02-03-98 v4110
CITY OF ATLANTIC BEACH
SPECIAL CALLED MEETING
7:15 PM
TUESDAY, FEBRUARY 3, 1998
AGENDA
Call to order
0 1.Selection of a third party engineer to review the proposed core city drainage
improvements, and any other related action deemed necessary
2.Any other business
Adjournment
MINUTES OF THE SPECIAL CALLED MEETING OF ATLANTIC BEACH CITY
COMMISSION HELD IN COMMISSION CHAMBERS, 800 SEMINOLE ROAD, AT 7:15 PM
ON TUESDAY, FEBRUARY 3, 1998
Present: Suzanne Shaughnessy, Mayor
Louis M. Borno, Commissioner
John S. Meserve, Commissioner
Theo K. Mitchelson, Commissioner
Also: Alan C. Jensen, City Attorney
James R. Jarboe, City Manager
Maureen King, City Clerk
Absent: Richard M. Beaver, Commissioner
The meeting was called to order by Mayor Shaughnessy.
1.Selection of a third party engineer to review the proposed core city drainage
improvements, and any other related action deemed necessary
Commissioner Mitchelson moved to select Terry L. Rice, Inc. to review the drainage project
and report to the City Commission. The motion was seconded by Commissioner Borno.
The City Manager explained that Col. Rice's proposal was not final and he would continue to work
to finalize the contract with Col. Rice's firm. He reported that Col. Rice was familiar with Mike
Schmidt (engineer who served on the Howell Park Review Committee) and would be willing to work
with him on this project. Mr. Jarboe indicated he would work with Col. Rice to reduce the proposed
90-day work period.
Mayor Shaughnessy read the proposed work plan set forth in Col. Rice's proposal and invited
comments from the audience.
Joe Posch, 142 Magnolia Street, confirmed that there would be an opportunity for public input during
the review procedure.
J.P. Marchioli, also expressed an interest in being able to participate in the review process.
Stephen Kuti, 1132 Linkside Drive, requested that advance notice be given for public hearings.
There being no Commission discussion the Mayor called for a vote and the motion carried
unanimously.
Page Two
Minutes - Special Called Meeting
February 3, 1998
2.Any other business
Mayor Shaughnessy pointed out that the City Commission had not formally approved a scope
of work but she felt that Col. Rice had all the knowledge, training, and experience to conduct
a thorough review of the drainage project. The Mayor moved, in light of the knowledge
and experience, of Col. Rice, not to restrict the scope of the work as long as it does not
extend the time period or the agreed upon fee. The motion was seconded by
Commissioner Borno.
The Mayor indicated that she made the motion because at an earlier Commission workshop
Engineer Michael Schmidt had brought out several points which she felt would be valuable
to address. When asked if he had recommendations regarding the core city project, Mr.
Schmidt had pointed out that the majority of the England, Thims& Miller(ETM) design was
done in headwater systems and it would be best to look at the entire watershed; therefore,
she did not want to restrict Col. Rice from looking at the entire watershed if it could be done
within the price and time limit. She pointed out that Michael Schmidt had offered to
undertake the computer modeling at no cost to the city.
Commissioner Meserve agreed that the entire flow should be considered as part of the review;
however, he felt the City Manager needed to keep the review focused on the current project.
Mayor Shaughnessy pointed out that the permit for this project was issued for "small,
individual projects without significant environmental impact." She indicated that the Corps
now knew that this was a small project but was part of a much larger project and may not fall
within the parameters of the original permit. She wished to get as much information as
possible and did not wish to tie the hands of staff or the engineers.
Commissioner Mitchelson felt that it was not the intent of the City Commission to precisely
define the scope of work but rather, if individual Commissioners had questions to which they
needed answers, that they submit these questions in writing so they could be addressed.
Following further discussion there was consensus that the scope of work as outlined in Col.
Rice's proposal included enough generalities that the contract could be negotiated by the City
Manager, up to the limit allowed by State law.
Mayor Shaughnessy then moved to add as part of the contract that a coupled head and
tail water analysis is requested by the City Commission. The motion was seconded by
Commissioner Borno and carried unanimously.
Page Three
Minutes - Special Called Meeting
February 3, 1998
Mayor Shaughnessy then pointed out that Mike Schmidt had recommended that a sensitivity
analysis be done in response to the phrase that the ETM design is for a"two-year storm with
normal tides." She felt that it was understood that this was included in the motion just
adopted.
Mayor Shaughnessy reported that Mike Schmidt had volunteered his services, free of charge,
to assist in the review process. She appointed Commissioner Borno to work as a Commission
liaison throughout the review process. Commissioner Borno agreed.
