Seminole Rd. Bike Lanes (Plaza to Hanna Park) 8-17-15 AWES MEMORANDUM ASSOCIATES To: Doug Layton, PE From: Daryl Myers Date: August 8, 2015 Project No.: 67-0228.01 Re: Seminole Road Bike Lanes This memorandum is being generated at the request of Doug Layton to determine the feasibility and costs of adding 4-foot bike lanes on Seminole Road from Plaza Street to where the road ends at Hanna Park. Seminole Road is a two lane rural roadway with a posted speed of 25 MPH within a right-of-way that varies from 90 to 100 feet wide. The clear zone is 10 feet based on Table 3-12 in the Manual of Uniform Minimum Standards for Design,Construction, and Maintenance for Streets and Highways (Florida Greenbook).The road serves mostly residential properties that are in the northern limits of the City of Atlantic Beach and was assumed to be a local Collector. To prepare this memorandum we visited the site to identify impacts to the existing signs,trees, drainage, driveways, utilities, and right-of-way. Enclosed with this memo are typical sections showing the proposed improvements and plan sheets with aerials and photographs taken during the field investigation. The anticipated impacts with adding the bicycle lanes on this roadway include: • Existing single post sign relocation • Existing mailbox relocation • Existing tree removal • Existing utility relocation • Existing driveway reconstruction • Existing sidewalk reconstruction This project will have two different typical sections that can be further broken into three distinct segments that are described below. Breaking the project into segments will allow for phasing of construction based upon budgeting. Segment 1—Plaza Drive to 16th Street This segment is approximately 3,185 feet in length. The pavement width in this segment is 20 feet consisting of two 10 foot travel lanes.Widening will occur on each side of the road to add the 4 foot bicycle lanes. There is approximately 90 feet of 6 foot wide sidewalk at the beginning of the project that will have to be replaced because the widening will put the bike lane adjacent to the sidewalk. There is sufficient width to shift the sidewalk out toward the right-of-way line. This segment will utilize Typical Section#1 presented in the concept plans. There is sufficient right-of-way within this segment to construct the proposed improvements without the need for acquisition. Segment 2—16th Street to 18th Street This segment is approximately 2,200 feet in length. The pavement width in this segment is 22 feet consisting of two 11 foot travel lanes. The lane width can be reduced to 10 feet in each direction which will limit the widening to 3 feet on each side of the street to add bicycle lanes on this segment. This segment will utilize Typical