04-17-95 v fif+
CITY OF ATLANTIC BEACH
SPECIAL CALLED MEETING
4:30 PM, MONDAY, APRIL 17, 1995
AGENDA
Call to order
1. Overview of capital projects - City Manager and Department
Heads
2. Review of funding needs and sources - Ann Meuse
3. Commission discussion and action on above
4. Any other business
Adjournment
MINUTES OF THE SPECIAL CALLED MEETING OF ATLANTIC BEACH CITY
COMMISSION HELD IN CITY HALL, 800 SEMINOLE ROAD, AT 4:30 PM ON
MONDAY, APRIL 17, 1995.
Present: Mayor Lyman T. Fletcher
Commissioner Steven Rosenbloom
Commissioner Suzanne Shaughnessy
Commissioner J. Dezmond Waters (Arrived late)
Commissioner Robert Weiss
Staff Present: City Manager Kim Leinbach
Deputy City Manager Jim Jarboe
Finance Director Ann Meuse
Public Works Director Bob Kosoy
Assistant Public Works Director Ernie Beadle
Buccaneer Chief Plant Operator Harry McNally
City Clerk Maureen King
The meeting was called to order at 4:46 PM by Mayor Fletcher. The
Mayor gave a brief overview of the city' s water and sewer
facilities and indicated that operational expenses should be funded
through enterprise fund revenues. He indicated that no rate
increases or assessments were being considered to pay for capital
projects.
The Mayor distributed a list of projects, identified as Exhibit A
attached hereto. The list was separated into projects which he
felt should be included in the capital improvement plan, projects
which he felt may be questionable, and projects which may be more
accurately identified as operation and maintenance projects. Lists
of projects which had been discussed at previous meetings were also
used for reference and are attached hereto and identified as
Exhibits B, C, and D.
The proposed projects were discussed at length and it was agreed
projects should be undertaken together where possible to minimize
the cost and inconvenience of excavating streets more than once.
Commissioner Rosenbloom suggested the city contact the Jacksonville
Electric Authority to see if underground electric lines could also
be laid in conjunction with the projects. It was pointed out this
would not be a consideration in the Buccaneer district where the
city did not have jurisdiction over the streets.
In comments from the audience, Alan Potter, 374 Second Street, felt
the city needed to proceed with the projects for which money had
been borrowed from Barnett Bank. He also noted that money had been
collected from Oak Harbor residents over a five year period for the
purpose of upgrading the water and sewer lines and as yet, no work
had been done.
Further discussion ensued regarding the various projects listed in
Exhibit A and estimated costs were identified for each project.
Mayor Fletcher moved to approve the first ten items on Exhibit A,
Page Two
Minutes of Special Called Meeting
April 17, 1995
subject to available financing, as the first step in developing a
Capital Improvements Plan. The motion was seconded by Commissioner
Shaughnessy and was unanimously approved.
Discussion then ensued regarding Exhibit A, No. 11, Buccaneer Long
Range Plan, specifically the location of the proposed wet well.
Commissioner Weiss pointed out increased capacity would be required
in the event a nuclear carrier was assigned to the Mayport Navy
base. In response to an inquiry from Commissioner Shaughnessy,
Harry McNally indicated he felt the proposed location would require
the least amount of piping and in his opinion, was the best
location. The Mayor requested that a sketch be provided showing
the proposed layout of the Buccaneer plant.
Bob Kosoy indicated two concerns at Buccaneer were odor control and
the desire to reduce the electrical costs for the lift stations. He
felt the wetwell project was a priority since it would have a
positive impact in both of these areas.
Mayor Fletcher moved to approve the inclusion of the Buccaneer
wetwell in the Capital Improvement Plan, contingent upon an in-
house schematic of the proposed layout at the Buccaneer plant being
prepared and approved by the City Commission. The motion was
seconded by Commissioner Shaughnessy. Brief discussion ensued
regarding the possibility of acquiring an additional lot and
requesting that the City of Jacksonville abandon Regulus Drive,
thus providing a larger site which would not be divided by a
street. It was felt the additional land may be required for future
expansion of the plant. Following brief discussion the motion was
unanimously approved.
