Loading...
08-28-00 Attachment B v 0 • . • ' . . PRESENTATION TO THE ATLANTIC BEACH CITY COMMISSION SEWER MASTER PLAN II G7 ATLANTIC BEACH H AND °°N 0 BUCCANEER DISTRICT SEWER SYSTEMS E o x� z „, cnH H O bci z r� r� H H AUGUST 28, 2000 z II • • ATLANTIC BEACH SEWER MASTER PLAN • Sewer System Mapping • Sewer Collection and Transmission Systems • Capital Improvement Plan 2 • 0 • , ATLANTIC BEACH SEWER MASTER PLAN Definitions: •Service Lateral: Small-diameter pipe, connects house to sewer main. •Sewer Main: Larger diameter pipe, located in street right-of-way, carries sewage through manholes to lift station. •Manholes: Located at intersections of sewer mains, provide maintenance access to sewer mains. •Lift Station: Pumps sewage up from deep sewer main depth to shallow sewer main depth. •Force Main: Discharge pipe from lift station. LEGEND L.S. MM" FORCE MAIN GRAVITY SEWER 4" L.S. "N" L.S. "G" 4 FLEET LANDING L.S. ❑ MH 404 Q (PRIVATE) / / L.S. "D" —--• MH 219 L.S. "H" N MH 156 I L.S. "J" L.S. "I" MH 775 I 4„ ---- I MH 787 4" I I I I MH 809 I WWTP I I \ I v \ I I o w \ I I \ I :coL.S. "B" \ I § 4„ MH 823 \ I 8„ n ——— Itl _ ry R„ 10" 8" 8 L.S. „K" L.S. ''C''C''� — o co , 8„ I L.S. A" 0 4 L.S. „ I v10 v I I a L.S. "L" 4„ I 0—"---0— L.S. "0"T <k) N MH 876 L.S. "E" Z 0 MH 11 FIGURE 3.3 0 ATLANTIC BEACH FORCE MAIN SCHEMATIC L U O SMITH & GILLESPIE ENGINEERS INC. lloo celery Boulevard•P.O. Box 59196•Jacksonville. Florida 92201•(904)743-6950 z LEGEND FORCE MAIN ---- GRAVITY SEWER • MAYPORT LANDING WWTP . L.S. 8" • --- MH 10 0 CYPRESS 6" CREEK 0 L.S. o oo 0 WEST END �1 SHANGRILA L.S. 4'' MH 192 L.S. MONTREAL °O A L.S. Q LAKESIDE L.S. NAVY 6" COURT L.S. Q MH 235 YARDS • 411 L.S. SCHOONERS BAY L.S.0 4" MIMOSA COVE L.S. y 6" I E ASPEN I PAN AM RIDGE I L.S. 4" O L.S. 6,r I �— M H�285B -1 MAYPORT TRACE (PRIVATE) MH 317 6 L.S.,-, 6,. FEATHERWOOD L.S. 4" U to N Z FIGURE 3.4 0 • BUCCANEER SYSTEM FORCE MAIN SCHEMATIC m SMITH & GILLESPIE 0 ENGINEERS INC. 1100 Cesery Boulevard•P.O. Bos 03138•Jacksonville. Florida 32201•(904) 749-6950 • LEGEND • FORCE MAIN WWT3 „S„ n � n _ 8„ o„ 8 „ „ 8„ 111111 (_0 IS v v n „ 11 S. E 0 C, 0' z v ATLANTIC BEACH MANIFOLDED FORCE MAIN SCHEMATIC U N N C7 COZ Q O O V - SMITH & GILLESPIE 3 ENGINEERS INC. t l00 Celery Boulevard•P.O. do: 53136•leeksonnik, Honda 32201•(901)719-0950 • • 0 , ATLANTIC BEACH SEWER MASTER PLAN Amount of Water and Wastewater Treated at the Atlantic Beach Water and Sewer Plants Water Plant Flow Sewer Plant Flow Percent Water Percent Water Not Month (Million Gallons) ( Million Gallons) Returned to Sewer Returned to Sewer Mar-00 63. 152 46.366 73% 27% Feb-00 53.606 45.365 85% 15% Jan-00 57.168 46.915 82% 18% Dec-99 56.228 45.533 81% 19% Nov-99 56.298 47.446 84% 16% Oct-99 59.457 59.592 100% 0% Sep-99 61.5 52.822 86% 14% Aug-99 74.89 48. 