Public Works Budget FY1213_CMmodPUBLIC WORKS BUDGET FY 2012-2013 PW ADMIN STREETS FLEET MAINTENANCE PARKS MAINTENANCE and BEAUTIFICATION SANITATION STORMWATER 1 PW Manpower * 23 Full Time Positions 2 PW ROLES Admin – Program Management, Customer Service (Complaints, Plan Review) Streets – ROW maintenance, signs Building Maintenance – new division, doing more work in house with existing manpower Parks – Maintenance of green space, playgrounds, color spots Stormwater- Maintenance and minor repairs of stormwater treatment and conveyance systems. 3 PW ROLES Contracted Services: City Garage – Repair and maintenance of City vehicles, heavy equipment and small equipment Sanitation – Residential and commercial pick up and haul; part of one man-year budgeted for hauling C&D / yard trash collected by City Forces Greenscape – Non-Preserve Park and Beach access mowing, Maintenance of Atlantic Blvd, Flyover and Mayport Road Medians, Palm Tree Trimming Street sweeping, aquatic weed control, mosquito control, Repairs (joint with Utilities Dept)– Annual concrete, asphalt repair, point repair and electrical 4 Parks Projects Donner Park Improvements (CDBG Funded) Complete (parking lot should be done by 8/21) Veteran’s Memorial Park Phase 1 complete; fundraising for Phase 2 (Chaplains Memorial Garden) underway; no city funds in proposed budget Tideviews Canoe / Kayak Launch Complete ICW Parks Master Plan Study completed Approved by Commission April 2012 Design / Permitting for Dutton Island kayak launch and overlook and W. 6th Street overlook in budget Long range plan in budget 5 Convention Development Fund (Bed Tax) Resolution 91-5 authorizes use of funds to acquire and develop municipal parks, lifeguard stations and / or athletic fields or to promote tourism at the beaches. 6 MARSH MASTER PLAN LONG RANGE CAPITAL PLAN 7 MARSH MASTER PLAN LONG RANGE CAPITAL PLAN (continued) 8 MARSH MASTER PLAN LONG RANGE CAPITAL PLAN (continued) 9 MARSH MASTER PLAN LONG RANGE CAPITAL PLAN (continued) 10 Parks Topics Rose Park Conceptual plan to expand park by removing portion of Orchid St. from W. Plaza Dr. Commissioner Daugherty, et al., has met with residents in area to discuss proposed changes. Estimated Cost (Planning Level only – conceptual plan developed) Cost - $175,000 ($210,000 if restroom included). Includes: demolition and drainage mods to close Orchid, landscaping, pavilion, security lighting, picnic tables and grill, relocating playground, parking lot, resod playing field. Suggested improvements to conceptual plan from residents: Increase size of Playground / Make ADA compatible - ~$50,000 Add Water Feature (Splash Park) - ~$60,000 11 12 Stormwater Utility Capital Project History 1999-2002 – Core City / Sherry Drive – inverted crowns / baffle boxes 2001 – Dewees / Coquina Paving & Drainage 2003 – Jordan Paving & Drainage 2004 - George & Dudley Drainage 2005 - Ocean/13th to East Coast/12th Drainage 2007 - Ocean between 14th & 16th Drainage 2008 Hopkins Creek Regional Retention Facility Ardella Road Drainage Improvements 2009 – Royal Palms Drainage Rehabilitation 13 Stormwater Utility Stormwater Master Plan Update Complete Approved by Commission May 2012 Planned Capital Improvements Stormwater Long Range Plan FY 12-13 - East Cost Drive Drainage Improvement –to reduce flooding on Atlantic Blvd. - $360,000 FY 13-14 – Drainage Upgrades – Salt Air Neighborhood – restores original swale construction - $250,000 FY 13-14 – Drainage Upgrades – Seminole Road South End – to correct street / ROW flooding due to undersized storm sewer - $240,000 14 Stormwater Utility Maintenance Issues: Wet Ditch Maintenance – Funds budgeted to Contract for routine ditch maintenance, not responsive to emergency situations. Swale Maintenance – many dry swales not draining within prescribed 72 hours, City Forces to regrade, fix side drain issues. Point Repairs – Evaluating non-SWMP project problem areas, intend to tackle more by increasing City Staff efforts to reduce contracting costs (Crew Chief skill level). Construction Site Erosion and Sediment Control– no teeth in program, need Code rework to ensure compliance. Proposed Budget: Stormwater Fee Income: $680,430 Operations and Maintenance Cost: $630,736, Debt: $210,768 Capital Cost (ECD Project +) = $367,000 Capital funded by transfers from ½ Cent Sales ($320,000) and Gas Tax ($82,000) 15 16 Sanitation Fund Landfill Tipping Fees Estimate Cost of Landfill if fees had been paid 10/1/11 to 3/30/12 Garbage, Trail Ridge $29.87 $130,260 Yard Waste, OKR (ADS) $13.88 $15,312 Sludge, Trail Ridge $41.00 $53,417 Total – Six Months $198,989 Yearly cost (x2) $397,978 17 Sanitation Fund Yearly cost (x2) $397,978 Increased Cost to Atlantic Beach Present new commercial paid to COJ $50,000/yr Additional Cost to COJ $347,978 Additional Sanitation Fund Cost $241,144 Additional Sewer Fund Cost $106,834 $347,978 18 19 Gas Tax Fund Resurfacing Program FY 12/13 - $300,000 budget proposed: Overall Condition Index (OCI) – 73.6 (Very Good) Score has been maintained in 71-74 range since completion of Core City Project related resurfacing. Range: 1 segment – poor; 121 segments – excellent Total segments – 294 (public only) Pavement Management Scoring: Excellent = 85.01 to 100 Very Good = 70.01 to 85 Good = 55.01 to 70 Fair = 40.01 to 55 Poor = 25.01 to 40 Very Poor = 10.01 to 25 Failed = 0 to 10 20 PAVEMENT MANAGEMENT ROUGUE’S GALLERY Street Name Starting Point Ending Point OCI Pine Street Atlantic Blvd. Dead End 38.33 3rd Street Ocean Blvd Beach Ave 40.83 Oceanforest Drive W. Oceanforest Drive N. Oceanwalk Drive S. 42.08 Saturiba Drive Seminole Road Park Terrace West 42.08 Selva Marina Drive NB Seminole Road Saturiba Drive 42.08 David Street Seminole Road Past Sylvan Drive 42.50 Oceanwalk Drive S. Seminole Road Oceanwalk Drive W. 42.50 Violet Street Levy Road Cul-De-Sac 42.92 Magnolia Street David Street Sturdivant Avenue 43.33 Mary Street Stewart Street Dead End 43.33 W. Plaza Drive Orchid Street Mayport Road 46.25 Beach Avenue 16th Street 18th Street 46.67 Orchid Street Levy Road W. Plaza Drive 46.67 Stocks Street Levy Road Cul-De-Sac 46.67 W. 6th Street Begonia Street Main Street 46.67 W. 9th Street Camelia Street Begonia Street 46.67 Mealy Street S. Stewart Street Cul-De-Sac 47.08 Dutton Island Road W. Park Gate End of Asphalt 47.92 Jasmine Street W. 6th Street Cul-De-Sac 48.33 21 City Street Resurfacing History Since 2005 - 20% of streets resurfaced (10.4 / 50.7 miles) Annual Resurfacing Program = Green Royal Palms = Light Blue Other Projects = Blue New Development = Red 22 23 CDBG HISTORY “But for…” Criteria used in past. Typical projects have included: Sidewalks (Rose, Dudley, George, Jordan) Park improvements, including restrooms, playing fields, parking and shelters (Donner & Jordan) Septic to Sewer Conversions (05-06 & 11-12) Minor Drainage Projects (George, Dudley, Jordan N.) Builder’s Care home rehabilitation assistance – 5 homes (04-05 & 05-06) Water (Kestner & Begonia) and Sewer Main (Begonia) Installations Detailed history provided separately 24 TREE FUND Tree Adoption Program – No funds requested Dedicated Account – current balance - $3440 Over 1100 trees planted since 2002 Over $96,000 invested in tree canopy 25