Discussion then ensued regarding the catwalks at Buccaneer and
Commissioner Weiss pointed out this had been identified as a safety
problem and the city would be liable if improvements were not made.
Commissioner Weiss moved to include repair/rebuilding of the steel
walkway at Buccaneer wastewater treatment plant in the Capital
Improvement Plan at a cost not to exceed $200,000. The motion was
seconded by Commissioner Rosenbloom. During brief discussion the
Mayor requested that the walkway be closely examined when the beams
were exposed to determine the extent of the necessary repairs, ie.
to rebuild the entire walkway or replace portions as required. The
question was called and the motion carried unanimously.
(Commissioner Shaughnessy was out of the room and did not vote) .
Discussion ensued regarding expansion of the Buccaneer wastewater
plant and Harry McNally pointed out when a wastewater treatment
plant reached 80% capacity, the State of Florida required that the
owner be in the design stage for expansion of the facility. He
Page Three
Minutes of Special Called Meeting
April 17, 1995
advised the City Commission that the Buccaneer plant was now
operating at 80% of capacity. Staff was directed to provide more
specific data in this regard. The City Commission took no action
on the matter at this time.
Discussion then ensued regarding the proposed sewer rehabilitation
in the Saltair section. Jim Jarboe pointed out this project had
been included as a part of sewer main rehabilitation in previous
project lists. However, the sewer lines had recently been
televised and the condition of the lines, along with the fact that
the sewer line ran under a corner of Community Presbyterian Church,
had made this project an emergency. It was pointed out this would
be an appropriate project in which to undertake installation of
water and sewer lines and stormwater drainage improvements in one
combined project. It was further pointed out much of the
construction would be on private property and the question of
excavating streets would be moot.
The Mayor moved to include the Saltair sewer rehabilitation project
in the Capital Improvement Plan. Commissioner Shaughnessy seconded
the motion and indicated she felt the installation of water and
sewer lines, and drainage improvements should be undertaken in
unison. The motion carried unanimously.
Discussion then ensued relative to the projects which the Mayor had
classified as "questionable, " specifically the distribution system
on Mayport Road. Harry McNally explained this project would
replace a two-inch line which serves some commercial buildings and
a trailer park. He pointed out this area also had no fire
hydrants. Due to the proximity with Mayport Road it was felt
construction and permitting would be expensive and Mr. McNally was
instructed to check into alternatives.
With reference to No. 3, Flow Meters, Harry McNally advised this
item could be deleted.
In discussion relative to standby generators, it was pointed out
this item would be included in the operating budget and could be
removed from the Capital Improvement Plan. It was also pointed out
that a generator at the Atlantic Beach wastewater treatment plant
would become surplus during the proposed expansion of that plant
and this generator may be adequate to meet the needs at the
Buccaneer plant. Staff will present a recommendation in this
regard at a later time.
In discussion relative to Exhibit A, Page 3, Operations and
Maintenance, it was pointed out the fence at Buccaneer, had been
completed and could be deleted. Most of the items on this list
were identified as operational and would be included in the 1995/96
Page Four
Minutes of Special Called Meeting
April 17, 1995
operating budget. With respect to water and sewer main
installation, Bob Kosoy pointed out several water and sewer
projects in the Royal Palms and Old Atlantic Beach area were
included in this general category.
Discussion ensued relative to financing and Commissioner
Shaughnessy felt that any future borrowing should be in an amount
that would be sufficient to upgrade the entire water and sewer
system. She felt that any area that was not brought up to standard
would compromise the entire system. Commissioner Rosenbloom felt
the city should consider a bond issue that would be adequate to
fund all the water and sewer projects and Alan Potter felt the city
had received an exceptional deal from Barnett Bank and favored
renegotiating with Barnett for additional funds. Jim Jarboe
indicated that when the projects were identified, the City Manager
would then be in a position to seek recommendations regarding
financing from the financial advisor.
