Loading...
102 Aquatic Dr #101 energy calculations REVISED 10/12/17 CITY OF ATLANTIC BEACH 800 Seminole Road OCT 1 2 2017 Atlantic Beach,Florida 32233 mss' lC�'SFa-�_ lZq�-ul REVISION REQUEST / CORRECTIONS TO PLAN REVIEW COMMENTS L Date 16112- Revision to Issued Permit / Corrections to Comments Permit# I� Project Address �-J\ C- Contractor/ Contact Name iD af- i Jo Phone Nocl - 3c�-? - &'3Z-o Email Description of Proposed Revision' /Corrections: Permit Fee Due Vl / Additional Increase in Building Value $ 0 Additional S.F. (� By signing below,I DCtio 1,JCf SSyr orl affirm the Revision is inclusive of the proposed changes. (printed name) lair z /i 7 Signatu Contractor/Agent(Contractor must sign if increase in valuation) Date (Office Use Only) Approved K Denied Not Applicable to Department Revision/Plan Review Comments_ De ment Review Required: Building l Planning & Zoning Reviewed By Tree Administrator Public Works Public Utilities Public Safety hate Fire Services uocuoign tnvelope IU:1i4U413tS4-UtSJ1-444U-bVUU-yrt$AZSHUUb/r/ FORM R405-2014 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2014 Florida Building Code, Energy Conservation via the residential Simulated Performance method shall include ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report(1 page) and an input summary checklist that can be used for field verification (usually 4 pages/may be greater). ❑ Energy Performance Level(EPL) Display Card(one page) ❑ Mandatory Requirements(three pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report(usually one page) ❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed Form R405 Duct Leakage Test Report(usually one page) EnergyGauge®-USRRPB v5.1 9/22/2017 1:29:48 PM Page 1 of 1 uocuaign tnvelope IU:(,4u4lJt$4-urs61-444u-bs)UU-!JttSAt$AUUS/r/ FORM R405-2014 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: Aquatic Townhomes-Bldg 1-Unit 101 Builder Name: Tribridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach, FL, Permit Number: Owner: TriBridge Residential Jurisdiction: Duval 261000 Design Location: FL,MAYPORT_NS County:: Duval(Florida Climate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2500.9 sqft.) Insulation Area 2. Single family or multiple family Multi-family a. Frame-Wood,Exterior R=13.0 1702.90 ft2 b. Frame-Wood,Common R=13.0 573.00 ft2 3. Number of units, if multiple family 1 c. Frame-Wood,Adjacent R=13.0 225.00 ft2 4. Number of Bedrooms 2 d.N/A R= ft2 5. Is this a worst case? No 10.Ceiling Types (802.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 601.00 ft2 6. Conditioned floor area above grade(ft2) 1469 b.Knee Wall(Vented) R=19.0 201.00 ft2 Conditioned floor area below grade(ft2) 0 c. N/A R= ft2 11. Ducts R ft2 7. Windows(251.2 sqft.) Description Area a.Sup:Attic,Ret:Garage,AH: Garage 6 100 a. U-Factor: Dbl, U=0.30 251.17 ft2 SHGC: SHGC=0.25 b. U-Factor: N/A ft2 12.Cooling systems kBtu/hr Efficiency SHGC: a.Central Unit 40.1 SEER:14.00 c. U-Factor: N/A ft2 SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Heat Pump 31.3 HSPF:8.20 SHGC: Area Weighted Average Overhang Depth: 0.000 ft. Area Weighted Average SHGC: 0.250 14. Hot water systems 8. Floor Types (939.0 sqft.) Insulation Area a.Electric Cap: 50 gallons EF:0.950 a.Slab-On-Grade Edge Insulation R=0.0 601.00 ft2 b. Conservation features b. Floor over Garage R=13.0 338.00 ft2 None c. N/A R= ft2 15. Credits Pstat Glass/Floor Area: 0.171 Total Proposed Modified Loads: 45.19 PASS Total Baseline Loads: 45.72 1 hereby certify that the plans and specifications covered by Review of the plans and 01'tKE STq?� this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliance DOCII$1 �. GEN3F Michael L. Berry, PE �� ]8393 '. with the Florida Energy Code. PREPARED BY: i�ll�CL= Before construction is completed DATE: 09-22-2017 :' STAT OF :u this building will be inspected for FE42C51&�2b4R IOP;•1� � ONgIEN�`�� compliance with Section 553.908 9/22/2� �' es. Florida Statutes. I hereby certify that this building, as designed, is in compliance �i. with the Florida Energy Code. COD WIE t4� OWNER/AGENT: BUILDING OFFICIA DATE: DATE: < < 4%-4 - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.2.