Loading...
8K - Eng. Design of Stormwater Imrpovements for SeminoleCITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT (\MENDflD AG ENDA IT EM fi8K MARCI-l I 0, 20 14 AGENDA ITEM: Engineering Design of Stormwater and Streetscape Improvements for Seminole Road South of City Hall (RFP #14-03) SUBMITIED BY: Rick Carper, P.E., Public Works Director /lC DATE: February 20, 2014 STRATEGIC PLAN LINK: 12. Stormwater Master Plan Projects BACKGROUND: The Public Works Department advertised a Request for Proposals (RFP) for Professional Engineering Services for Final Engineering Design for Stormwater and Streetscape Improvements for Sem inole Road South of City Hall (RFP #14-03), receiving five proposals. The firms that submitted proposals were, Ayres Associates; C&ES Consultants, CPH Engineers, Edward s Engineering, and Genesis Group . After staff evaluation, the top three firms were ranked In the following order: 1st -Genesi s Group 2 nd-Ayres Associates 3rd -Edwards Engineering Genesis Group was the top-ranked firm for several reasons. They were ranked at the top in two of the three major grading criteria (past similar experience and project approach). Their Project Team includes engineers who have significant experience in stormwater retrofits, and the most experience with streetscaping, providing multiple examples of recent projects similar to this project. BUDGET : The current budget contains $490,000 for Engineering, Permitting and Construction of the Stormwater and Streetscape Improvements for Seminole Road South of City Hall ($240,000 from Stormwater Account 470-0000-538-6300and $250,000 from Half Cent Sales Tax Account 131-5002-541-6300). RECOMMENDATION: Authorize staff to begin negotiations with the top-ranked firm, Genesi s Group, for engineering services for t he Sto rmwater Improvements for Stormwater and Streetscape Improvements for Sem inole Road South of City Ha ll. ATIACHMENT: Eva lu ation of Proposals Rating Sheet (Proposals are on file at the City Cle rk's Office) REVIEWED BY CITY MANAGER: __ /IJ-•_t_;'{;....;«;;....;..;;~;;;;........c~:.,_..::;dz__ _______ _ EVALUATION OF PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES Stormwater & Streetscape Improvements for Seminole Road RFP #14-03 Firm Proposed Past Similar Project References Project Team Project Approach Experience Scaled Value (25 %) (25 %) (25 %) (10%) Ayers Associates David Kemp -CM 6 QAIQC Brian McKee -PM 19.17 17.50 20.84 10.00 C&ES Consultants William Flick-PM 8 21.67 17.50 18.34 9.67 CPH David Gierach -PIC 9 Wade Olszewski-PM 20.00 16.67 15 00 9.00 Edwards Gray Edwards -PD 7 Engineering Gary Goldsberry -PM 20.00 17.50 20.00 10.00 Genesis Group G. Brian Wheeler-PIC 6 Mark Llewellyn- QAIQC James Sullivan -PM 20.00 21 .67 23 .34 9 .67 Financial Responsibility/ Insurance (10 %) Fi nancials-yes Insurance-yes 10 00 Financials-yes Insurance-yes 9.00 Financials-yes Insurance-yes 10.00 Financials-yes Insurance-yes 10.00 Financials-yes Insurance-yes 10.00 Proximity SCORE (5 %) 23.67 miles 82.18 4 .67 18 .12 miles 80.85 4.67 18.13 miles 75.01 4.34 10.39 miles 82.17 4.67 14.3 miles 89.35 4 .67 RANK 2"d 4th 5th 3rd 1st > ~ r:l z ~g >0 :;:::1> Qa -z:: -z .Po N> o _ -..., ... tTl ~ ""'