Following further discussion relative to water and sewer projects,
Commissioner Rosenbloom moved to include water and sewer main
installation and sewer main rehabilitation in the Capital
Improvement Plan, all projects subject to availability of funding.
The motion was seconded by Commissioner Shaughnessy and was
unanimously approved.
There being no further discussion, the Mayor declared the meeting
adjourned at 7:35 PM.
AOILL,
Lyman T. Fletcher
Mayor/Presiding Officer
ATTEST:
Mau een King
City Clerk
EXHIBIT A - 4-17-95 _
—
CAPITAL IMPROVEMENT PROJECTS
1 . Water Plant #3 (Assisi)
2 . Touch Pad Meters (Detail where they go)
3 . Water Plant #2 - Plans
4 . Water Plant #2 - Well
5. Water Mains Oak Harbor
6. City Meters - Size and Location (Identify each one)
7 . Corrosion Reduction
8 . Beach Avenue Water and Sewer - Intersections only
9. Sewer Plant Expansion - Atlantic Beach
10 . Oak Harbor Sewer Rehab
11 . Buccaneer Long Range Plan
a. Wet Well
b. Steel walkway
c. Increased capacity
12 . Saltair Sewer Rehab
EXHIBIT A - 4-17-95
CAPITAL IMPROVEMENT PROJECT - OUESTIONABLE
(Do we need it? Where and When?
1 . Cap/Fix Well at Buccaneer
2 . Distribution System Mayport Road (Will it bring in any new
customers)
3 . Flow Meters
4 . Standby Generators
_. EXHIBIT A - 4-17-95 —
i
OPERATIONS AND MAINTENANCE
1 . Fence - Buccaneer
2 . Water Main Installation
3 . Truck Meter Readers
4 . Truck Water Crew
5. Truck and Crane
6. Two Trucks (Sewer)
7 . Tractor - 4x4
8 . Sewer Main Maintenance
9. Steel Catwalks
10. Clarifier Weirs
11 . Sludge Truck and Hook
12 . Sea Oats Apartments - upgrade (who owns lines and why?)
13 . Four lift stations - Valves, fairways, Park Street and
Stewart Street
14 . Blower
15. Lab Equipment
16. Sewer Main Rehab - Buccaneer (necessity?)
EXHIBIT A - 4-17-95
FINANCING
1 . What is the Utilities Net Cash Flow? (Gross Revenue minus
Operation Maintenance and Debt Service equals Net Cash Flow
- Funds available for Capital Item with current and
projected rate increases)
2 . Beach Avenue Water and Sewer Project revenue from
assessments for the lines with the city paying for the
intersection.