107 64% 36% Jul-99 74.619 48.384 65% 35% Jun-99 69.72 45.13 65% 35% May-99 71.128 44.702 63% 37% Apr-99 70.037 43.38 62% 38% Average 63.93 47.71 76% 24% • • 0 . ATLANTIC BEACH SEWER MASTER PLAN Atlantic Beach System Calculation of Infiltration Relative Potable Water Estimated Amount of Wastewater Wastewater Flow Infiltration Consumed Within Percentage of Potable Base Flow Rate Through Each as a Each Mini- Potable Water Water Lost to Calculated Lift Station Based Wastewater Flow Relative Function of Sytems From Lost to Irrigation or for Each on Drawdown Rate Generated Infiltration Mini- Mini- Billing Records Irrigation or Septic Tanks Mini-System Tests and Pump Within Each Mini- Flow Rate System System (GPM) Septic Tanks (GPM) (GPM) (1) Run Times (GPM) System(GPM) (2) (GPM) Flow A 185 38% 70 115 272 234 119 51% B 137 38% 52 85 455 277 191 69% C 374 62% 232 142 223 145 3 2% _ D 149 38% 57 92 179 111 19 17% E 214 38% 81 133 163 153 20 13% F 103 38% 39 64 111 111 47 43% G 92 64% 59 33 34 34 1 2% H 23 38% 9 14 20 20 6 29% _ I 6 38% 2 4 49 35 32 90% J 7 38% 3 4 14 14 10 71% _ K 13 38% 5 8 9 9 1 15% _ L 30 65% 19 11 11 11 0 0% M 138 83% 114 24 24 24 0 0% N 21 50% 10 11 11 11 0 0% O 11 38% 4 7 38 38 31 83% • • • ATLANTIC BEACH SEWER MASTER PLAN Buccaneer System Calcualtion of Infiltration Wastewater Flow Relative Potable Water Amount of Wastewater Rate Through Infiltration Consumed Estimated Potable Water Base Flow Each Lift Station Wastewater Flow as a Within Each Mini. Percentage of Lost to Calculated for Based on Rate generated Relative Function of Sytems From Potable Water Lost Irrigation or Each Mini- Drawdown Tests Through Each Infiltration Mini- Billing Records to Irrigation or Septic Tanks Sytem and Pump Run Mini-System Flow Rate Sytem Mini-System (GPM) Septic Tanks (GPM) (GPM) (1) Times (GPM) (GPM) (GPM) Flow Aspen Ridge 41 38% 15 26 56 56 30 54% Courtyards 18 38% 7 11 76 76 65 85% Cypress Creek 6 38% 2 4 67 67 63 93% Featherwood 22 51% 11 11 11 11 0 2% Lakeside 35 38% 13 22 67 67 45 67% Mayport Landing 67 54% 36 31 31 31 0 1% Mimosa Cove 79 38% 30 49 218 150 101 67% Montreal 28 38% 11 17 51 23 6 25% Navy 0 38% 0 0 73 73 - - Pan Am 0 38% 0 0 3030 - - _ Shangri-La 4 38% 1 3 58 7 4 58% Shooners Bay 17 38% 7 10 27 27 17 63% West End 27 38% 10 17 28 28 11 40% C! • 0 • ATLANTIC BEACH SEWER MASTER PLAN Atlantic Beach System Projected Flow Rates for the Year 2010 Year 2000 Flow Year 2000 Year 2010 From Each Mini- Wastewater Year 2000 Projected Flow Year 2010 Year 2010 Year 2010 Systems Based on Base Flow Relative Year 2000 Wet Increase though Mini Projected Flow Maximiun Maximium Drawdown Tests and Calculated for Infiltration Weather Inflow/ System Due To Increase Due To Projected Flow Projected Flow Pump Run Times Each Mini- Flow Rate Infiltration Population Growth Septic Tank Phase- From Mini- Through Lift Mini-System (GPM) Systems(GPM) (GPM) (GPM) (GPM) Outs(GPM) System(GPM) Station(GPM) A 234 115 119 225 17 0 475 570 B 277 85 192 