Section#2 presented in the concept plans. There is landscaping on the west side of the road in this segment and there is also an irrigation system for the landscaping. There are two backflow preventers for the irrigation system that will end up within 1 foot of the edge of the bike lane Page lof2 File:l:\67-0228.01(seminole road)\04 design data\bike lane memo_final.docx Hire 1 `f/tI 5200 Shad Road,Suite 200-3•Jacksonville,FL 32257 904.260.6288•Fax:904.262.5536•www.AyresAssociates.com that would need to be relocated.There is a drainage ditch on the west side of this segment that conveys water from south to north and gradually gets deeper as you move further north. The ditch is well maintained, however,on the northern end of the ditch the banks are starting to erode due to the steep side slopes. A new sheet pile retaining wall would be installed throughout this segment to accommodate the pavement widening, provide the required clear zone, and stabilize the ditch side slopes. There is an existing water main and force main throughout this segment that will remain. The new sheet pile wall will be installed to avoid any conflicts.There is sufficient right-of-way within this segment to construct the proposed improvements without the need for acquisition. Segment 3—18th Street to Oceanforest Drive N This segment is approximately 5,109 feet in length. The pavement width in this segment is 22 feet consisting of two 11 foot travel lanes. The lane width can be reduced to 10 feet in each direction which will limit the widening to 3 feet on each side of the street to add bicycle lanes on this segment. This segment will utilize Typical Section#1 presented in the concept plans. There are a significant number of private driveways and mailboxes that will be impacted due to widening. The private driveways will require a significant amount of reconstruction due to the grade differences between the road elevation and the driveway elevation. There are also a number of landscape features that will be impacted with the addition of bike lanes. The bike lanes could be ended at Oceanforest Drive N as there would be a limited amount of users further to the north and there will be no further development beyond that point. There is sufficient right-of-way within this segment to construct the proposed improvements without the need for acquisition. Estimate of Probable Cost Based on the information presented above the overall probable construction cost to provide bike lanes throughout this project is$3,501,919. A more detailed breakdown of the construction costs are presented following the concept plans. Probable Construction Cost Segment 1—Plaza Drive to 17th Street Construction Costs $145,394 Design/CEI Costs $29,079 Contingency $36,349 