The Mayor confirmed that staff would work with the consultant and make the required
materials, etc. available to the consultant upon request.
The Mayor requested that engineer Hugh Mathews consult with the principal partners of
ETM with regard to authorizing his participation in the review process on a commensurate
fee schedule with Mike Schmidt's. She pointed out that both engineers were Atlantic Beach
residents and since Mr. Schmidt was willing to volunteer his services at no cost to the city and
she was interested to know if ETM would make a similar offer, and sought the will of the City
Commission in this regard.
Mayor Shaughnessy moved to ask Hugh Mathews if he would consult with his senior
partners about authorizing his participation in the review process on a commensurate
fee schedule with Mr. Michael Schmidt's
The City Manager reported that Mr. Mathews had indicated he would be willing to work with
Col. Rice as needed during this review.
Commissioner Meserve felt that ETM had been hired by the City and should be paid for any
services rendered.
The motion died for lack of a second.
Commissioner Borno felt that ETM would be willing to consult with Col. Rice on a voluntary
basis.
Stephen Kuti indicated that ETM had billed the city $9,000 for dealing with the public and
an additional $10,000 had been approved by the City Commission for consultant services.
He felt ETM had not provided these services and this was the minimum that ETM should do
since they had been paid twice for not doing the job.
Page Four
Minutes - Special Called Meeting
February 3, 1998
Mayor Shaughnessy reported that the Department of Transportation had made a presentation
in December regarding the A-1-A arterial study. Mayor Vaughn has asked the DOT to make
a presentation to the Neptune Beach City Council and he has invited Atlantic Beach City
Commission to attend. Several dates were suggested and February 12 was selected by the
City Commission as the preferred date.
Mayor Shaughnessy requested that a goal setting session be scheduled and suggested
approximately three meetings be held - the first meeting to be a public input meeting to
determine the public's goals for the city and then a meeting for the City Commission to
discuss the ideas put forth by the public. Staff could cost out some of the goals and a
commission workshop could then be scheduled to finalize goals.
Discussion ensued regarding the format and the number of meetings which would be required
and the City Manager agreed to work on the format and present various options at the
Commission meeting on February 9.
Commissioner Mitchelson felt that public input could be received at a regularly scheduled
Commission meeting. The City Commission concurred and the Mayor requested that 2-
week's notice be given for public input. The goal setting public hearing will be included on
the agenda of the Commission meeting on February 23, 1998.
Commissioner Meserve reported he had met with Roger Sharp of the JTA in connection with
the beautification/landscaping projects and he had learned that work on the eastern end of the
Wonderwood connector could go to contract within a year. Also construction of the
proposed Mayport Road/Atlantic Boulevard interchange was moving ahead faster than
anticipated and he suggested the City Commission monitor and stay involved in these projects
so they would have some input in the type of beautification to be included. He said he would
stay involved through the Mayport Waterfronts Partnership. The City Commission also
requested that Roger Sharp of the JTA be requested to make a presentation at a Commission
meeting as soon as possible.
The City Manager reported that city staff had attended a meeting regarding the construction
of the new bridge over the Intracoastal Waterway and had some concerns about the design,
particularly for the traffic entering Johnston Island. He indicated this would require a right-
hand turn from Atlantic Boulevard in a 45-mile per hour speed zone which he felt created a
safety hazard. He suggested the Mayor write a letter to the DOT expressing these concerns.
Commissioner Borno moved to authorize the Mayor to submit a letter to the
Department of Transportation expressing concerns in relationship of the construction
Page Five
Minutes - Special Called Meeting
February 3, 1998
of the bridge across the Intracoastal Waterway on Atlantic Boulevard. The motion was
seconded by Commissioner Mitchelson, and carried unanimously.
Commissioner Mitchelson expressed concerns, particularly with respect to the volume of
traffic which would be involved if the gambling ship proposing to dock at Johnston Island is
approved.
The Mayor then opened the floor to further citizen comments:
J.P. Marchioli: suggested that interested citizens forward any input relative to the
core city drainage project to Col. Rice C/O City Hall - The City Commission
concurred.
Don Phillips: suggested that the scope of work for Col Rice should include discussion
with the St. Johns River Water Management District on any recommended changes
to the ETM plan with an opinion of the potential acceptance of the SJRWMD. The
Mayor indicated that this would be anticipated.
Cindy Corey: thanked the City Commission for hiring an independent consultant.
There being no further discussion, Commissioner Borno moved to adjourn. The motion was
seconded by Commissioner Meserve and the meeting was adjourned at 8:25 PM.