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and starting July 1, 2017 this project requires an envelope leakage test report with envelope leakage no greater than 7.0 ACH50(R402.4.1.2). - Compliance with a proposed duct leakage Qn requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with Section 803 of RESNET Standards, is not greater than 0.061 Qn for whole house. 9/22/2017 1:29 PM EnergyGaugeO USA-v5.1 -Section R405.4.1 Compliant Software Page 1 of 5 uacuolgn Gn Velupe IU:1J4u41.3o4-ut3131-4,F4u-t5tluu-`Jr DABHVuD/r/ FORM R405-2014 PROJECT Title: Aquatic Townhomes-Bldg 1-U Bedrooms: 2 Address Type: Lot Information Building Type: User Conditioned Area: 1469 Lot# 101 Owner: TriBridge Residential Total Stories: 3 Block/SubDivision: Bldg1,Unit 101 #of Units: 1 Worst Case: No PlatBook: Builder Name: Tribridge Residential Rotate Angle: 0 Street: Permit Office: Duval Cross Ventilation: County: Duval Jurisdiction: Duval 261000 Whole House Fan: City,State,Zip: Atlantic Beach, Family Type: Multi-family FL, New/Existing: New(From Plans) Comment: Aquatic Townhomes(Building 1-Unit 101) CLIMATE IECC Design Temp Int Design Temp Heating Design Daily Temp Design Location TMY Site Zone 97.5% 2.5% Winter Summer Degree Days Moisture Range FL,MAYPORT NS FL MAYPORT NS 2 39 90 70 75 1037 61 Medium BLOCKS Number Name Area Volume 1 Block1 1469 15057.3 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 Whole House 1469 15057.3 Yes 3 2 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatio Whole House 94 ft 0 601 ft2 ---- 0 1 0 2 Floor over Garage Whole House ---- ---- 338 ft2 13 0 1 0 ROOF / Roof Gable Roof Solar SA Emitt Emitt Deck Pitch # Type Materials Area Area Color Absor. Tested Tested Insul. (deg) 1 Gable or shed Composition shingles 1088 ft2 274 ft2 Dark 0.92 No 0.9 No 0 30.3 ATTIC V # Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 300 939 ft2 Y N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic(Vented) Whole House 30 Batt 601 ft2 0.11 Wood 2 Knee Wall(Vented) Whole House 19 Batt 64 ft2 0.11 Wood 3 Knee Wall(Vented) Whole House 19 Batt 75 ft2 0.11 Wood 4 Knee Wall(Vented) Whole House 19 Batt 62 ft2 0.11 Wood 9/22/2017 1:29 PM EnergyGauge®USA-v5.1 -Section R405.4.1 Compliant Software Page 2 of 5 UUGUJIgn GnVU10pe IU:1,4U41,504-UMJ 1-444U-t5yUU-yrt5A25AUU5/t'/ FORM R405-2014 WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below Ornt To Wall TypeIn Ft In Area RA/allie Fraction Ahqrir 'rnrie% 1 S Exterior Frame-Wood Whole House 13 26 0 9 0 234.0 ft2 0.23 0.5 0 2 E Neighbor Frame-Wood Whole House 13 12 9 9 0 114.8 ft2 0.23 0.01 0 3 E Garage Frame-Wood Whole House 13 3 10 9 0 34.5 ft2 0.23 0.01 0 4 N Garage Frame-Wood Whole House 13 11 3 9 0 101.3 ft2 0.23 0.01 0 5 W Exterior Frame-Wood Whole House 13 30 6 9 0 274.5 ft2 0.23 0.5 0 6 N Exterior Frame-Wood Whole House 13 4 6 9 0 40.5 ft2 0.23 0.5 0 7 N Garage Frame-Wood Whole House 13 9 11 9 0 89.3 ft2 0.23 0.01 0 8 E Neighbor Frame-Wood Whole House 13 14 8 10 6 154.0 ft2 0.23 0.01 0 9 E Neighbor Frame-Wood Whole House 13 6 0 10 6 63.0 ft2 0.23 0.01 0 10 E Neighbor Frame-Wood Whole House 13 17 4 10 6 182.0 ft2 0.23 0.01 0 11 N Exterior Frame-Wood Whole House 13 26 0 10 6 273.0 ft2 0.23 0.5 0 12 W Exterior Frame-Wood Whole House 13 38 1 10 6 399.9 ft2 0.23 0.5 0 13 S Exterior Frame-Wood Whole House 13 26 0 10 6 273.0 ft2 0.23 0.5 0 14 W Exterior Frame-Wood Whole House 13 9 5 8 0.16 75.5 ft2 0.23 0.5 0 15 S Exterior Frame-Wood Whole House 13 11 10 8 11 105.5 ft2 0.23 0.01 0 16 W Exterior Frame-Wood Whole House 13 3 0 9 0 27.0 ft2 0.23 0.5 0 17 E Neighbor Frame-Wood Whole House 13 6 7 9 59.3 ft2 0.23 0.01 0 DOORS # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 S Wood Whole House None .4 3 6 8 20 ft2 2 N Wood Whole House None .4 3 8 24 ft2 3 N Wood Whole House None .4 3 8 24 ft2 