307 _ 12 0 596 861 C 145 142 3 8 49 19 221 486 D 111 92 19 34 13 24 182 265 E 153 133 20 156 46 13 368 393 F 111 64 47 94 9 0 214 214 G 34 33 1 1 _ 5 4 44 83 H 20 14 6 17 26 0 62 62 I 35 4 31 86 1 5 128 171 J 14 4 10 28 1 0 43 43 K 9 8 1 4 3 16 32 32 L 11 11 0 0 4 12 26 26 M 24 24 0 0 3 0 27 27 N 11 11 0 0 2 0 12 39 O 38 7 31 56 1 0 _ 95 95 Total 1225 747 479 1015 192 93 2,525 IC) • 111 411 . ATLANTIC BEACH SEWER MASTER PLAN Buccaneer System Projected Flows for the Year 2010 Year 2000 Year 2000 Flow From Wastewater Year 2010 Year 2010 Each Mini- Base Flow Year 2000 Projected Flow Year 2010 Maximum Systems Based Calculated Year 2000 Wet Increase Maximum Projected on Drawdown for Each Relative Weather Through Mini- Projected Flow Tests and Mini- Infiltration Inflow/ System Due To Flow From Through Lift Pump Run Systems Flow Rate Infiltration Population Mini-System Station Mini-System Times (GPM) (GPM) (GPM) (GPM) Growth (GPM) (GPM) (GPM) Aspen Ridge 56 26 30 105 12 174 174 Courtyards 76 11 65 144 4 224 224 Cypress Creek 67 4 63 127 1 196 196 Featherwood 11 11 0 21 5 37 37 Lakeside 67 22 45 125 8 199 417 Mayport Landing 31 31 0 58 11 101 101 Mimosa Cove 150 49 101 283 24 457 668 Montreal 23 17 6 42 2 67 150 Navy 73 0 - 137 8 217 217 Pan Am 30 0 - 57 11 98 98 Shangri-La 7 3 4 13 1 21 172 Schooners Bay 27 10 17 51 4 82 82 West End 28 17 11 53 2 83 83 • • ATLANTIC BEACH SEWER MASTER PLAN ANALYSIS OF ATLANTIC BEACH MANIFOLDED FORCE MAIN SYSTEM ALTERNATIVE 1 - Addition of a Master Lift Station with Other Pump Station and Force Main Improvements Item No. Description QTY Unit Unit Cost Total 1 Master Lift Station 1 Each $ 280,000 $ 280,000 2 12" PVC Force Main From LS B 1600 Feet $ 54.00 $ 86,000 3 8" PVC Force Main From LS C 1400 Feet $ 36.00 $ 50,000 Pump and Motor Upgrade - Lift 4 Station E 1 Each $ 50,000 $ 50,000 Subtotal $ 466,000 Contingency $ 90,000 Resident Observer $ 65,000 Engineering and Permitting $ 70,000 Total Cost $ 691 ,000 i i i ATLANTIC BEACH SEWER MASTER PLAN ANALYSIS OF ATLANTIC BEACH MANIFOLDED FORCE MAIN SYSTEM ALTERNATIVE 2 - Increasing the Pump and Motor Size at the Pump Stations with New Force Mains and Without a Master Pump Station Item No. Description QTY Unit Unit Cost Total 1 Pump and Motor Upgrade - LS A 1 Each $ 86,400 $ 86,000 2 Pump and Motor Upgrade - LS B 1 Each $ 86,400 $ 86,000 3 Pump and Motor Upgrade - LS C 1 Each $ 72,000 $ 72,000 4 Pump and Motor Upgrade - LS E 1 Each $ 62,400 $ 62,000 5 Pump and Motor Upgrade - LS F 1 Each $ 62,400 $ 62,000 6 12" PVC Force Main 1600 Feet $ 54.00 $ 86,000 7 8" PVC Force Main from LS C 1400 Feet $ 36.00 $ 50,000 8 8" PVC Force Main from LS E 1350 Feet $ 56.00 $ 76,000 Subtotal $ 580,000 Contingency $ 120,000 Engineering and Permitting $ 140,000 TOTAL COST $ 840,000 3 • 4 ATLANTIC BEACH SEWER MASTER PLAN Recommended Improvements Improvement No. Improvement Description 1 Upgrade Lift Station H to include new pumps and motors,new concrete block building,piping modifications, and modifications to the existing electrical and control systems. 