Public Works Budget FY1314 handout 8-1-131
PUBLIC WORKS BUDGET
FY 2013-2014
PW ADMIN
STREETS
FLEET MAINTENANCE
PARKS MAINTENANCE
and BEAUTIFICATION
SANITATION
STORMWATER
GENERAL FUND
Streets and Maintenance –City Building,
ROW & Town Center maintenance.
Parks –Maintenance of green space,
parks -playgrounds, color spots, beach
cleaningcleaning.
Reconstruct Russell Park tennis courts 1 & 2.
Parks Master Plan.
PARKS
Parks Master Plan
Develop inventory of existing parks facilities and /
equipment
Public input regarding additional parks services and
amenities
How to pay for these added amenities.
2
Parks Projects
ICW Parks Master Plan
Design / Permitting for Dutton Island kayak launch
and overlook and W. 6th Street overlook
Design and permitting of Preserves Multi-Purpose
Path
Veteran’s Memorial Park
Phase 1 complete; fundraising for Phase 2
(Chaplains Memorial Garden) underway; no city funds in proposed budget
Parks Projects (cont)
Rose Park -Construction bid substantially over project
budget –project downscopedto meet funds available.
Additional funding to be discussed:
Add ADA compatible Playground -~$40,000
Add paved parking -~$20,000
AddWtFt(SlhPk)itht $160000Add Water Feature (Splash Park) with restroom -$160,000 -
$210,000
Add Pervious parking at Dog Park ~$10,000
Bull Park Gazebo (supplemental project list) -$40,000
Proposed modification to existing Memorial Circle to provide a
covered area for ceremonial (weddings, etc.) and event use
(Songwriter’s Night).
Would include relocating MedjoolPalm to elsewhere in park (or
replacing).
Supplemental Project List
Bull Park Gazebo (examples)
3
Convention Development Fund
(Bed Tax)
Resolution 91-5 authorizes use of funds to
acquire and develop municipal parks,
lifeguard stations and / or athletic fields or
topromotetourismatthebeachesto promote tourism at the beaches.
Designated as Primary source for City
matching funds for Marsh Master Plan
Projects
MARSH MASTER PLAN LONG
RANGE CAPITAL PLAN
YearProjectCostGrant
Funds
City Funds
FY 12-13 Construct PH 1A
of Marsh Ped
Path
$34,000$17,000$17,000
FY13-14 ConstructKayakFY1314Construct Kayak
Launch
and Overlooks
$223,000$128,500$94,500
Design and
Permitting of
Marsh PedPath
$150,000$75,000
(COJ)
$75,000
MARSH MASTER PLAN LONG
RANGE CAPITAL PLAN (continued)
YearProjectCostGrant
Funds
City Funds
FY 14-15P1 Trail;
Tideviewsto
W. 6th St.
$315,000$157,500$157,500
FY 15-16P2 Trail;Levy ;y
to Dutton
Island Rd.
$200,000$130,000$130,000
Overlook/
Kayak
Access
$30,000
14th St.
Overlook /
Access
$30,000
4
MARSH MASTER PLAN LONG
RANGE CAPITAL PLAN (continued)
YearProjectCostGrant
Funds
City Funds
FY 16-17P3Trail; W.
6th to Plaza$170,000$130,000$130,000
TideviewsTideviews
Pond, Trail$90,000
FY 17-18Dutton;
Overlook
Extension
$75,000$130,000$130,000
P4 Trail;
W. Plaza to
Levy
$150,000
W. 9th St.
Overlook$35,000
MARSH MASTER PLAN LONG
RANGE CAPITAL PLAN (continued)
YearProjectCostGrant
Funds
City Funds
FY 18-19W. 3rd St.
Overlook$28,000$14,000$14,000
Dutton
Overlook $75000Overlook$75,000
Pavilion
Begonia Pond
$105,000
FY 19-20Dutton
Concession /
Bathroom;S.
Launch
$175,000$102,500$102,500
Fishing
Platform and
Access
Improvements
$30,000
StormwaterUtility
Planned Capital Improvements
StormwaterLong Range Plan
FY 12-13 -East Cost Drive Drainage
Improvement -$360,000
FY 13-14 –Drainage Upgrades –Salt Air
Neighborhood –swale re-construction -
$250,000
FY 13-14 –Drainage Upgrades –Seminole
Road South End –$240,000
FY 13-14 Request –Francis Street Drainage Design
5
StormwaterUtility
Supplemental Project List
East Coast Drive Streetscape additions –to expand
Town Center appearance to ECD and Ahern -$65,000
Potential for financial participation by Town Center Agency / Businesses
Seminole Road Streetscape Additions -$250,000
Roberts Street Ditch -$180,000 (not on list)
1
2
Mi
l
l
i
o
n
s
Storm Water Utility Fund
0
Personnel Services Operating Debt Capital Transfers Revenues
Tipping Fees Claimed by COJ
FY 12FY13 Est. Total
Garbage $145,257 $143,375 $288,632
Commercial $125,585$116,701$242,286
Yard Waste$36,223 $28,812 $65,035
Sludge$90,740 $57,987 $148,727
Payments
Made
-$44,873 -$50,907-$95,780
Total$352,932 $295,968 $648,900
6
1000
1,500
2,000
2,500
3,000
Th
o
u
s
a
n
d
s
Sanitation Fund
0
500
1,000
Personnel Services Operating Capital Transfers Revenues
Gas Tax Fund
Resurfacing Program
FY 13/14 -$300,000 budget proposed:
Overall Condition Index (OCI) –73.6 (Very Good
(2012 score –inspections still in progress for current year)
Score has been maintained in 71-74 range since
completionofCoreCityProjectrelatedresurfacing.completion of Core City Project related resurfacing.
