mayport
overlay district is to encourage economic development through a mix of commercial and
light industrial uses along the corridor.
The applicant, David Main, operates an artistic metal fabrication business currently
across the street on Levy Road, in a building located in the Light Industrial and
Warehouse (LIW) zoning district where such use is permitted by right. The subject
property, however, is zoned Commercial General, and the Mayport overlay district
permits craftsman and artisan operations as a use by exception when the building to be
used exceeds 2,500 square feet. Because the applicant's planned building will exceed
that threshold, a use -by -exception approval is required.
Director Askew provided zoning context: to the north of the subject property is the
industrial district; to the south along Levy Road are various commercial uses; and to the
south of West 14th Street is a residential zoning district (RG) with one- and two-family
homes. This adjacency to residential uses was noted as a consideration, triggering a
required 10 -foot landscape buffer along that boundary under commercial -to -residential
adjacency standards.
Director Askew summarized the applicable Comprehensive Plan policies. Policy 1. 10.4
directs the city to actively support appropriate redevelopment of the Mayport Road
corridor with retail and service uses that sustain neighborhoods and encourage
pedestrian -friendly environments. Policy 1.10.5 discourages the continuation and
proliferation of light industrial and intensive commercial uses along the Mayport
corridor in favor of neighborhood -serving, daily -activity -generating uses. Staff noted
that the proposed use — an artisan fabrication operation — sits in some tension with
Policy 1.10.5's preference for neighborhood -serving retail and services, though it is
expressly permitted as a use by exception in the overlay district code. Under Section 24-
63(d), the Board must evaluate whether the use would produce excessive noise, glare,
lighting, odor, or traffic adverse to adjoining properties, and whether it is compatible
with adjacent properties and consistent with the Comprehensive Plan.
Community Development Board (CDB)
August 25, 2026
Applicant Presentation
David Main, identified as an Atlantic Beach resident of nine years and owner of the metal
fabrication business, provided a detailed presentation that included renderings and a
three-dimensional model of the proposed development. He explained that he has
operated the business across the street for nine years — first renting 4,500 square feet
and later expanding to the full 9,000 square feet of the building — with no noise
complaints or code violations of any kind. The subject lot has sat vacant and in a
deteriorated condition for the entire time he has been a neighbor; he recently purchased
it with the intent to develop it for his business and remain in the community.
Main described the proposed building configuration as an L -shape, with the structure
running along the rear and one side of the lot in a way that would direct any noise toward
Levy Road rather than toward the residential properties on West 14th Street. The planned
entry and exit would be primarily from Levy Road, consistent with the existing business
operations across the street. He confirmed that all metalworking operations are
conducted indoors — both for practical reasons (tools, power, climate) and because the
Florida heat makes outdoor work dangerous — and that no raw materials or finished
products are stored outside. Business hours are 7:00 a.m. to 3:30 p.m., Monday through
Friday.
Main noted that the property would be required to meet landscape buffer requirements
adjacent to the residential zone, and that he intends to preserve and supplement existing
trees around the perimeter of the lot. A tree mitigation permit is already in progress. He
estimated that the proposed building requires seven parking spaces and that his current
plans accommodate 12. The pre-engineered metal building would be complemented by
stacked shipping containers used creatively for office space, providing an architectural
character he described as visually engaging and appropriate for the Mayport corridor
aesthetic.
Fischer Anderson, a neighbor and friend of the applicant from the surrounding
community, spoke in support of the character of both the applicant and the project. He
noted that the vacant lot had historically attracted transients, with refuse and on one
occasion a body found in abandoned vehicles on the property. He expressed strong
support for the improved condition of the lot since the applicant's purchase and clearing.
Board Discussion
Moody observed that the proposal appeared to fit well within the city's objectives for the
Mayport area, with the only technical issue being the building size exceeding the 2,500 -
square -foot threshold that triggers the use -by -exception requirement. All other
characteristics — hours of operation, indoor operations, parking, landscape buffering,
and no prior complaints — appeared consistent with what the overlay district envisions.
Haynie concurred that the proposal is consistent with the Comprehensive Plan provisions
and the requirements of Section 24-63 and Section 24-175.
Community Development Board (CDB)
August 25, 2026
5.
6.
7.
Attest:
MOTION: To APPROVE UBEX26-0002 based on its consistency with the Comprehensive
Plan and compliance with the applicable requirements of Sections 24-63 and 24-175.
Motion: Jeff Haynie
Second. Doug Moody
Motion passed 4 to 0.
REPORTS
Director Askew advised the Board that the proposed floodplain regulation update would be
brought forward for discussion at the next regular meeting. She indicated that revised draft
language would be distributed to Board members in advance. Director Askew noted that the
item had been intentionally omitted from the current evening's agenda, given the volume of
business and anticipated Board absences, to avoid an extremely late meeting.
PUBLIC COMMENT
Sarah Boren of 388 8th Street thanked the Board for its diligence and the quality of deliberation
on a challenging evening of decisions. No other public comment was offered.
ADJOURNMENT
There being no further discussion, Chair Hansen declared the meeting adjourned at 9:00 p.m.
Amanda As ew, Neighborhoods Director
Kirk Hansen, Chair
Community Development Board (CDB)
August 25, 2026