2 Addition of a Master Lift Station at the Atlantic Beach WWTP with other lift station and force main improvements- This option includes construction of the new Master Lift Station, increasing the existing 10" force main downstream of Station B to 12", installing a new force main downstream of Station C, adding new pumps and motors to Station E, and increasing the wet well volume of Station C and E. 3 Replace the West End Lift Station with a duplex above-ground station. 4 Upgrade the Mimosa Cove Lift Station to replace the existing pumps, piping, and controls. Increase the wet well storage volume by resetting the pump control elevations. 5 Replace the Lift Station I enclosure with a standard concrete block building, and modify piping, instrumentation and control systems. 6 Replace the Shangri La Lift Station with a new gravity sewer line to the Cypress Creek Lift Station. 7 Increase the wet well storage volume at the Navy Lift Station. 8 Gravity Sewer and Manhole Rehabilitation in Atlantic Beach System - Mini-systems to be rehabilitated include 0, I, J, F, and the remainder of mini-systems A and B. 9 Gravity Sewer and Manhole Rehabilitation in Buccaneer System - Mini-systems to be rehabilitated include Cypress Creek, Courtyards, Mimosa Cove, Lakeside, Aspen Ridge, Schooner Bay, and West End. 10 Upgrade Lift Station 0 to replace the existing pumps,piping,and controls. I q • S ♦ . ATLANTIC BEACH SEWER MASTER PLAN TEN-YEAR CAPITAL IMPROVEMENT PLAN FOR ATLANTIC BEACH AND BUCANEER DISTRICT SEWER SYSTEMS Year Description Estimated Cost 1 Replace the pumps and motors at Lift Station H with larger pumps and motors. $66,000 Construct Master Lift Station at Atlantic Beach WWTP; Replace 10"force main with 12"force main from Lift Station B to $691,000 junction with 18"at WWTP influent; Install new 6"force main from Lift Station C to junction with 18"at WWTP influent; Replace pumps,motors,electric and instrumentation systems at Lift Station E with larger pumps and motors,and electric and instrumentation system improvements; Increase wet well volume at Lift Stations C and E. Replace the West End Lift Station with a duplex above ground station; $100,000 Increase pumping capacity and wet well volume at the Mimosa Lift Station; $65,000 Replace Lift Station I enclosure with a standard concrete block building,and modify piping,instrumentation and control system. $45,000 Replace the Shangri La Lift Station with a new gravity sewer line to the Cypress Creek Lift Station. $140,000 Increase wet well storage volume at the Navy Lift Station. $50,000 Investigate Atlantic Beach and Buccaneer District gravity sewer systems. Estimated Cost Year 1 $195,000 $1,286,000 2-9 Perform Gravity Sewer and Manhole rehabilitation within the Atlantic Beach and Buccaneer District Systems. $1,208,611 Estimated Annual Cost,Years 2-9 $1,208,611 10 Perform Gravity Sewer and Manhole rehabilitation within the Atlantic Beach and Buccaneer District Systems. $1,093,612 Increase pumping capacity at Lift Station O. $65,000 Estimated Cost Year 10 $1,158,612 Estimated Total Costs Years 1 — 10 $12,113,500 1.