Current year paving completed.
City Street
Resurfacing
History
Si2005Since 2005
7
PAVEMENT MANAGEMENT
ROUGUE’S GALLERY
Street NameStarting PointEnding PointOCI
Pine Street Atlantic Blvd. Dead End 38.33
3rd Street Ocean Blvd Beach Ave 40.83
OceanforestDrive W. OceanforestDrive N. OceanwalkDrive S. 42.08
SaturibaDrive Seminole Road Park Terrace West 42.08
SelvaMarina Drive NB Seminole Road SaturibaDrive 42.08
David Street Seminole Road Past Sylvan Drive 42.50
OceanwalkDrive S. Seminole Road OceanwalkDrive W. 42.50
VioletStreet LevyRoad Cul-De-Sac 42.92Violet Street Levy Road Cul De Sac 42.92
Magnolia Street David Street SturdivantAvenue 43.33
Mary Street Stewart Street Dead End 43.33
W. Plaza Drive Orchid Street MayportRoad 46.25
Beach Avenue 16th Street 18th Street 46.67
Orchid Street Levy Road W. Plaza Drive 46.67
Stocks Street Levy Road Cul-De-Sac 46.67
W. 6th Street Begonia Street Main Street 46.67
W. 9th Street CameliaStreet Begonia Street 46.67
Mealy Street S. Stewart Street Cul-De-Sac 47.08
Dutton Island Road W. Park Gate End of Asphalt 47.92
Jasmine Street W. 6th Street Cul-De-Sac 48.33
*Streets in Red paved this year
300
400
500
600
Th
o
u
s
a
n
d
s
Gas Tax Fund
0
100
200
Operating Capital Transfers Revenues
Community Development
Block Grant History
“But for…” Criteria used in past.
Typical projects have included:
Sidewalks
Park improvements, including
restrooms, playing fields, parking and
shelters
Septic to Sewer Conversions
Minor Drainage Projects
Water and Sewer Main Installations
8
CDBG Projects
Current year project to add sidewalk on
Dutton Island Road delayed because of
stormwater issues.
Nextyear’sproject finalphaseofNext years project –final phase of
Donner Park improvements –baseball
field upgrades.
Possible future years –Francis Street
Drainage and Projects from Parks
Master Plan Study
400
500
600
700
800
900
Half Cent Sales Tax
0
100
200
300
Th
o
u
s
a
n
d
s
Transfers Operating Capital Revenues
Supplemental Project List
Mayport Corridor Improvements
ItemCost(Capital /
Maintenance)
Notes
Decorative
Crosswalks
$100,000 / $20
–33K / Yr
FDOT Maintenance requirement
Welcome Signs$11,000Dutton Island Rd(SB), Flyover
Ramp (E/N B), Southern Island
under Flyover (NB)
FRA Fountain
Project
$7,500 / $1,500Add decorative,lighted fountain
to pond at W.4th / 5th Street. FRA
$2,500 donation.
Art for Atlantic
Blvd Overpass
$8,000 (est.)Detailsin Planning Discussion
Landscape
Matching
Program
$0 / $10,000Detailsin Planning Discussion
9
Supplemental Project List
Public Works
ItemCost(Capital /
Maintenance)
Notes
Welcome Sign
Atlantic Blvd
$100,000Tat Chan Design
Emergency
Generatorfor
$50,000Portablegenerator to provide
powerforlongtermoutage.Generator for
PublicWorks
power for long term outage.
Pave Stewart
Street
$35,000West of Main St.-only platted,
residential streetnot paved.
East Coast Drive
Streetscape
$65,000Planning level estimate –paver
walks, streetlights, etc. to match
Town Center décor.
Seminole Road
Streetscape
$250,000Planning level estimate –paver
parking, streetlights, bioswales,
etc.
10
EAST COAST DRIVE / AHERN STREETSCAPE
Seminole Road Possible Streetscape
Typical Section
Plan
(Overhead)
View
Possible addition
of on-street
parking
11
Streetscape options –
decorative lighting and
crosswalks
BIOSWALE W/ SOD
12