Loading...
09-02-70 v MINUTES OF THE SPECIAL MEETING OF THE ATLANTIC BEACH CITY COMMISSION HELD AT THE CITY HALL ON WEDNESDAY, SEPTEMBER 2, 1970 AT 6 : 00 P. M. Present: William S . Howell, Mayor-Commissioner Arthur J. Longo, L. W. Minton, Jr. , Commissioners and R. C. Vogel, City Manager Oliver Ball, City Attorney Absent: R. R. Rosborough, Preben Johansen, Commissioners and Adele S. Grage, City Clerk (Vacation) The meeting was called to order by the Mayor-Commissioner, Mr. Howell. Mr. Howell advised that the meeting was called for the purpose of reviewing proposed Change Order No. 2 for the new ground storage reservoir and related facilities. Mr. Vogel pointed out that the order was for repairs to the roof section of the exist- ing reservoir. Such repairs were recommended by Mr. Walter J. Parks, Jr. , Engineer for this project, and subject order is attached hereto and made a part hereof. Mr. Minton moved that Change Order No. 2 in the amount of $1525.00 be adopted, seconded by Mr. Longo and carried. Mr. Longo moved that $1525.00 be the limit of the amount of money expended for this Change Order, seconded by Mr. Minton and carried. There being no further business, Mr. Howell declared the meeting adjourned. ,011111er.-74111- 10/. 'Ai_ Wi11 `a'! Ho .e 1, ayor-Co •�� ' - ioner Attest: Bettil an Barnes Assistant .City Clerk CH,.NGE e 2UE R NO. 2 to CONTRACT FOR New Ground Storage Reservoir and Related Facilities City of Atlantic Beach, Florida Engineer's Project No. 25-69 This Chance Order, when properly Executed by signatures of both the "Owner" and the "Contractor" on the date indicated hereinafter will increase the value of the original Contract executed by the two parties on January 14, 1970, in the net amount of $1,525.00 for (1) chipping away faultily bonded grout on the top surface of the "old" reservoir roof slab and sand blasting thoroughly the top surface or said slab to eliminate all traces of a previous coating material in order to achieve good bonding, and (2) applying two coats of Thoroseal water proofing as manufactured by the Standard Dry 4all Products to the top surface of said roof slab in full accordance with the manufacturer's instructions, in order to eliminate the leakage of water through existing temperature cracks and other minor existing faults in said roof slab, all in accordance with the Contractor's letter of proposal attache,' hereto. PREVIOUS VALUE OF CONTRACT $ 63,604.00 INCREASE IN CONTRACT VALUE BY THIS CHAN,3E ORDER $ 1,525.00 NEW CONTRACT VALUE: $ 65,12.9.00 Prepared and Approved by: WALTER J. PARKS, JR. ACCEPTED: CITY OF ATLANTIC BEACH, FLA. CONSULTING ENGINEER '► j 43c/,';. ./K(/ wilt m S. Howell Mayor 6.y „ ,44.,4„s, „Av.. v a1L' J P s, Jr. OWNER ACCEPTED: HARRIS & HARRIS, INC. By Charles J. Harris, Sr. President CONTRACTOR DATE OF ACCEPTANCE: S. -#4ARRIS & HARRIS, INC. PHONE: 737.2844 GENERAL CONTRACTORS P. 0. BOX 16326 2553 POWERS AVENUE JACKSONVILLE, FLORIDA 32216 JACKSONVILLE, FLORIDA 32207 August 28, 1970 City of Atlantic Beach R.C. Vogel, City Manager Atlantic Beach, Florida Re: Ground Storage Reservoir City of Atlantic Beach Gentlemen: We pleased to submit this proposal for repairs to the roof of the old reservoir. AREA TOTAL UNIT TOTAL ITEM COVERED COATS AREA PRICE PRICE X * Sandblasting 2500 - 2500 .31 $775.00 Painting 2500 1 2500 .21 $525.00 X Painting 2500 2 5000 .15 $750.00 The above prices reflect the use of Thoroseal Waterproofing as manufac- tured by Standard Drywall Products. Very truly yours, HARRIS & HARRIS, INC. By LLA- a A e Charles J Harris, Ir. CJHJr/jr cc: Walter J. Parks, Jr. • - Sand blasting to include chipping away faultily .'onded grout. X - Items recommended for acceptance. A Walter • . s, Jr. Consu in.�� ngineer.