Subtotal $210,822 Segment 2—17th Street to 185h Street Construction Costs $1,912,232 Design/CEI Costs $382,446 Contingency $478,058 Subtotal $2,772,736 Segment 3—18th Street to Oceanforest Drive N Construction Costs $357,490 Design/CEI Costs $71,498 Contingency $89,373 Subtotal $518,361 TOTAL FOR SEGMENT 1,2&3 $3,501,9119 Page 2 of 2 File:l:\67-0228.01(seminole road)\04 design data\bike lane memo_final.docx 67-0228.01 R/W LINE rR/W LINE R/W VARIES(90'- 100') I I I €EXIST ROADWAY ICY –, CLEAR ZONE CLEAR ZONE 4' !0' !0' _ 4' _ BIKE TRAVEL LANE TRAVEL LANE BIKE LANE LANE _VARIES EXISTING PAVEMENT VARIES VARIES I 3-4' (20'-27) 3-4' I SHLDR. SHLDR. PAVT. /� PAVT. Natural Ground 0.02 ———--—— 0.01 Natural Ground TYPICAL SECTION NO. I 5220 SW Rood " CITY OF SHEET AIRES50705200-J �/ SEMINOLE df[l 9'OLE d\D�l./ J 041260/62 Florida 32257 !. ,4tYamtle&ae_ NO. f9WJ260-6288 ', 76164, ASSOCIATES No.4356 of A00nonzollon , DEPARTMENT T WAY AND GROUNDS BIKE LANE FEASIBILITY I MAINTENANCE DIVISION ncF eel, 7/2/2015 2:0001 PM 7:567-0229.0)(Se'r.:nole RoadA04 Design Dala\Plans\TYP5R001 DON R/W LINE- If–R/W LINE R/W VARIES(90'- 100) EXIST ROADWAY I 10' 10' 10 CLEAR ZONE CLEAR ZONE _ 4' 10 10 _ _ 4' BIKE TRAVEL LANE TRAVEL LANE BIKE LANE LANE 3' EXISTING PAVEMENT 3' SHLDR. 2Z SHLDR PAVT. PAVT. Natural Ground 0,02 ——————— 0.02 Natural Ground 6' PROPOSED SHEET PILE WALL TYPICAL SECTION NO. 2 5220 Shod Rote OF SHEET AVRES Sidle 200-3 Jacksomll 1 32257 (9041260-6288-fi288 t ustee&_a- ,a SEMINOLE ROAD NO. ASSOCIATES Certificate o)Authorization 4j DEPARTMENT OF PUBIC WORKS BIKE LANE FEASIBILITY RIGHT-OF-WAY AND GROUNDS 2 MAINTENANCE DIVISION mckeeb 7/2/7015 2:0002 PM L.567-0228.01(Seminole Road)\09 Design Dala\Plans\TYPSRDOI.OGN I 3h Lu +Qa H LIJ CC H SIDEWALK WILL NEED TO BE RELOCATED BIKE LANE WILL BE ADJACENT TO THE SIDEWALK. N CLOSER TO THE RIGHT-OF-WAY IN THIS AREA. Q N 5 a ,...$.4-4:°.- r-, v a? l 0- -.g a 0.,,...k, ' , e �" x y t� rC `8i- m.tr. "' ,ttp _ fA'ed. •;y,x+ ., r s. ..Y ed : ', - _� f s • u .- 'k� f y Ir r HG x FJ r, - v wk r ■w g�� li a-4 e 44100Ab. t I • ■ ti I Fj � • � .t N< � I • ,, �,. .� ,, '", ' 7r a '- }!' • +•kr. 5• . 1— W W W W W W CC CC CC H I- I— In Ln Ln 2 2 2 I- I- I- O .—I NOTE:YELLOW LEVEL IN APPLICABLE PHOTOS IS 4 FEET IN LENGTH FOR REQUIRED PAVEMENT WIDENING REFERENCE. MIES5220 Shod Rood CITY OF SEMINOLE 7Tg7 L [�,l,E/� SHEET Suite 200-5 !7/__�J. Ly E['d![1tlOLL' d OAD NO. Jartmnvllle,Florida 22257 A, — 701441• fSD1/280-6288 " ,.. . - ASSOCIATES NPr4J561B or Aulhorizdlbh DEPARTMENT OF PUBLIC WORKS BIKE LANE FEASIBILITY RIGHT-OF-WAY AND GROUNDS 3 MAINTENANCE DIVISION .. x')12015 2:00.06 PM 0067 0228.01 I5em,nale RoadA04 Design Da)a\Plans\Plan,001.dgn I , / C7 Ci QP Q t y a 1-'i't7,--. :r 9 .,. nT J6 t':, ._.