IP
Gaidtt
OGk41 t t 4/ 11/1
WATER AND SEWER CAPITAL IMPROVEMENTS ESTIMATE
A. Needed Equipment Expenditures for F 94 '5
(Per the Commission's direction, some previous projects in Fy 94/95 have been
moved for future funding consideration)
. Pick-up Truck AB Water 12,500
. Electric Valve Wrench AB Water 5,000
. Utility Truck with Crane AB Water 21,500
. Tractor (4x4) AB Water 40,000
. Portable Large Meter Tester BUC Water 4,000
. Fence for WTP #4 BUC Water 5,000
. Pneumatic Valve Wrench BUC Water 4,500
. Pickup Truck for Meter Readers BUC/AB Water 10,000
. Roll-on Roll-off Sludge Tr. AB Sewer 60,000
. Lift Stations Valve Replace. AB Sewer 27,500
. Pick-up Truck AB Sewer 10,000
. Miscellaneous Sewer Plant Equip. AB Sewer 7,500
. Replace Clarifier Weirs BUC Sewer 34,500
. Upgrade Elec. Service BUC Sewer 35,000
. Influent Flow Meter BUC Sewer 8,500
. Truck BUC Sewer 10,000
. Controls BUC Sewer 9,500
. Blower BUC Sewer 6,500
. Lab Equip. BUC Sewer 4,000
. Screen for Surge Tank BUC Sewer 40,000
. Tri-pod Safety Harness BUC Sewer 6,000
. Oder Control BUC Sewer 8,000
Total $379,500
B. Important Projects which should begin in Fy 94/95
3.0 MGD Expansion AB Sewer 4,293,754
Sewer Plant (add on) AB 600,000
4,893,754
Master Wetwell BUC 200,000
(Wetwell add on included)
0.65 MGD Expand.BUC Sewer 1,115,000
Enlarge/Rehab. WTP#3 BUC Water 550,000
fr71 'c
AB New Well Project
Plans & Spec WTP #2 -25,000
New Well at WTP #2 -75,000 100,000
Sewer Main Maint. AB Sewer 303,000
Steel Catwalks BUC Sewer 190,000
Cantebury Court Upgrade Sewer 75,000
Total $7,326,754
C. Needed Capital Improvement Projects in Priority Order
AB-BUC Water/ Meter Project
Encoded Water Meters AB 143,000
Water Main Install. AB 850,000
Encoded Water Meters BUC 125,000
Commerical & Replacement 208,000
$1,326,000
Oak Harbour W&S Project
Water Mains Oak Harb. 500,000
Sewer Rehab. Oak 700,000
Encoded Water Meters OAK 31,600
$1,231,600
Water Distribution Project
Water Distri.Sys.Mayport Rd. BUC 300,000
(Includes 100,000 from fy 94/95)
Water Trunk & Loop AB 1,250,000
1,550,000
Sewer Mains Project
Sewer Main Rehab.AB Sewer 2,604,500
(Includes Project Design)
Sewer Main Rehab. Buc. 600,000
3,204,500
AB/BUC Lift Stations Project
Buc. Lift Sta. 120,000
Park St. Lift Sta. AB 40,000
Stewart St. Lift Sta.AB 40,000
Fairway Villas Lift Station AB 45,000
$245,000
.
Bch. Ave. W&S Project
Bch. Ave. Water 337,293
Beach Ave. Sewer 456,815
$894,108
Force Maius to Sewer Plant AB 150,000
AB Water Tank Project.
Land for Water Tower AB 150,000
Water Tank AB 375,000
$525,000
City Property Meters AB 50,000
Corrosion Reduct.WTP1 AB 30,000
Cost $9,206,208
D. Available Funding
Barnett Loan $4,929,754
Fy 94/95 Revenue 571,000
$4,500,754
E. Total Cost
379,500 Equipment Expenditures
7,326,754 Fy 94/95 Projects
9,206,208 Needed Projects
$16,912,462
F. Other
. Sludge Management (Reserve Cont.) 1,500,000
. Buc. Generator (wwtp) (Operating) 110,000
. Standby Lift Sta. Gen. BUC(Operating) 40,000
* All estimates base on Staff, Consulting Engineers and Water and Sewer Committe
review.