WINDOWS Orientation shown is the entered, Proposed orientation. Wall Overhang V # Omt ID Frame Panes NFRC U-Factor SHGC Area Depth Separation Int Shade Screening 1 S 1 Metal Low-E Double Yes 0.3 0.25 64.0 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 2 W 5 Metal Low-E Double Yes 0.3 0.25 64.0 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 3 N 11 Metal Low-E Double Yes 0.3 0.25 31.2 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 4 N 11 Metal Low-E Double Yes 0.3 0.25 14.7 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 5 W 12 Metal Low-E Double Yes 0.3 0.25 30.2 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 6 S 13 Metal Low-E Double Yes 0.3 0.25 32.0 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 7 S 13 Metal Low-E Double Yes 0.3 0.25 15.1 ft2 0 ft 0 in 0 ft 0 in Drapes/blinds None 9/22/2017 1:29 PM EnergyGauge®USA-v5.1 -Section R405.4.1 Compliant Software Page 3 of 5 UOcUJIgn tnvelope IU:G4U413ti4-Uti31-444U-t3UUU-9t-bAbAUUb/t-/ FORM R405-2014 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation 1 492 ft2 492 ft2 35 ft 9 ft 1 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000456 1756.7 96.44 181.37 .4881 7 HEATING SYSTEM # System Type Subtype Efficiency Capacity Block Ducts 1 Electric Heat Pump Split HSPF:8.2 31.3 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit Split SEER: 14 40.1 kBtu/hr 1575 cfm 0.8 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.95 50 gal 80 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model# Collector Model# Area Volume FEF None None ft2 DUCTS / ----Supply---- ----Return---- Air CFM 25 CFM25 HVAC# V/ # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 Attic 6 100 ft2 Garage 73.5 ft2 Proposed Qn Garage ---cfm 90.0 cfm 0.06 0.60 1 1 9/22/2017 1:29 PM EnergyGauge®USA-v5.1 -Section R405.4.1 Compliant Software Page 4 of 5 UOcuSlgn tnvelope IU:U4U41364-Ut331-444U-t 9UU-9t-tfAbAUUS/r/ FORM R405-2014 TEMPERATURES Programable Thermostat:Y Ceiling Fans: Coolin Jan ]Feb Mar Apr May [X Jun X Jul Au Se Oct Nov Dec Heating JanlFeb Mar Apr f May [ Jun Jul 4 Aug �Xj SeP Oct Nov X Dec Ventin Jan [ ]Feb Mar [X]A r [ Ma [ Jun Jul [ Au Se [X]Oct Nov [ Dec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 9/22/2017 1:29 PM EnergyGauge®USA-v5.1 -Section R405.4.1 Compliant Software Page 5 of 5 UocuSign tnvelope IU:64041384-0 131-4440-B906-9F-BA8A005/r! FORM R405-2014 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 99 The lower the EnergyPerformance Index, the more efficient the home. Atlantic Beach, FL, 1. New construction or existing New(From Plans) 9. Wall Types Insulation Area 2. Single family or multiple family Multi-family a. Frame-Wood, Exterior R=13.0 1702.90 ft2 b. Frame-Wood,Common R=13.0 573.00 ft2 3. Number of units,if multiple family 1 c. Frame-Wood,Adjacent R=13.0 225.00 ft2 4. Number of Bedrooms 2 d.N/A R= ft2 10.Ceiling Types Insulation Area 5. Is this a worst case? No a.Under Attic(Vented) R=30.0 601.00 ft2 6. Conditioned floor area(ft2) 1469 b.Knee Wall(Vented) R=19.0 201.00 ft2 7. Windows- Description Area c. N/A R= ft2 a. U-Factor: Dbl, U=0.30 251.17 ft2 11. Ducts R ft2 SHGC: SHGC=0.25 a.Sup:Attic,Ret:Garage,AH: Garage 6 100 b. U-Factor: N/A ft2 SHGC: 12.Cooling systems kBtu/hr Efficiency c. U-Factor: N/A ft2 a.Central Unit 40.1 SEER:14.00 SHGC: d. U-Factor: N/A ft2 13. Heating systems kBtu/hr Efficiency SHGC: a.Electric Heat Pump 31.3 HSPF:8.20 Area Weighted Average Overhang Depth: 0.000 ft. Area Weighted Average SHGC: 0.250 8. Floor Types Insulation Area 14. Hot water systems 2 a.Electric Cap: 50 gallons a.Slab-On-Grade Edge Insulation R=0.0 601.00 ft EF:0.95 b.Floor over Garage R=13.0 338.00 ft2 c.N/A R= ft2 b. Conservation features None 15.Credits Pstat I certify that this home has complied with the Florida Energy Efficiency Code for Building RTttE ST9? Construction through the above energy saving features which will be installed (or exceeded) y0 = F in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code