+ i. r a I exj �VL ... - 'rn ' P 4— At'i •' *64.i.: • E�.i E' " ^Y 4• --7"x14 CY":1F'4" ` 1 ' ,'"°--, .v�.. + �� :r'u`.`s, w i J { 1FFi'!) .;p r •. .!'"1.„:* x9 ' /•^ 4.1,-- I'd."' �` k s 'p7.A .gyp•: ,7.',lr fir., _.,`4 _ a i , 4 _ a � a s .. ,��t , ice' � �.... .r sit L tr. ' ak-, k. 'j''' IV i`I,�'gF '+'+�, `' �:c'. -_ ►l T ,.',,="::. :- '4 r /.1: _e 3 N� `' r �' ,t;. , •>.•∎,*48,4, ` ft/(7c f''. f `• ro _ `. y . a . '. ! y: Ar �I ``4. f t.,=+.} o - * - s'Sn 31'- f`1-9 �C - �.Ft t`1 f--i �� .0 iarCg a _� .. r isr- �„ y '` "u4,„. ,..,-.1 / +: _ } is t B {'r ,t - tr ry , ~ 4 � ` 4 � �. • v -0 )" :fas .,r 9 j J A` • f b� _�• T - a` a• t•>r,' t4' a�rkr. `° .✓'G 'w t t �. +.. _ /• 'i''' �� r �, Iul -n.' i. ( Y4. 7 .73• •x'.' j tea.., .iy • ' a j t`. l' ..y: t , 0 .7- 5220 Sled Rood CITY OF SHEET Sidle 200-3 1� JocksomIlle 5(904)260-628rorldo 32257 14LY* eee &ze4 - 7 •Q SEMINOLE ROAD NO. (9 0 91 260-6288 ASSOCIATES Cergjlfe of AUHgrIZOIIOo DEPARTMENT OF PUBLIC WORKS BIKE LANE FEASIBILITY RIGHT-OF-WAY AND GROUNDS 4 MAINTENANCE DIVISION mlkee0 ..,,,, 2:00:16 PM L\67-0226.01(Seminole Road)504 Oes■gn Dala\Plans\Plan,002.0on w � co J { Lu % .L" T� is " .a', aT ,� -14 ' cc H . # F it H cc Z 1 '��' .S-< �yo- caz D 0 EXISTING DITCH WILL REQUIRE A SHEET EXISTING BACKFLOW PREVENTER AND IRRIGATION I U PILE WALL TO ACCOMODATE THE BIKE LANE WILL NEED TO BE RELOCATED IN SEVERAL LOCATIONS. AND STABILIZE THE SIDE SLOPES. N. y� Ill}}} " p-� m i c� dG L �} 4 ic F I t s+�.' --!'. •r, ,r _ T , �w � s V " a '4e°s • r- 2 •H± _,,., ,. c . ".t ^ t* [ i r . _ '^ rt fig s t. : ? . : t•s . + 'Wi LL, � �•u . ^ry,: -,,,,,,,,,,e-l j -:;',`,::,,14,� � l''',-. 0.0'.•_ '�+-'e' �,`.' „y. \4i 't A .�▪ . a ^ �V 6 . 1.--,,,,,:. -,�: �. , ,i .a 2 ' •?¢ m„. ,. .gi �- , .r ¢ . _. ..: •.. ` ^ ` : . .4 Pk1RS = a }`Af +r . r,��j PXy1%». `s." ' -,i, `' � � � : y • � ,•'` ' er _.. ' : 6 - a ;l, f�>< + ... ;i' - . - . ceti. -'x.; d ,. . •". . Nw,- , 'r'° -♦ •r L,.,.',,, .r'< -- w - ,%" r L6 7 •5. AAA �} � t s0� l: :fitJ b Y. I ' , 4 '-Y "7 t °�.,l �it 1 .E: • W W Ill W CC CC W W K Cr to N ~ _ J J Ln -I W Q 2 ■ _ I Ln U f 5220 Shod Rood CITY OF SHEET SOUS Z00 J SEMIN®�� ®�� AYRE 5 .IL Ue,Florldo 32257 )' Aleturee read _ 7,G7tda 1 V NO. (9041 260-6288 ASSOCIATES CYoer�jl 7e 07 AulhorlZotIon DEPARTMENT OF PUBLIC WORKS BIKE LANE E FE q� gBILITy RIGHT-OF-WAY AND GROUNDS ld �s L�'di 171J 1L%7 d 8 5 MAINTENANCE DIVISION cx,ee 7/2/2015 2:00'29 PM L:\67-0228.01(Seminole 0000)\04 Design Da'a\Plans\Planr003dgn _ I' V" ■ w ELI CC SINGLE POST SIGNS WILL NEED TO BE RELOCATED. TREES WILL NEED TO BE REMOVED. L) •2 I- 00 V ,•. rl. .. E ..•. f y k x.:. ffi ;f-. t �l °.:w�I' '' c `:. r r - 'Av,p.:. `, . r 4••) .J tq z"._" ' X 2 • Y i1 4 F t,'�» . # .: , •-i' v "� f: ! s �� { 9.3 ,yi,' '• s to 4 "# L I; • _ sf ';..