Loading...
4C - Bid Award East Coast DrainageCITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGE NDA IT EM If 4C MAR CH I 0, 20 l iJ AGENDA ITEM: Award Bid for East Coast Drive Drainage and Streetscape Im provements SUBM IITED BY: Rick Carper, P .E., Public Works Director ;t.c, Feb r uary 12, 2014 DATE: STRATEGIC PLAN LINK: 14. Stormwater Master Plan Projects. BACKGROUND: The purpose of this Stormwat er Project wa s to reso lve in termittent BUDGET: f looding at the East Coast Drive and Atlantic Blvd intersection caused by a too small storm pipe running from Atlantic Blvd to Ahern Street. Because of the construction required for a resolution meeting the City's Drainage Level of Service Standards while not c ausing new stormwater issues downstream (Sherry Drive), Staff proposed to include a Streetscape e lement to the project that would make East Coa st Drive off Atlantic and Ahern Street between East Coast and Ocean Drives match the exi sting Town Center Streetscape. Th i s proposa l w as approved and funding included in the FY 13-14 Budget. As initially designed, the bids for t his project were substantial ly over budget (lowest bid $612,000}. In November, t h e Comm i ss ion approved Staff's recommendation to reject all bids and authorized development of a reduced project to meet budget. The stormwater model of the revised proj ect shows that street f lood ing wi ll not occur through the 5 Year storm with water levels decreased from existing conditions for all storms. Bid 14-1213-12R was opened on February 12, 2014. There w ere four bids to construct the project. The low bidder was J.B. Co xwell Contracti n g at $221,856 .64, which includes a 10% contingency . Budget balance for the combined project for the East Coast Drive Drainage Improvem ents (PW 1306) and Streetscape Imp rovements (PW 1401) is $396,686. RECOMMENDATION: Based on bid analys is and favorable references, Staff recommend s the Commission approve awarding the contract to J.B. Coxwell Contracting and authorize the City Manager t o execute the Cont ract Documents on the City's behalf. AITACHMENTS : Bid Tabulation Sheet REVIEWED BY CITY MANAGER: _ __.-7 ......... '1 ..... ~ _.t"'-'-'"""<.._r .._r...-.x ......... <~c """"<------ BID 14-1213-12R Florida Infrastructure Required Documents Submitted in Triplicate X Document Requirements Checklist X Bid Form X Bid Bond in the Amount of 5% of Bid X Drug Free Workplace X Public Entity Crimes Statement X W-9 X Trench Safety Affidavit X New Vendor Information Form X Documentation of receipt of any addenda (only additional item posted to site was the NIA K-Mart Parking contact information.) .. ' .... Total (Base Bid Plus IO% Contingency $288,162.19 of Items I -32) Total (Base Bid & Additive Alternate $375,505.75 Bid Items, Plus IO% Contingency, Items I -32, 34 -42) Upon verification of bids, the following mathematical error were found: -': City of Atlantic Beach East Coast Drive Drainage Improvements· REBID Wednesday, February 12, 2014 Hager Construction X X X X X X X X X NIA ';,: 01 •,r; ' ,;;, :;. ; · .. ' >,' / ; S3i3,ooo.os . ,/, . .···· < ·• .. ,,,,; ; ... · ... ··. •;4'~. 5339,287 :8s • •· • .. . Hager consirilCti'Oniwr;tt.enamoulit tor BaS.. lull + canilnge~cvi$ $3i3,ooa.6o 10r i cl;lfeienceot .. ss: W~itton amountfor.Total Base Bid + Alter.nato +Contingency was'$332;204.40 for a'difference of$7,083;45 J.B. Coxwell Contracting X X X X X X X X X N/A $180,531.73 $221,856.64 Award of Bid based on Department Analysis and Commission Approval 3·00 PM W.R. Twonsend Contracting X X X X X X X X X N/A $353,908.50 $380,979.67