{ J ,. ' I City of Atlantic Beach I Wastewater Pump Station Inventory List • Station Name: I IA Station Type: 1 I WET WELL MOUNTED 2 Station Address: I 16th St.and Sherry Dr. Number of Pumps: 1 Last Project No.: I f Part of which System: 1 (AB Date of Last As-Built: I PUMP SECTION I CONTROLS SECTION 1 Pump No. 1 1 Pump No.2 , Manufacturer: 1 Gorman-Rupp Gorman-Rupp Control Type: ' BUBBLER Pump Model No.: I 1T6A60-B 1T6A60-B Measured from where? 1 City As-builts Pump type: I ISELF-PRIMING (SELF-PRIMING High Water Alarm: I -32�_ Pump SN: 11182195 11052568 Lag On: 1 -1.32 Motor Manufacturer:I IGE Siemens-Allis Lead On: I -1.82 Motor Model No.: 5K324AL2050 324T 1 1 Lag Off: 1 -d.82 . Motor SN: I - I - ----- Lead Off: 1 -4.82 Motor Horsepower: 1 140 140 Motor RPM: 1 11760 11760 FORCE MAIN INFORMATION SECTION 1 • Motor Voltage: I 230/1-1-67377-1 460 3PH 230/460 3PH - FM Header Dia.(in): 1 171—"---- Pump RPM: I 1 - - - --� --- -- -- •---- - FM Header Inv.Out: I 14.85 Motor Pulley Dia.: 1 7.5 7.5 Check Valve Dia.(in): I 1r------ Pump Pulley Dia.: 1 15----- - — 9 Plug Valve Dia. (in): 1 Ir---- Belt Belt Size: 1 1 I FM Diameter(in): 1 8 Pump Curve No.: 1 1 I FM Material: I DI Disch Elev: I4.28 Primary GPM: 1 1597 1538 FM Termination Pt.: Primary Head(psi): 1 28 128 --- — FM Inv.at Termination: 1 36.04 Impeller Dia.(in.): 12. 1.12.1—=---r- _ . FM-Length(ft.): —1 4332 -------- - - --- Suction size(in.): 1 6 6 - Part of Manifold FM: -- 1 YES Discharge Size(in.):1 1616 - - PSs on ManifoldFM: 1 1E7---- •III Smit Smith and Gillespie Engineers,Inc. 3-6 Proj.No.08505-025-01 08/08/2000 01:45 PM FIGURE 3.2 • City of Atlantic Beach ' I Wastewater Pump Station Inventory List Station Name: 1 IA Station Type: 1 I WET WELL MOUNTED 1. 4111 Station Address: I 16th St.and Sherry Dr. Number of Pumps: I 12 Last Project No.: 1 ( Part of which System: I I AB Date of Last As-Built: 1 I WET WELL SECTION 1 INFLUENT PIPE SECTION WW Shape: 1 CIRCULAR Inlet Pipe Type: i Inlet Pipe Type Diameter(ft): 1 8 Inlet Size(in): 1 12 Inlet Size 2(in): 1 . . --1 Length(ft): FM or GS: 1 GRAVIT Y SEWER FM or_GS 2: -1 Width(ft): _ . .—-- - - -- Inlet Inv: , F3.71-6---- Inle.t Inv 2: Top Elev: I 8.16 Floor Elev: 1 -7.07 Inlet Pipe Type 1 Inlet Pipe Type Suction Elev: I -6.57 6-1Z-e-.-3—(in) --- - - Inlet Size 3(in): 1 Inlletet Size_4(in): 1 r----- FM or GS 3: 1 FMorGS4: WW Area(ft"2): 1 50.27 WW Vol: 1 -_. Inlet Inv 3: 1 Inlet Inv 4: 111 • Smith GillespieEngineers,En ineers,Inc. 3-7 Proj.No.08505-025-01 08/08/2000 01:45 PM FIGURE 3.2