�K,�. ;_, Y �:t .roc r■ :r s � Tfai -. �i4 . . 4 0 •,.< ,4., ate..�.`�w"� ....-'''" , .....'11111 .r ''' o a ,.- '• "�K-' :a- 'IA t'' L S,a .', •;. t i'• k 1 * ^ ',i,=.''.,', ,,,..i., 'A r:,, „.44,—I, ' ' ,, .',,,.; 1 .,.h - ♦ ^*....'v+' a� .. c 4 ..4::"..'r'''v D i� Y! 4 Y - ( 'Y F.,..r s t..'1. .;+r;44i'-'46;r r sin afx". Y J .. ,.. 4,, i ti, fit, . , . 4- " I �A ; p Fe'°k -J -A t 1. A, Fk J i1 ` ,w v T F s ; 'xiL �'irt 4 �� � 4r a� , sv YYMI�, . �s�..}9.w1 i3 � f— r _ _�, : i . r l r q 1 /r Yr8 �,. 'A_4 • — ... , Ili W it a:.er '_-7 CC I- V) 5220 Shod Rood CITY OF SHEET Sulre 200 J ��p,��R7®�y. ®�� Jocksorxnle,F/orldo J2257 _ "I4Kue r — -j 1 d 1 @' L NO. 1904/260-6288 ASSOCIATES H�rgj 18 07 Au1A0/Iz°"°" ��: DEPARTMENT OF PUBLIL WORKS gy 7/��v ��p7[v F q 71Ty]/p ]Fig+g)• RIGHT-OF-WAY AND GROUNDS Ll/1 di L�'ds di lL 1L%�lldill d Y MAINTENANCE DIVISION 6 mtkeeb 7/2/2015 2:00:41 PM L:\67-0228.01!Seminole Roa01/04 Des,gn Data\Plans\Planr004.dgn 1° = 100 w I— Z w CC I— Z (n w 0 I I— rn a . yr✓ i P s �r =.;. i ;:,� �. 'K• d �; .�` 'OVA A• •• >w4 t o'T 4 .. ' '. @ '§ M I{' .. [. i` •; .' J c - ' - 1 J :Ir ... q t Y e 1 ' 7j 4 ,t? .y... .Lt "•,.. ro : S z,� ,�• 's$.. u;. � as -� ,c `v r5 `.S A ' .i. s', L" Y ~ ~fi 2! 4 � l ',. •=N ♦"'s 1 ,. � T4°^�r� N,k:. f% • , Ry y x A. `- y x M � 'tl � j t r � � . �.. 2 .. L,.,.: tvL-.. ir' ..-P,. - `''`r .6' AVa:'y k i 9i t ''41 r 4itio 1 i l " r ir a yt . pa. ^. r f .. °9 as lr i- w Q w Z w C O I— w w — O m U S U Q w m 5220 Shod Rood -- CITY OF SEMINOLE ROAD SHEET AYRE r Suite200-J /',v;�-. SE:°dl[10'®LE ROAD 7 (004)260 6J Rartdo 32257 W — NO. f5W1260-6288 I\_� 7"�• ASSOCIATES Noer�jlr�Wte of AuthorIZoltoo DEPARTM ENT OF PUBLIC WORKS BIKE LANE FEASIBILITY RIGHT-OF-WAY AND GROUNDS 7 MAINTENANCE DIVISION mc,eeb 7/2/2015 2:0054 PM L.\61-0228.01(Sea ino&e Road1\00 Design Data\Plans\Planr005.0yn L. .1° = 100 L11 w Z H a Q W J Z H Z w U) w O I d Q CC H Q -j e'^. ,u4,E 1. , ^"� ::',..i.:•.• } _ `:,. .,.. -^ a Y I ''-,, 9 A,t aR'u mi +n _ � y@[�i �yyuu$}Y� "T 1�S } • T f V ,.[ �i.`n4i.a 0.Y' !. ..y. .yl „. .:,, -. . ...,. . , _ w ra� 3, i ,+ e f e§ hv".A, .- „ r x".+4e-s: ,., .:.r” .! '• "dr ' yam, . .tx.., S .� 2 � �r, ar yam $y.. a_; � � ..is w 2i I e' .� p,. ,11:,;,.."..t �. 1±i''^W -#,>a_`. , ,�'^"• ,4 dt .!, t'. i :'y ,r -t:A.,,,, —46e, ,� p� 3 ''1!M:',..•*'• ,t • ',,I.'- •'r. '� `;.G. err. ,._ ,, r .-t< # .,4 .Cs ... ak.,i: '4 H IL w w K Z N a I J H O o N U Z ..t^a lttt 5220 Shod Rood CITY OF SHEET Sul(e 200-3 �j.I_ �,,'_ �EL'`g li.'VT®LE ROAD NO. 5 JacfwMfde,Florida 32257 TLLCRRLGG %� a (904)260-6288 /�/° LANE FEAST;,Q� ]� ]� ]��° ASSOCIATES Nof 4356(8 of AUI prIZOfJO ` DEPARTMENT T OFAND GROUNDS ��6° �� ° °° °� '/� \ _ 8 - MAINTENANCE DIVISION mc.rcC 7/2/2015 201:06 PM L:\67-0228.01(Seminole Road)\04 Design Data\Plans\Plenrd064gn T trG p CC 0 H Y U1 J w Q SEVERAL DRIVEWAYS WITH LANDSCAPING SIDEWALK WILL NEED TO BE RELOCATED 0 FEATURES WILL BE IMPACTED IN THIS AREA. CLOSER TO THE RIGHT-OF-WAY WHERE IT 0 Z MEANDERS UP NEAR THE ROADWAY. Z Q Q w w U U O O • a I Z r.