compliant features. Builder Signature: Date: a Address of New Home: City/FL Zip: coo WV, o `Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotline at(321) 638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 9/22/2017 1:30 PM EnergyGauge®USA-v5.1 - Section R405.4.1 Compliant Software Page 1 of 1 UocuSign Envelope IU:64041384-OB31-4440-13906-9FBA8A005/F/ FORM R405-2014 Florida Department of Business and Professional Regulations Residential Whole Building Performance and Prescriptive Methods ADDRESS: Permit Number: Atlantic Beach, FL, MANDATORY REQUIREMENTS See individual code sections for full details. 0 401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law [Section 553.9085, Florida Statues]requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C. R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.1 through R402.4.4. 0 R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.The sealing methods between dissimilar materials shall allow for differential expansion and contraction. R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. Where required by the code official,an approved third party shall inspect all components and verify compliance. R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals).Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statutes or individulas licensed as set forth in Section 489.105(3)(f), (g),or(i)or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures; 2.Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures; 3.Interior doors, if installed at the time of the test,shall be open; 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test,shall be turned off;and 6.Supply and return registers, if installed at the time of the test,shall be fully open. O R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers and outdoor combustion air. O R402.4.3 Fenestration air leakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Site-built windows,skylights and doors. O R402.4.4 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not more than 2.0 cfm(0.944 L/s)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. 0 R403.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. 0 R403.1.3 Heat pump supplementary heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have controls that,except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load. 0 R403.2.2 Sealing(Mandatory)AII ducts,air handlers,and filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts and plenum chambers,shall be constructed and sealed in accordance with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction or rough-in testing below. Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either individuals as defined in Section 553.993(5)or(7), Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(f),(g),or(i), Florida Statutes,to be"substantially leak free"by either of the following: 1. Post-construction test:Total leakage shall be less than or equal to 4 cfm(113 L/min)per 100 square feet(9.29 m2)of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (25 Pa)across the entire system, including the manufacturer's air handler enclosure.All register boots shall be taped or otherwise sealed during the test. 2. Rough-in test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (25Pa)across the system,including the manufacturer's air handler enclosure.All registers shall be taped or otherwise sealed during the test. If the air handler is not installed at the time of the test,total leakage shall be less than or equal to 3 cfm (85 L/min)per 100 square feet(9.29 m2)of conditioned floor area. Exceptions: 1. The total leakage test is not required for ducts and air handlers located entirely within the building envelope. 2. Duct testing is not mandatory for buildings complying by Section R405 of this code. 9/22/2017 1:30 PM EnergyGauge®USA-v5.1 - Section R405.4.1 Compliant Software Page 1 of 3 uocuJlgn tnvelope IU:U4U413t34-Ub3l-444U-t39UU-9rt3AbAUUS/r/ FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) O R403.2.3 Building Cavities(Mandatory). Building framing cavities shall not be used as ducts or plenums. 