Loading...
4C- Dutton Island Road Sidewalk and Drainage Project CDBG 2014CITY OF ATLANTIC BEACH CIT Y CO MMISSION MEETI NG STAFF REPORT AGENDA ITEM tl 4C APR IL 14,20 14 AGENDA ITE M: Du Hon Isla nd Road Sidewa lk & Drainage Project: CDBG 2014 SUBMITTED BY: Rick Carpe r, P.E ., Public Works Director ILL. DATE: March 13, 2014 STRATEGIC PL AN LINK: CDBG Gran t Projects for Mayport Road Area Improvements BACKGROUND: Bids were opened for th e Dutton Island Road S idewa lk & Dra in age Project: CDBG 2014 (PW1 301) Bid 1314 -07 on Thursday March 6th . Pa rs Constru ction Services ($56,096 .15) and Co re Cons tr ucti on ($56 ,696 .00) su bmitted bids which were both within the authorized budget. CDBG projects require a ra tin g and ranking evaluation to determin e which contractor scores th e most points with price and Section 3 requireme nt s factored into award ing points . Th is scoring system is thorough ly discussed at the Manda tory Pre-Bid Meetings that occur for all CDBG projects. Staff met with CO J staff on March 12 to score and rank the two bi d s s ubmitted. Based on th e scoring cr iteria, Co re Construction rece ived 88.47 po ints and Pars Construction Services rece i ved 82 points . BUDGET: A total of $65 ,000 wa s budg eted In the FY 20 14 for this project (account 110· 5002-541-6300, PW1301 ). RECOMMENDATION: The Co mmission approve award in g th e contract for the project to Core Co nstruction and authorize th e City Man ager to exec ut e th e co ntra ct documents on th e City's beha lf. ATTACHMENTS: 1. Bid Tab 2. Sectio n 3 EValuation Scoring Sheet --?.A y; -1 RE VI EW ED BY CITY MANAGER: _ __;_ "'~~-'..:::G,...,:..;..;..L......;.;'?'":......l..<L:;:;;..·.....:v<._ _______ _