`r • r„-- -u r )1' 3• w.w.. r { .,r• e b �C .r” :-- '' s ': r•Yt"`�rs;+ s„Na*aa CAP Y w t. 7./ :ZZ ',17 t7 e n nr w a '9 ',r a 4 slt•t M ..-_. _-.> . -- 14 # lt, - .-.,-, -- - - . - :- rin* ', ' . , , . ,.,-. . • pY S( A y":"t,., 1 k 4 1 ! p I t r b yK , T Y I • I , .ti k K ,� r � a• w w > > o p w = O U , - . in Q Q CC IL LU U 0 O ..•' 1111 Z ` ray=- - -x. 4' K 1 :S.P''} I. t.. 4,. ,' r k' 5220 Shod Rood CITY OF SHEET Suite 20.7-3 pq 7/7� r D ES (904)2 0-6 Florida 32257 te4K e4— 74/441, �'El d1110TOLd�i ROAD NO. (904260-6288 I ASSOCIATES Certificate or Authorization DEPARTMENT OF PUBLIC WORKS BIKE LANE FEASIBILITY RIGHT-OF-WAY AND GROUNDS (), MAINTENANCE DIVISION ...EeC 7/2/2015 2:01.17 PM I:\67-022B.0)(5e,mnole 7000)\04 Design 0ata\Plans\PIanr007.0gn d� ' I '- Asa° "1� f ,, " 1 '`{ 'r L yy t is'4 t.« ,•r°,r, rns. ,p., V• .,er: N,.::...„...„:„,.,,,, :44_,:!,..,,„. ..,.�• ;. ;t. �1`,,.` e' #, - s.,,.F ,'�r....'� • ".1, ?,,i, ^,. .,:--° P.P.. ^t; , -a{.At :.f V.f� .a t:* 's'{.4., .,'.;.• t. ' °=Ai ,• ,g+• i :` 4 N`i I", :t. . ,' .•- "!4 �,.. .s �4C?....`r'f' .k-:.: ".is` t Av.<`4r'`. ,1 4 c4.-,:. +e A* <:,'� •y�. �` b� �'.e t,�r� ��..+kg� •�� � °.�.•. fE„ts�6�. � X: V6j` !, a,+ c� '�;�r`�?E`�w'� �'� +`�;_ •• • .;k .tag._",,iw4 `�•_'.' s - `- i ^f'• <wfd _ %`a - ,tr+i•I ''�- :y`f'A... "� x• .'•i y ?t, .',i s, s< 4 'F + x-r.T'." �#,.,. �' '* ti - t• 14::' Cry'' °� .Tk' 7- a.' • µ i $�,_+ -cr;, i.t '.dC:• +`a� w ,�-;.sL C _ � �.,as �n�'�*ray �� t � 'Kr 'td�'>�' F - 's�.'m�"��l'i''���'.�..A� f - - + a;,.. `, ��r ,,y�y; ��� � .�h . ...... , t,t ^- 'x 'Sd`4 ,-. .. ;' •.,+ .. t„!,'d'• x.ys' a _ �a £'!, �;•-. .a +r ';: " _ - '` °� HANNA PARK ,. e „ -„1;.,.. ,.•:. :'. A. ., ,-. ,a .. a._r 4,..' ,. 4..14 »_,z, • r x -^. ..I ,+, s y,:. 1 is.p •r ,@ .s t. ' , Ie�:.Y, ,d r ."r - K, , �c,�§ o..' � :...1.r.?' , t•. �cn.+`�'�'• •`J; ',V rFF"'vy- .�+' '4.. if }., '".fi2: ;•�„ n , a.;.. ,Y .; ! .. . -Ap- ,q •VFd k,A,l,ly-,� S.,r- E r r"., :r' 4 r«' i i• ., .,�.. Y,b..�.J,. - ... a. -,.,". ?� `�''E' . h «-,-.,- .e ,�. a •1 R� ;��.., r" 'fir s.t• A. ,x _z,r.,. • .:G '"' ,,, g7 �� . ,7 fit, � `,s t w �,a.... 1 ..g,-a`, raV. ,s4 .II s1,3° '• 8d ":eS•:y.�f:f +r,. ,:f� _ 1. ., .' {`' c }. - e, �.., ?�4 •FrAi. + r: ,„. s.. .•. ••... ..., ../_. ¢, .: ;-.•s � t !. a• .. .•.Jt is ata ,� %" : '•.T, .e, �;+" 4�ty,. gg j� y. u, �:v ..- ;.,.* V (. ♦.:±, "j:?a�;... ,.. � ., ' •,m5 ,�C,• '" •�F'. � ,y.