Mason Dudley - 4-11-16 • Maadre.
10///6
Jack Russell Park
Junior T- Ball Field Improvements
2016 EAGLE SCOUT PRC
'��4 BOY SCOUTS OF AMERICA � +Jn
•
Jack Russell Park
Junior T-Ball Field Improvements
Personal Background :
- I started in Scouts as a Tiger Cub when I was 6.
- I have played baseball since I was 4.
- I have been playing ball at Atlantic Beach since
2010.
- I was a part of the Tides All Star team - we won State.
- I am Freshmen at Atlantic Coast H .S . currently playing
for Atlantic Coast Varsity Team .
BOY SCOUTS OF AMERICA
Jack Russell Park
Junior T-Ball Field Improvements
Project Justification :
- The field is used by 3-5 year olds.
- There is no boundary to keep them in the field .
- There is no boundary to keep others out of the
field during practices and games.
- The fence will help keep pets (and their waste)
off the field
• ` 4 BOY SCOUTS OF AMERICA
Jack R u s s e I I Park Arid View of Jack Russell Park with Possible Playable field Options
r e ?
Junior T-Ball Field Improvements
Picture Demonstrates: . . 34
- Proposed outfield fence location l _ "
.r,
•
+/- 100 from home plate
- Open Space not large enough to
fit other field options
.i...t.„71 A' ,
.
<_ Football(360'it 1$O) Laaosk{3OO x 901
Pop warnerfclag Football(W x s4'1 Jr T-bal Field(1CV at carne )If In White
4 t tit
.. '1 BOY SCOUTS OF AMERICA i
Nate/•
Jack Russell Park
Junior T-Ball Field Improvements
Fencing Examples:
1r,al
a•vie
ma joy ,rosaar
1111.1111.11
o
NV
r
i
�
, BOY SCOUTS OF AMERICA
Jack Russell Park
Junior T-Ball Field Improvements
Proposed Improvements:
- Complete the fencing around the outfield
- 4 ' tall chain link fencing, about 260 ' long - to match
existing
- The outfield fence would be about 173 ' long
and would be about 35 ' from the clay
- Install 2 gates for access
BOY SCOUTS OF AMERICA A .t
Jack Russell Park
Junior T-Ball Field Improvements
.,, , IMMINNIIMIMM=1111
9.5'x 4'galvanized chain 2 @$119.00
link double gate2 $119.00 $ 238.00
Cost Summary. 8 hin 4 @$ 4 $ 7.83 $ 15.66
Hardware sets 2 @$17.83 2 $ 17.83 $ 35.66
50'roll 4'galvanized chain- 5 @$57.00
link fabric 5 $ 57.00 $ 285.00
32 poles $ -
post caps 6 @$1.75 6 $ 1.75 $ 10.50
line•ost e e to• 32 @$1.57 32 $ 1.57 $ 50.24
carria•e bolt 20 pack 1 @$6.20 1 $ 6.20 $ 6.20
aluminum chain-link fence
ties(30 count packs) 20 @$3.75
20 $ 3.75 $ 75.00
tension bands 30 @$.96 30 $ 0.96 $ 28.80
tension bar 6 @$3.76 6 $ 3.76 $ 22.56
260'of top rail 26 @$8.87 26 $ 8.87 $ 230.62
to.rail sleeves 26 @$2.33 26 $ 2.33 $ 60.58
top rail ends 2 @$1.47 2 $ 1.47 $ 2.94
12 ba•s of concrete 12 @$3.98= 12 $ 3.98 $ 47.76
Wheel barrel Supplied by volunteers
Shovels/hand tools Supplied by volunteers
Water for concrete Supplied by Atlantic
Beach $ _
"come along" Supplied by my
grandfather $
Post hole digger/auger Rented$59.00/4 hours
or$84/day 1 $ 59.00 $ 59.00
Refreshments Supplied by my family
to thank our volunteers.
$ „ v►-rr
Delivery $ 100.00
dfr-
BOY SCOUTS OF AMERICA 7%bSatlesTax Estimate $1,288.88
$ 88.88 .40
,.,
Nips" Total Estimate $1,358.66
+
Jack Russell Park
Junior T-Ball Field Improvements
Schedule:
- Approval by Atlantic Beach, April 11 ( Pending)
- BSA Approval by April 22 (estimated )
- Fund raising, expect to complete by May 31
- Installation, July (pending Atlantic Beach schedule)
- 2 days with 10 boys and 4 adults to monitor for safety
r
4 BOY SCOUTS OF AMERICA `