07-10-00 Exhibit C v • • `. City of Atlantic Beach, Florida Quarterly Strategic Action Plan Report 7/3/00 Estimated Estimated Actual Actual Strategic Priority Item Start Date Completion Date 7. UTILITY SYSTEM PLANNING (Bob Kosoy) a) Sewer Master Plan 01/14/00 *60% presentation to City Commission 08/14/00 * Complete efficiency analysis 08/14/00 * Complete Master Planning report _ 09/14/00 Ongoing b) Water Master Plan 10/09/00 05/01/01 Contingent upon receiving budget funding 07/03/00 — X � ~ O y O � • • City o antic Beach, Florida Quarterly Strategic Action Plan Report 7/3/00 Estimated Estimated Strategic Priority Item Actual Actual Status Comments Start Date Completion Date d) City Parks (Timmy Johnson) _ *Inventory all facilities, equipment,grounds 04/18/00 06/24/00 Completed *Prioritize needed repairs,estimate cos_ 06/01/00 06/24/00 Completed e) PD Building (David Thompson); clean, restain exterior 6/24/00 ? Completed 5. MAPPING a) Identify necessary software and hardware (David Thompson) 05/02/00 05/15/00 b) Acquire necessary software and hardware 10/01/00 03/31/01 If approved in 00-01 Budget c) Utility mapping overlays (Bob Kosoy) Awaiting computer *Software installation 05/15/00 07/07/00 assembly New computer delivered to GIS Technician Completed *Training of Public Works personnel 06/16/00 introductory courses May need additional courses *Sewer base maps completed by Master Plan with consultant 08/14/00 mapping ongoing *Water system mapping 10/01/00 Not presently funded *Stormwater mapping Only Core City area funded presently 6. INFORMATION TECHNOLOGY • TELEPHONE SYSTEM (David Thom•son) *Select IT Consultant 04/05/00 Completed *Review existing system 05/02/00 05/15/00 Completed Final report due from Consultant 7/14; recommendations will be evaluated by staff and *Identify needs for development 05/15/00 07/01/00 considered for the City's 00-01 budget *Reporting/Budgeting 07/01/00 07/15/00 *Implementation of Plan 08/15/00 Ongoing c gN p 4 • . City o antic Beach, Florida Quarterly Strate Action Plan Report 7/3/00 Estimated Estimated Strategic Priority Item Actual Actual Status Comments Start Date Completion Date CDB will recommend consultant for Commission *CBD to choose Group Plan consultan 05/16/00 07/18/00 to approve in first August meeting *Comp Plan changes ready for Commission review/ public hearings 08/31/00 09/30/00 Subject to Ordinance adoption by Commission *Final adoption of Comp Plan changes 10/01/00 11/30/00 and review by DCA *Joint workshop with Commission/CD Joint meeting may include both discussion of Board to discuss issues 07/18/00 07/18/00 zoning ordinance *Presentation of recommendations from CD Board to Commission 09/01/00 4. Maintenance of City Facilities a Road maintenance (Bob Kosoy) *Implement new software tracking Developing program system for roads/ inventory 06/08/00 08/15/00 format *Completion of maintenance plan 08/15/00 09/15/00 *Implementation of yearly maintenance plan 11/01/00 09/30/01 b) Street sign maintenance (Bob Kosoy) Most of the signs have now been cleaned or replaced. Additional work to include installing "dog boxes" at beach accesses and painting stop bars *Clean/replace street signs as needed 04/18/00 09/01/00 Ongoing on new pavement c) Storm drainage (Bob Kosoy) 90% plans have been submitted by Gee & Jensen *Improvements on W. 13th Street 09/01/00 02/24/01 on 6/19/00 *Improvements; Stanley to Jackson 04/17/00 _ 04/21/00 Completed Re•lacement of a deteriorated storm drain Replacement of a deteriorated storm drain.: field investigation revealed problems with easement *Improvements on Ardella Road 02/15/00 09/15/00 and engineering design will be needed Skate Road, Cavella Road, Aquatic Drive, W.Levy *Reshape ditches 10/01/99 09/30/00 Ongoing Road _ WD *Seminole Road 02/07/01 09/30/01 Re•lacement of storm •i•in• *Improvements in Royal Palm 07/01/00 09/01/02 If funded in 00-01 Fiscal Year Budget City of antic Beach, Florida Quarterly Strateg Action Plan Report 7/3/00 Estimated Estimated Actual Actual Strategic Priority Item Start Date Completion Dat Status Comments 1. CORE CITY PROJECT(Bob Kos_y) Per DEP Consent Order, must be completed by a) Sanitary Sewer Improvements 06/14/00 06/14/01 Under Construction 12/31/01; Contract awarded to Insituform on 5/22 Contractors for Core City Storm Water Project will Preliminary design be instructed to complete Sherry Dr. first or IA Sherry Drive 03/15/01 10/31/01 ongoing separate project to be awarded c) Stormwater/Water Engineer to present final recommendations to * Preliminary Design 01/03/00 07/24/00 Ongoing Commission 7/24/00 * Final Design 08/01/00 01/15/01 * Construction 04/09/01 02/15/02 2. MULTI-YEAR FINANCIAL PLANNING (Nelson VanLiere) a) Develop a multi-year financial planning Format outline format for AB Budget 04/10/00 06/30/00 complete Draft submitted to City Manager 6/26/00 b) Submit Preliminary Capital improvements to City Commission 06/30/00 08/01/00 c) Adopt Fy00/01 Budget with multi year 09/25/00 planning d) Refine project milestones and cost 11/01/00 schedules e) Prepare capital inventory 01/01/01 3. ZONING CODE (George Worley) a) Zoning Code revisions *CD Board submittal to Commission 06/01/00 06/01/00 Completed *Adoption of code revisions by Commission 06/01/00 Workshops ongoing First reading of zoning ordinance expected 9/00 b) Comprehensive Plan revision ;_