0 R403.3 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying fluids above 105°F(41°C) or below 55°F(13°C)shall be insulated to a minimum of R-3., R403.3.1 Protection of piping insulation. O R403.4.1 Circulating hot water systems(Mandatory). Circulating hot water systems shall be provided with an automatic or readily accessible manual switch that can turn off the hot-water circulating pump when the system is not in use. R403.4.3 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3%inches(89 mm)in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.4.4 Water heater efficiencies(Mandatory). O R403.4.4.1 Storage water heater temperature controls R403.4.4.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature setting range shall be from 100°F to 140°F(38°C to 60°C). R403.4.4.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off.A separate valve shall be provided to permit the energy supplied to the main burner(s) of combustion types of service water heating systems to be turned off. O R403.4.4.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water heating category. Solar water heaters shall met the criteria Section R403.4.4.2.1. R403.4.4.2.1 Solar water heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol, Collectors in installed solar water heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal;and 2. Be installed at an orientation within 45 degrees of true south. p R403.5 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code, Residential or Florida Building Code, Mechanical,as applicable,or with other approved means of ventilation. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. p R403.6 Heating and cooling equipment(Mandatory). The following sections are mandatory for cooling and heating equipment. O R403.6.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and indoor units(if split system)shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1.This code does not allow designer safety factors, provisions for future expansion or other factors which affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. R403.6.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load,but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.6,or the closest available size provided by the manufacturer's product lines.The corresponding latent capacity of the equipment shall not be less than the calculated latent load. 9/22/2017 1:30 PM EnergyGauge®USA-v5.1 - -Section R405.4.1 Compliant Software Page 2 of 3 UOCUJIgn tnvelope IU:V4u4]st$4-Ut5J]-444u-bVUt,-Vr-bAUAUUS/r/ FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) 0 R403.6.1.1 Cooling equipment capacity.(continued) The published value for AHRI total capacity is a nominal, rating-test value and shall not be used for equipment sizing. Manufacture's expanded performance data shall be used to select cooling-only equipment.This selection shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry bulb temperature for the load calculation(or entering water temperature for water-source equipment),the blower cfm provided by the expanded performance data, the design value for entering wet bulb temperature and the design value for entering dry bulb temperature. Design values for entering wet bulb and dry bulb temperature shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s)is installed in an unconditioned space. Exceptions: 1. Attached single-and multi-family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer, in attached single-and multi-family units,the capacity of equipment may be sized in accordance with good design practice. 0 R403.6.1.2 Heating equipment capacity R403.6.1.2.1 Heat pumps. Heat pumps sizing shall be based on the cooling requirements as calculated according to Section R403.6.1.1 and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load. R403.6.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.6.1. R403.6.