� �:fi,{ A.." ','4',ti �yE`. "'� in p'_41,4 ON rt 4.i ,.-,;. '`' .:'• ':•:L,."•• u . } b . 4a e l `t 1. 'i`r? d,kyy sr;. ,• :�,r ;=a 4 s yr...; I c 3 �4r -a<,. "-a,b,r - s"''`� i' ;•�, 1..i . :tCC+F�h-' ti •'4' .$ y,'L�., i '<'F., o,„:•:V 1, ." ''i l�� _��y���_`, `;4- 4 '.�" """' 's' s.,r.`9F`'- ?t'r,".; .41. .a�•• . ,� :°`4 ,'„�'. +,I •h.4 r•#L7:r'�ad -1�ili1.,...,C.z,a ,t x r .....• _ -. . ,- _ ..... _ __— ..z 5220 590 Rood CITY OF SHEET MRE MP Suite 200 3 �/������ ��_�/ NO. JaUsarxl!!e,Fla:lda 32257 GKi4[4,Ci — �Crtl,�V� SE=a 'V•OL ROAD (504/260-6288 f-. ASSOCIATES N0.4356 18 0(A 1�O11Z0IlOn DEPARTMENT OF PUBLIC WORKS ii 7��� LANE p7� ��v m 7r/, rP 7rTY RIGHT TENAYANDGRGUNOS 11 $s /Lf71L V'ga dsA 11 11LI 6 �O MAINTENANCE DIVISION mr.eeo 7/2/20)5 2:01 26 PM L:567-0228.01(Seminole Roa0P.04 Design Data\Plans\Planrd08.dgn SEMINOLE ROAD BIKE LANES SEGMENT 1-PLAZA DRIVE TO 16TH STREET OPINION OF PROBABLE COST ITEM ESTIMATED NUMBER DESCRIPTION UNIT QUANTITY UNIT PRICE ESTIMATED AMOUNT 104-10-3 Sediment Barrier LF 6370.0 $ 1.42 $ 9,045.40 104-18 Inlet Protection System EA 4.0 $ 90.20 $ 360.80 110-1-1 Clearing and Grubbing LS/AC 1.2 $ 11,100.00 $ 13,320.00 110-4 Removal of Existing Concrete Pavement SY 258.0 $ 27.30 $ 7,043.40 120-1 Regular Excavation CY 786.0 $ 8.00 $ 6,288.00 160-4 Type B Stabilization SY 2831.0 $ 2.50 $ 7,077.50 285-706 Optional Base Group 6 SY 2831.0 $ 16.50 $ 46,711.50 334-1-13 Superpave Asphaltic Conc,Traffic C(1.5") TN 234.0 $ 92.00 $ 21,528.00 522-1 Concrete Sidewalk&Driveways,4"Thick SY 60.0 $ 36.00 $ 2,160.00 570-1-2 Performance Turf,Sod SY 1238.6 $ 2.50 $ 3,096.50 700-1-11 Single Post Sign,F&I,Less Than 12 SF AS 4.0 $ 317.00 $ 1,268.00 700-1-50 Single Post Sign Relocate AS 11.0 $ 165.00 $ 1,815.00 710-11-111 Painted Pavement Markings,Std,White,Solid,6" NM 1.2 $ 938.00 $ 1,134.98 710-11-160 Painted Pavement Markings,Std,White,Message EA 5.3 $ 35.00 $ 185.50 710-11-160 Painted Pavement Markings,Std,White,Arrows EA 5.3 $ 24.00 $ 127.20 SUBTOTAL $ 121,161.78 101-1 (Mobilization(10%) I LS I $ 12,116.18 102-1 Maintenance of Traffic(10%) LS $ 12,116.18 SUBTOTAL $ 145,394.14 (Engineering Design(10%) I LS I $ 14,539.41 Engineering Inspection(10%) LS $ 14,539.41 SUBTOTAL $ 29,078.83 Contingency Amount(25%) I L5 I $ 36,348.53 TOTAL $ 210,821.50 SEMINOLE ROAD BIKE LANES SEGMENT 2-16TH STREET TO 18TH STREET OPINION OF PROBABLE COST ITEM ESTIMATED NUMBER DESCRIPTION UNIT QUANTITY UNIT PRICE ESTIMATED AMOUNT 104-10-3 Sediment Barrier LF 4400.0 $ 1.42 $ 6,248.00 104-18 Inlet Protection System EA 4.0 $ 90.20 $ 360.80 110-1-1 Clearing and Grubbing LS/AC 0.2 $ 11,100.00 $ 2,220.00 110-4 Removal of Existing Concrete Pavement SY 153.0 $ 27.30 $ 4,176.90 120-1 Regular Excavation CY 407.0 $ 8.00 $ 3,256.00 120-6 Embankment CY 57.0 $ 10.00 $ 570.00 160-4 Type B Stabilization SY 1467.0 $ 2.50 $ 3,667.50 285-706 Optional Base Group 6 SY 1467.0 $ 16.50 $ 24,205.50 334-1-13 Superpave Asphaltic Conc,Traffic C(1.5") TN 121.0 $ 92.00 $ 11,132.00 400-4-11 Conc.Class IV,Retaining Wall CY 295.0 $ 920.00 $ 271,400.00 455-133-3 Sheet Piling Steel,F&I SF 35820.0 $ 35.00 $ 1,253,700.00 570-1-2 Performance Turf,Sod SY 1711.0 $ 2.50 $ 4,277.50 700-1-11 Single Post Sign,F&I,Less Than 12 SF AS 4.0 $ 317.00 $ 1,268.00 700-1-50 Single Post Sign Relocate AS 11.0 $ 165.00 $ 1,815.00 710-11-111 Painted Pavement Markings,Std,White,Solid,6" NM 0.8 $ 938.00 $ 778.54 710-11-160 Painted Pavement Markings,Std,White,Message EA 7.3 $ 35.00 $ 255.50 710-11-160 Painted Pavement Markings,Std,White,Arrows EA 7.3 $ 24.00 $ 175.20 1080-17 Utility Fixtures,Adjust&Modify EA 12.0 $ 335.00 $ 4,020.00 SUBTOTAL $ 1,593,526.44 101-1 (Mobilization(10%) I LS I $ 159,352.64 102-1 Maintenance of Traffic(10%) LS $ 159,352.64 SUBTOTAL $ 1,912,231.73 (Engineering Design(10%) I LS I $ 191,223.17 Engineering Inspection(10%) LS $ 191,223.17 SUBTOTAL $ 382,446.35 Contingency Amount(25%) I LS 1 $ 478,057.93 1TOTAL $ 2,772,736.01 SEMINOLE ROAD BIKE LANES SEGMENT 3-18TH STREET TO OCEANFOREST DRIVE OPINION OF PROBABLE COST ITEM ESTIMATED NUMBER DESCRIPTION UNIT QUANTITY UNIT PRICE ESTIMATED AMOUNT 104-10-3 Sediment Barrier LF 10218.0 $ 1.42 $ 14,509.56 104-18 Inlet Protection System EA 4.0 $ 90.20 $ 360.80 110-1-1 Clearing and Grubbing LS/AC 0.7 $ 11,100.00 $ 7,770.00 110-4 Removal of Existing Concrete Pavement SY 2400.0 $ 27.30 $ 65,520.00 110-7-1 Mailbox EA 41.0 $ 126.00 $ 5,166.00 120-1 Regular Excavation CY 946.0 $ 8.00 $ 7,568.00 120-6 Embankment CY 1703.0 $ 10.00 $ 17,030.00 160-4 Type B Stabilization SY 3406.0 $ 2.50 $ 8,515.00 285-706 Optional Base Group 6 SY 3406.0 $ 16.50 $ 56,199.00 334-1-13 Superpave Asphaltic Conc,Traffic C(1.5") TN 251.3 $ 92.00 $ 23,119.60 522-1 Concrete Sidewalk&Driveways,4"Thick SY 10.0 $ 36.00 $ 360.00 522-2 Concrete Sidewalk&Driveways,6"Thick SY 1780.0 $ 41.00 $ 72,980.00 570-1-2 Performance Turf,Sod SY 3974.0 $ 2.50 $ 9,935.00 700-1-11 Single Post Sign,F&I,Less Than 12 SF AS 4.0 $ 317.00 $ 1,268.00 700-1-50 Single Post Sign Relocate AS 29.0 $ 165.00 $ 4,785.00 710-11-111 Painted Pavement Markings,Std,White,Solid,6" NM 1.9 $ 938.00 $ 1,819.72 710-11-160 Painted Pavement Markings,Std,White,Message EA 17.0 $ 35.00 $ 595.00 710-11-160 Painted Pavement Markings,Std,White,Arrows EA 17.0 $ 24.00 $ 408.00 SUBTOTAL $ 297,908.68 101-1 $ 29,790.87 Maintenance of Traffc(10%)102-1 lS $ 29,790.87 SUBTOTAL $ 357,490.42 (Engineering Design(10%) LS $ 35,749.04 Engineering Inspection(30%) LS $ 35,749.04 SUBTOTAL $ 71,498.08 Contingency Amount(25%) I LS I $ 89,372.60 TOTAL $ 518,361.10