-
r`
Page 2 - Attachment A
STORM WATER MASTER PLAN
RECOMMENDED CAPTIAL OUTLAY
1. AHERN TO 2ND ST./SALTAIR $ 284,227
(SM-A & SM-D)
2. THIRD TO 5TH ST. 773,951
(SM-B)
3. 6TH TO 8TH ST. 547,007
(SM-C)
4. PLAZA TO 11TH ST. 1,071,423
(SM-E)
5. 11TH. ST. TO CLUB DR. 193,980
(SM-F)
6. CLUB DR. TO SATURIBA 250,000*
(SM-G) (1,111,324)
TOTAL $3,120,588
*Staff recommendation
WATER AND SEWER CAPITAL OUTLAY
A. WATER CAPITAL OUTLAY:
Available Additional
FY 94/95 Needed Total
. Water Plant #3 550,000 (150,000) 400,000
. Meters 299,600 299,600
. Water Plant #2 Plans 25,000 25,000
. Water Plant #2 Well 75,000 75,000
. Cap or Fix Well (Buc) 20,000 20,000
. Water Main Install. 150,000 700,000 850,000 --
. Land for Water Tower 150,000 150,000
. Meter Tester 4,000 4,000
. Fence WTP #4 5,000 5,000
. Truck/Meter Readers 10,000 10,000
. CAD 50,000 50,000
Truck/Water Crew 10,000 4,500 14,500
. Distrib. Syss. Mayport Road 100,000 200,000 300,000
. Wrench (2) 9,500 9,500
. Truck with Crane 17,000 17,000
. Tractor (4x4) 60,000 15,000 75,000
. Water Mains Oak Harbor 500,000 500,000
. City Meters 50,000 50,000
. Water Tank 375,000 375,000
. Corrosion Reduction 30,000 30,000
. Beach Ave. Water 337,563 337,563
. Meter Replacements 208,000 208,000
. Tri-pod Safety Harness 6,000 6,000
. Contingency (10%) 381,116
1,385,100 2,426,063 4,192,279
IN irre
B. SEWER CAPITAL OUTLAY:
Available Additional
FY 94/95 Needed Total
-- . 3 MGD Expansion 4,293,754 600,000 4,893,754
. Collection Project Design 20,000 20,000
. Sewer Main Maintenance 303,000 2,604,500 2,907,500
. Steel Catwalks 190,000 190,000 380,000
. Clarifier Weirs 34,500 34,500
. Upgrade Electrical 35,000 35,000
. Master Wetwell 100,000 100,000
. Sludge Truck 60,000 20,000 80,000
. Hook on Sludge Truck 27,000 27,000
. Coll. Lines Upgr.-Cant. Apts. 75,000 75,000
. Flow Meters 8,500 8,500
. Oak Sewer 700,000 700,000
. Lift Station Valves 27,500 27,500
. Fairways Lift Station 45,000 45,000
Park Street Lift Station 25,000 15,000 40,000
. Stewart Street Lift Station 25,000 15,000 40,000
. Buc. Generator (VW TP) 110,000 110,000
. Storage Construction 36,000 36,000
. Trucks (2) 20,000 4,500 24,500
. Instrumental Control 9,500 9,500
. Blower 6,500 6,500
. Lab Equipment 4,000 4,000
. Surge Tank Screen 40,000 40,000
. Tri-pod Safety 6,000 6,000
. Odor Control 8,000 8,000
. Misc. Sewer Equipment 7,500 7,500
. Pressure Washer 4,000 4,000
. 0.75 MGD Expansion 1,115,000 1,115,000 -
. File Cabinets 1,600 1,600
. Buc. Lift Station 120,000 120,000
. Sewer Main Rehab. Buc. 600,000 600,000
. Beach Ave. Sewer 456,715 456,715
. Force Mains 150,000 150,000
. Sludge Management 1,500,000 1,500,000
. Standby Lift Station Gen. 40,000 40,000
Contingency (10%) 1,365,307
6,079,754 7,573,315 15,018,376
I
CITY OF ATLANTIC BEACH,FLORIDA CAPITAL PROJECTS
FISCAL YEARS 1995-1999 (Excludes Operational Expenditures)
WATER FUND ` J
COMMISSION TOTAL
PROJECT APPROVED ESTIMATED
DIV/SON/IMPROVEMENT NUMBER 1994-95 1995-96 1996-97 1997-98 1998-99 COST
