Loading...
03-30-87 v AGENDA CITY OF ATLANTIC BEACH SPECIAL MEETING, MONDAY, March 30, 1987 Call to Order 1. Receipt of bid tabulations and recommendations on cleaning, televising and sealing of subsection "B" of the City's sanitary sewer system 2. Action by the City Commission on Waitz and Frye report "Economic Evaluation for Expansion of Wastewater Treatment Facilities" 3. Discussion by the City Commission on the desirability of accepting a four-foot easement for a sidewalk on the east side of Ocean Avenue at the end of Plaza 4. Receipt of report on status of Section H program involving larger parcels and acreage 5. Any other business Adjournment A MINUTES OF THE SPECIAL CALLED MEETING OF THE ATLANTIC BEACH CITY COMMISSION HELD AT CITY HALL ON MONDAY, MARCH 30, 1987 AT 6:00 P.M. Mayor Howell called the special meeting to order at 6:00 p.m. Those present were Mayor William S. Howell; Commissioners Robert B. Cook, Sr. , Glenn A. Edwards, and John W. Morris, Jr. ; City Manager, Richard C. Fellows,and City Clerk Adelaide Tucker. Commissioner William I.Gulliford arrived at 6:25 pm. The City Manager presented the Commission copies of the operating report for the Buccaneer Water and Sewer District covering the period October 1, 1986 - February 28, 1987 for their perusal. Mr. Fellows acknowledged receipt of an executed original of the Convention Development Tax agreement between the City of Jacksonville and the Beaches Communities. Estimated revenue could be approximately $25,000 annually. 1. Receipt of bid tabulations and recommendations on cleaning, televising and sealing of subsection "B" of the City's sanitary sewer system. Mr. Fellows reported bids were received and opened that morning at 11 :00 am Bid tabulation attached hereto and made a part hereof. Mr. Andy May, of Smith & Gillespie told the Commission they had reviewed and tabulated the five bids and recommended the contract be awarded to Pipe Inspection Services, of Birmingham, Ala. in the amount of the total base bid including additive alternate no. 1 for a total of $99,786.00. Commissioner Edwards moved to award the contract on cleaning, televising and sealing of subsection "B" of the city's sanitary sewer system to Pipe Inspection Services, of Birmingham, Ala. in the amount of $99,786.00 (total base bid including additive alternate no. 1) as per the recommendations of the Engineers. The motion was seconded by Commissioner Morris and carried unanimously. Commissioner Gulliford was not present to vote. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 2. Action by the City Commission on Waitz and Frye report "Economic Evaluation for Expansion of Wastewater Treatment Facilities". Commissioner Cook moved to pass over item no. 2 until the next regular meeting on April 13, 1987 to allow more time for review of the report. The motion was seconded by Commissioner Morris and following discussion carried unanimously. Commissioner Gulliford was not present to vote. * * * * * * * * * * * * * * * * * * * * * * * * * * * * 3. Discussion by the City Commission on the desirability of accepting a four-foot easement for a sidewalk on the east side of Ocean Blvd. at the end of Plaza. The owners of property located on Ocean Blvd.between 7th and 10th Streets are now developing their property, and Commissioner Cook had suggested Mr. Fellows discuss with them the possibility of acquiring a four foot easement for a sidewalk because of the very narrow right-of-way. The only problem would be an overhang on the 3rd story that would encroach into the rear yard 4' on one building and 31/2' on the other. The encroachment did not violate city Ordinances. Mr. Fellows reported he was meeting with Seaplace PAGE TWO MINUTES-SPECIAL CALL MARCH 30, 1987 Condominium Assoc.for discussion on the proposed side-walk. He hoped to run the sidewalk from Tenth street south and attempt to acquire right-of-way on the south of Mr. Hatcher to allow people to at least get to Club Drive on a sidewalk. They could then walk from Ocean Blvd. to Beach if the city could not acquire property from Mr. Lynch and Mr. Mastroainni. Commissioner Cook moved to accept the offer from Mr. & Mrs. Hatcher for a four foot easement on Ocean Blvd. between 7th and 10th streets for a side-walk. The motion was seconded by Commissioner Morris and carried unanimously. Commissioner Gulliford was not present to vote. * * * * * * * * * * * * * * * * * * * * * * * * * * * * Commissioner Gulliford arrived at 6:25 p.m. 4. Receipt of report on status of Section H program involving larger parcels and acreage Mr. Fellows reported he had received no report from the Engineers but he had been informed they were still trying to resolve the problem of computing the front foot on the large and irregular shaped parcels north of Levy Road. Mayor Howell recommended all work be ceased on the project until the Commission had received a clear understanding of the proposed assessment roll. Following a detailed discussion, the following motion was made: Commissioner Cook moved to authorize the Mayor to contact Bessent, Hammack and Ruckman, Inc. , Engineers for the Section H project, and request all work be stopped effective immediately. The Engineers be requested to submit to the city all plans completed to date along with an invoice for all work completed as of March 31, 1987. The motion was seconded by Commissioner Gulliford and carried unanimously. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Discussion was held on the status of the contract with Bessent, Hammack and Ruckman. Mr. Fellows reported on January 12, 1987 the city had awarded them a contract for $149,237.00 to prepare plans and specifications. No billing had been received on the contract. The firm had billed the city on the Special Assessment Roll $75,000 and possibly another $50,000 of the total committed amount of $150,000. Mayor Howell advised the Commission he would call for another Special Meeting as soon as possible after he met with the Engineers. There being no other business to come before C. i. :4on, Mayor Howell declared the meeting adjourned at 6:58 p.m. /% Wi / i-' " . 'owe 1 ATTE T: Mayor/Presiding Officer ? aid ker,City Clerk A ri c tI in 6NT 3/30 S 7 SEWER SYSTEM EVALUATION AND BID DATE: March 30, 1987 REHABILITATION PROGRAM, SUBSECTION "B" TIME: 11:00 a.m. EST S&G PROJECT NO. 8505-06-01 ATLANTIC BEACH, FLORIDA TABULATION OF BIDS Total Additive Total Base Bid, Alternate Including Contractor Base Bid No. 1 Additive Alternate No. 1 Bid Bond Altair Maintenance Services $ 98,866 $ 76,08() $ 173,946 OK Griners/A-1 Pipeline Services 85,810 31 ,300 117, 110 OK Pipe Inspection Services 65,906 33,880 99,786 OK Pollution Solution NO BID Southern Line Cleaning 102,730.50 52,750 155,480.50 OK Video Industrial Services 83,945.20 33,000 116,945.20 OK