4-27-15 Atlantic Bch - Public Safety Bldg Study revisedPl
a
z
a
S
t
.
COMMISSION
CHAMBERS
North
PUBLIC SAFETY
BUILDING
MUNICIPAL
OFFICES
CREEK
PARKING
PARK
ORIENTATION
Atlantic Beach Public Safety Building
ORIG. SITE STUDY
Pl
a
z
a
S
t
.
F.D.
SERVICE
EXISTING AREA
P.D.
FIRE DEPT. = 4,950
POLICE DEPT. = 5,550
TOTAL = 10,500
15 PARKING SPACES
2
15 PARKING
SPACES
5,550
Atlantic Beach Public Safety Building
ORIG. SITE STUDY
Municipal Offices
F.F.E. 9.31
Commission
Chamber
F.F.E. 9.39
Police / Fire
Departments
F.F.E. 9.36
Pl
a
z
a
S
t
.
100 YEAR FLOOD ELEVATION 6.7 FT.
500 YEAR FLOOD ELEVATION 8.0 FT.
POLICE DEPARTMENT
EXISTING FINISH FLOOR ELEVATION (FFE) IS :
1.36 FT. ABOVE 500 YEAR FLOOD ELEVATION
2.66 FT. ABOVE 100 YEAR FLOOD ELEVATION.
6.7 ft.
8.0 ft.
FLOODING
3
5,550
Atlantic Beach Public Safety Building
ORIG. SITE STUDY
1,527 S.F.
5,550 S.F.
5,730 S.F.
EXISTING = 5,550 s.f.
NEW = 7,257 s.f.
TOTAL = 12,807 s.f.
13 PARKING SPACES
SERVICE
POTENTIAL ADDITION
1 - STORY
4
1,527
5,730
5,550
13 PARKING
SPACES
STORM WATER TANK
BELOW PARKING LOT
Atlantic Beach Public Safety Building
ORIG. SITE STUDY
SITEWORK 1.5 AC. $ 165,000
EXISTING 5,550 X 112 = $ 621,600
NEW 7,257 X 208 = $ 1,509,456
TOTAL = $ 2,296,056
ONE STORY COST MODEL
5
1,527
5,730
5,550
Atlantic Beach Public Safety Building
ORIG. SITE STUDY
6
START SCHEMATIC DESIGN ( CONCEPTUAL & ADVANCED SCHEMATIC DESIGN
KICK-OFF MEETING _ CONFIRMED PROGRAM AREAS
SITE / BUILDING INVESTIGATION
ASBESTOS ABATEMENT
SITE SURVEY
GEOTECH INVESTIGATION W/ ADDITIONAL STUDIES
ELEVATION STUDIES
DESIGN MEETINGS
Atlantic Beach Public Safety Building
7 Atlantic Beach Public Safety Building
5,370 sq. ft.
EXISTING BUILDING
4,750 sq. ft.
8 Atlantic Beach Public Safety Building
PROPOSED SITE PLAN
RELOCATED
MARQUEE SIGN
9
5,136 sq. ft.
Atlantic Beach Public Safety Building
1,465 sq. ft.
5,370 sq. ft. PROPOSED ADDITION/ RENO
4,750 sq. ft.
10 Atlantic Beach Public Safety Building
PROPOSED MEZZ. ADDITION/ RENO
11 Atlantic Beach Public Safety Building
FRONT ELEVATION
SIDE ELEVATION
12
SITE WORK 165,000
EXISTING 5,550 X 112 = 621,600
NEW 7,257 X 208 = 1,373,008
TOTAL $ 2,296,065
CONSTRUCTION COST MODEL
Atlantic Beach Public Safety Building
ORIGINAL STUDY SCHEMATIC DESIGN
165,000
5,370 X 116 = 622,920
6,601 X 217 = 1,432,417
TOTAL $ 2,220,337
PROJECT COST
13
SOFT COST
SITE SURVEY 2,100
SOIL BORINGS 3,500
A/E FEES 7.5% 172,204
CM PRE DESIGN FEES 1% 22,961
HARD COSTS
COST OF CONSTRUCTION 2,296,056
START UP COST
FUNITURE, FIXTURES & EQUIPMENT 90,000
TOTAL PROJECT COST 2,586,821
TOTAL PROJECT COST
Atlantic Beach Public Safety Building
ORIG. SITE STUDY / SCHEMATIC
2,100
5,700 + 2,200
175,256 + 3,052
22,961
2,220,337
90,000
2,516,354
ORIGINAL STUDY SCHEMATIC DESIGN
14 Atlantic Beach Public Safety Building
4.13 SCHEMATIC DESIGN PRESENTATION
CM SUBMITTED
4.27 SCHEMATIC DESIGN APPROVAL
CM - SELECTION