ATLANTIC BEACH:
Encoded Register Meters(New) 291,732 291,732
Plans and Specifications for Water Treatment Plant#2 25,000 25,000
New Well Construction at Water Treatment Plant#2 75,000 75,000
Water Mains Installation 850,000 850,000
Water Trunk and Loop AB 1,250,000 1,250,000
Beach Avenue 337,293 337,293
AB Water Tank Project 525,000 525,000
City Property Meters 50,000 50,000
Corrosion Reduction WTP1 AB - 30,000 30,000
ATLANTIC BEACH SUBTOTAL 291,732 3,142,293 3,434,025
BUCCANEER/OAK HARBOR:
Enlarge and Rehab. Water Treatment Plant#3 550,000 550,000
Encoded Register Meters(New) 291,732 291,732
Cap off 3rd Well at Water Treatment Plant#4 20,000 20,000
Fence around Water Treatment Plant#4 5,000 5,000
Distribution System-Mayport Road 300,000 300,000
Water Mains Oak Harbor ______ 500,000 _ 500,000
BUCCANEER/OAK HARBOR SUBTOTAL 866,732 800,000 1,666,732
---------- ------
TOTAL WATER FUND j ___-1,158,464 3,942,293
- - _-.5,1.00757
I
4
CITY OF ATLANTIC BEACH,FLORIDA CAPITAL PROJECTS
FISCAL YEARS 1995-1999 (Excludes Operational Expenditures)
SEWER FUND
COMMISSION TOTAL
PROJECT APPROVED ESTIMATED
DIV/SON/IMPROVEMENT NUMBER 1994-95 1995-96 1996-97 1997-98 1998-99 COST
ATLANTIC BEACH:
3.0 MGD Expansion 3,293,754 1,000,000 4,293,754
Collection Projects Design 20,000 20,000
Sewer Mains Sea Oats Plantation 303,000 303,000
Collection Lines Upgrade 75,000 75,000
Lift Stations A-F Valve Replacement 27,500 27,500
Fairway Villas Lift Station Upgrade 45,000 45,000
Park Street Lift Station I Upgrade 40,000 40,000
Stewart Street Lift Station Upgrade 40,000 40,000
Sewer Main Rehab AB 2,604,500 2,604,500
Force Mains to Sewer Plant AB 150,000 150,000
Beach Avenue Sewer 456,815 456,815
ATLANTIC BEACH SUBTOTAL 3,321,254 4,734,315 8,055,569
BUCCANEER/OAK HARBOR:
Steel Catwalks Replacement 190,000 190,000
Replace Clarifier Weirs 34,500 34,500
Upgrade Electrical Service 35,000 35,000
Master Wetwell Construction 200,000 200,000
Sewer Rehab(Oak Harbor) 700,000 700,000
Instrumentation(Controls) 9,500 9,500
Additional Screen-Surge Tank 40,000 40,000
Sewer Main Rehab-Buc 600,000 600,000
Lift Station-Buc 120,000 120,000
0.65 MGD Expand Buc Sewer __ 1,115,000 _ 1,115,000
BUCCANEER/OAK HARBOR SUBTOTAL 309,000 2,735,000 3,044,000
TOTAL SEWER FUND 3,630,254 7,469,315 11,099,569
14 A
I
CITY OF ATLANTIC BEACH,FLORIDA CAPITAL PROJECTS
FISCAL YEARS 1995-1999 (Excludes Operational Expenditures)
StORMWATER UTILITY FUND W
COMMISSION TOTAL
PROJECT APPROVED ESTIMATED
DIVISON/IMPROVEMENT NUMBER 1994-95 1995-96 1996-97 1997-98 1998-99 COST
Jasmine Street Retention Pond Repairs 60,000 60000
Projects Related to 4th, 9th and Plaza Streets 60,000 60,000
Selva Marina Basin 'E" 1,071,423 1,071,423
Selva Marina Basin A"&"D" 284,227 284,227
Selva Marina Basin B' 774,000 774,000
Selva Marina Basin "C" 547,000 547,000
Selva Marina Basin'F" 194,000 194,000
Selva Marina Basin 'G' (includes piping ditch) 1,111,000 1,111,000
TOTAL STORMWATER UTILITY FUND I 120,000 1,355,650 774,000 1,852000 4,I01,650