Loading...
3 FY12Public Utilities BudgetPublic Utilities Budget Current FY Project Status Project Well No. 1 Rehabilitation Water Plant 2 & 4 Tank Repairs/Rehabilitation 11th St. Water Main Replacement Selva Marina Sewer Rehabilitation Donner Subdivision Sewer Rehabilitation (Grant) Replace Yard Station Equipment TMDL Project — Force Main TMDL — WWTP#1 Upgrades with Sludge & Odor Control Current FY Amount $51,026 $47,790 $120,000 Status Underway Underway Bidding $286,727 Complete $178,000 Bidding (Re -Bid) $40,000 Under Construction $1,403,656 $8,344,644 Complete Under Construction 11 TMDL Project Summary DEP Deadline Complete Construction Begin Operation of Upgraded WWTP Operational Level to Remove Nitrogen Attained 12/31/2012 3/31/2013 10/1/2013 Project Status Force main construction WWTP *1 Upgrades Sludge & Odor Control Construction underway, approximately 35% complete Complete Notice to Proceed 7/20/2011 TMDL Project Description • Consolidating two wastewater treatment plants to a single plant • Transferring flow from smaller plant with limited space and aging metal tanks to main plant with newer, large concrete tanks that could be modified for nitrogen removal • Used directional drilling technology for force main installation to avoid environmental damage and neighborhood disruption • Installing state-of-the-art equipment for electrical efficiency • Included more efficient, effective sludge treatment and odor control i TMDL Construction Cost Savings SJRWMD Grant of $1,000,000 Other funding with State Revolving Fund Loan with much lower interest rates Received excellent construction prices due to bidding while the market was right Major equipment procurement process resulted in excellent pricing for equipment TMDL Operational Cost Savings Consolidating treatment plants results in more efficient operations and cost savings New equipment is much more efficient, resulting in electrical savings Estimated operational savings is $34o,000/year Pro-rated savings in FY12 Budget is approximately $iio,000. New sludge treatment process will result in major savings in tipping fees if implemented by COJ Water Master Plan Status Some recommended projects have been delayed due to reduced funding, but progress still being made. Since the 2001 Plan we have: O Interconnected the Buccaneer 8z Atlantic Beach Water Systems • Added a 300,000 gallon elevated storage tank at Water Plant #2 • Replaced old cast iron water mains with new PVC mains in several areas of the City • Updated the Water Distribution System Model in 2007. • Constructed a new well and rehabilitated another well. II FM Water Master Plan Future Issues Continue with Well Evaluation, Rehabilitation, Replacement Continue replacing aging or undersized water mains Many major problem areas are complete. Fewer water breaks, combined with sewer rehabilitation improvements have reduced emergency issues. Staff suggested a reduction of one field position by not replacing a retiring employee. Water Loss Enhanced meter replacement program in FYii. Analysis of a small sample indicated approximate 5% payback. Accelerating program in FY12 to approximately 80o meters ($74,000) Will continue with annual leak detection and large meter testing and repair Water Capital Items for FY12 Interior rehabilitation of elevated tank at Water Plant#i- $40,000 Interior rehabilitation of ground storage tank at Water Plant #2 - $40,000 Recoat both ground storage tanks at Water Plant #3 - $60,000 Replace old water mains on 12th St. between Ocean Blvd. 8z Beach Ave. and on Ocean Blvd. between 14tn and 16th Streets - $200,000 2006 Sewer Master Plan Status Recommended lift station improvements have been completed (Lift Station E at 799 Mayport Rd. and Mimosa Cove Lift Station in FYio). Sewer rehabilitation in much of the Atlantic Beach system has been completed. Grant funding has paid for sewer rehabilitation in the Salt Air area, and another project being bid in the Donner Subdivision. i Sanitary Sewer Rehabilitation - Status at 2006 Sewer Master Plan 0- �- ar 0- z u gw z--- 20TH - a a 0 0 QST° R MEMOF IAL D LLARDU 0 1ISLANDI DUDLE' L IS ROB Rl ED LLE QR 19TH o w ❑ i9TH 2 � - I $ w w w =I F y 1 00D 0 'N \OPAL M 16Th j 16TH I 14TH 1 13TH 12114 80NlTA P 42A CLUB' PLAZAREDFlN A BTFV BTNI 0 , `� LM 6T y ? - m a`� 5TH m Y c m x�r._? o ° 0 • 7� 3 gym/ ■ 3'. n s N z e ., 2 9i'i1 STU IVAN . I ATj-AN1IB ' j ATLEEXLTMvo }9ILFYIII Sanitary Sewer Rehabilitation - Status FY 2011 Sewer Capital Items for FY12 Continue sewer rehabilitation in Area B (North of Core City) - $300,000