Agenda Item 3ANovember 18, 2013 MEMORANDUM TO: The Honorable Mayor and Members of the City Commission FROM: Jim Hans i - .r age SUBJECT: Follow -up Report SALTAIR Drainage Project; Included in the City's approved FY 2014 budget for the Storm Water Fund is the reconstruction of the swale system in the SALTAIR Subdivision in the amount of $250,000. This project will reestablish the drainage swales that have been filled in since the original construction of the subdivision. Many of these and create blockages and the City has received complaints about yard and driveway flooding for several years. During the budget workshops earlier this year, the possibility of some neighborhood residents opposing the project was discussed. Some of them may have extensive work done in right of way in front of their houses, but have no flooding problems themselves. The filling in of one yard often causes for flooding upstream on other properties. AGENDA ITEM # 3A DECEMBER 9, 2013 It was concluded that the City would send out a survey to neighborhood residents to gage their support before the project is sent to bid. A mailed survey has been sent and results tabulated. Two hundred and nineteen surveys were sent out and 105 responses were received. Staff inadvertently sent surveys to residents and owners in four blocks in the neighborhood that would not be affected by the project, so the results were tabulated for the blocks that were affected versus those that were not. Of the blocks affected, 56 (80 %) of the owners and residents supported the project and 14 (20 %) opposed. A copy of the survey tabulation along with the questionnaire is attached to this report. Unless otherwise instructed by the City Commission, staff will proceed with this project and attempt to minimize the inconvenience to residents wherever possible. SALTAIR Drainage Improvement Project Survey Results AGENDA rr M N 3A DECEMBER 9, 2013 in r L4 0 p7 0 0 0 T C? 0 0 N Magnolia Street 0 Ca 0 0 David Street 0 Pine Street 4a 0 L El ICY Y 0 L) o41 CS 41 D 0 0 0 0 � m =0301 0 0 co 0 0 0 1.4 il 0 • N MI 1:) N 4 H 0 H Indicates Blocks that were inadvertently mailed a survey for the drainage system reconstruction. AGENDA ITEM # 3A DECEMBER 9, 2013 October 17, 2013 Property Owner Address Atlantic Beach, FL 32233 Subject: Survey of Support for Drainage System Reconstruction Dear Property Owner, The Saltair Subdivision was originally constructed with a system of roadside swales to allow stormwater to flow out of the subdivision. In many areas, the stormwater system no longer works as it was designed due to filling in of the swales. This results in standing water in many of the driveways on Magnolia, Pine and Poinsettia Streets as well as Sylvan Drive. The City of Atlantic Beach has budgeted funds to reconstruct the swale system so that it works as originally designed. However, this will result in the regrading of the right -of -way in front of many homes. The City will re -sod the areas after the regrading, but it will be the resident's responsibility to move any decorative plants that are in the right -of -way. This project is funded by the City and there will be no cost to the residents or property owners. Before moving ahead with this project, the City would like to have your feedback as to support or objection to the proposed improvements. Please fill -in the following survey information and return it to the City of Atlantic Beach in the enclosed stamped envelope. If you have any questions or need any additional information feel free to either call or e -mail Rick Carper, Public Works Director for the City of Atlantic Beach at (904) 247 -5834 or rcarper @coab.us. Thank you for your assistance. I am, Very truly yours, Jim Hanson City Manager I am the homeowner living in the Saltair Support the Project Do Not Support the Project Should the City of Atlantic Beach reconstruct the swale system in the Saltair Subdivision? Subdivision outside of the Saltair Subdivision I am the homeowner living in the Saltair I am a renter living in the Saltair I am a property owner living Subdivision Subdivision outside of the Saltair Subdivision