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.6.1. 0 R403.6.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. ❑ R403.7 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the Commercial Provisions in lieu of Section R403. ❑ R403.8 Snow melt system controls(Mandatory). Snow and ice-melting systems,supplied through energy service to the building,shall include automatic controls capable of shutting off the system when the pavement temperature is above 55°F,and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F. ❑ R403.9 Swimming pools,inground spas and portable spas(Mandatory). The energy requirements for residential pools and inground spas shall be as specified in Sections R403.9.1 through R403.9.3 and in accordance with ANSI/APSP-15.The energy requirements for portable spas shall be in accordance with ANSI/APSP-14. 0 R403.9.1 Pool and spa heaters. All pool heaters shall be equipped with a readily accessible on-off switch that is mounted outside the heater to allow shutting off the heater without adjusting the thermostat setting. R403.9.1.1 Gas and oil-fired pool and spa heaters. All gas-and oil-fired pool and space heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013 when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural gas or LP gas shall not have continuously burning pilot lights. R403.9.1.2 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard. O R403.9.2 Time switches. Time switches or other control method that can automatically turn off and on heaters and pumps according to a preset schedule shall be installed on all heaters and pumps. Heaters, pumps and motors that have built in timers shall be deemed in compliance with this equipment. Exceptions: 1. Where public health standards require 24-hour pump operations. 2. Where pumps are required to operate solar-and waste-heat-recovery pool heating systems. 3. Where pumps are powered exclusively from on-site renewable generation. O R403.9.3 Covers. Heated swimming pools and inground permanently installed spas shall be equipped with a vapor-retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Outdoor pools deriving over 70 percent of the energy for heating from site-recovered energy,such as a heat pump or solar energy source computed over an operating season. ❑ RR404.1 Lighting equipment(Mandatory). A minimum of 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or a minimum of 75 percent of permanently installed lighting fixtures shall contain only high efficacy lamps. Exception: Low-voltage lighting shall not be required to utilize high-efficacy lamps. 0 R404.1.1 Lighting equipment(Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights ❑ R405.2 Performance ONLY. All ducts not entirely inside the building thermal envelope shall be insulated to a minimum of R-6. O R405.2.1 Performance ONLY. Ceilings shall have minimum insulation of R-19.Where single assemby of the exposed deck and beam type or concrete deck roofs do not have sufficent space, R-10 is allowed. 9/22/2017 1:30 PM EnergyGauge®USA-v5.1 - -Section R405.4.1 Compliant Software Page 3 of 3 DocuSign Envelope ID:C4041384-OB31-4440-B90C-9FBA8AO057F7 FORM R405-2014 TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Aquatic Townhomes-Bldg 1-Unit 101 Builder Name: Tribridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach, FL, Permit Number: Owner: TriBridge Residential Jurisdiction: Duval 261000 Design Location: FL, MAYPORT_NS COMPONENT CRITERIA CHECK Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. Exterior thermal envelope contains a continuous barrier. Breaks or joints in the air barrier shall be sealed. Air-permeable insulation shall not be used as a sealing material. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier shall be sealed. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Corners and headers shall be insulated and the junction of the foundation Walls and sill plate shall be sealed. The junction of the top plate and the top or exterior walls shall be sealed. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Knee walls shall be sealed. Windows, skylights and doors The space between window/doorjambs and framing and skylights and framing shall be sealed. Rim joists Rim joists are insulated and include an air barrier. Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside and cantilevered floors) of subfloor decking. The air barrier shall be installed at any exposed edge of insulation. Crawl space walls Where provided in lieu of floor insulation, insulation shall be permanently attached to the crawlspace walls. Exposed earth in unvented crawl spaces shall be covered with a Class I vapor retarder with overlapping joints taped. Shafts, penetrations Duct shafts, utility penetrations, and flue shaft openings to exterior or unconditioned space shall be sealed. Narrow cavities Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Recessed lighting Recessed light fixtures installed in the building thermal envelope shall be air tight, IC rated, and sealed to the drywall. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Shower/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air barrier installed separating them from the showers and tubs. Electrical/phone box on The air barrier shall be installed behind electrical or communication boxes or air sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub-floor or drywall. Fireplace An air barrier shall be installed on fireplace walls. Fireplaces shall have gasketed doors 9/22/2017 1:31 PM EnergyGauge®USA-v5.1 -Section R405.4.1 Compliant Software Page 1 of 1 uocuJlgn tnvelope IU:U4U413b4-Ub3l-444U-bi)UU-yrtfAbAUUS/r/ FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Envelope Leakage Test Report Prescriptive and Performance Method Project Name: Aquatic Townhomes-Bldg 1-Unit 101 Builder Name: Tribridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach, FL, Permit Number: Design Location: FL,MAYPORT_NS Jurisdiction: Duval 261000 Cond. Floor Area:: 1469 sq.ft. Cond.Volume: 15057 cu ft. Envelope Leakage Test Results Leakage Characteristics Regression Data: CFM(50): C: n: R: ELA: Single or Multi Point Test Data HOUSE PRESSURE FLOW: EgLA. 1 ! Pa cfm ACH: 2 Pa cfm SLA: 3 Pa cfm ACH(50)" 4 Pa cfm " For prescriptive projects, tested leakage must be 5 Pa cfm <=7 ACH(50). For performance projects, tested 6 Pa cfm leakage must be <=the ACH(50) shown on Form R405-2014 for this project. R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed, beyond the intended weatherstripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test,shall be open; 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test,shall be turned off;and 6.Supply and return registers, if installed at the time of the test,shall be fully open. I hereby certify that the above envelope leakage Testing shall be conducted by either individuals as defined in Section 04TKH STA " performance results demonstrate compliance 553.993(5)or(7), Florida Statutes or with Florida Energy Code requirements in " individuals licensed as set forth in accordance with Section R402.4.1.2. 1 Section 489.105(3)(f), (g), or (i) or an approved third party. A written report a SIGNATURE: of the results of the test shall be signed ° by the third party conducting the test PRINTED NAME: and provided to the code official. G'Op WE BUILDING OFFICIAL: DATE: DATE: 9/22/2017 1:31 PM EnergyGauge®USA-v5.1 -Section R405.4.1 Compliant Software Page 1 of 1 uocublgn tnvelope IU:G4041384-Ub31-4440-t 9UG-9r-bA8AUUb/r/ FORM R405-2014 Duct Leakage Test Report Performance Method FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Form R405 Duct Leakage Test Report Performance Method Project Name: Aquatic Townhomes-Bldg 1-Unit 101 Builder Name: Tribridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach, FL, Permit Number: Design Location: FL, MAYPORT_NS Jurisdiction: Duval 261000 Duct Test Time: Post Construction Duct Leakage Test Results CFM25 Duct Leakage Test Values Line System Outside Duct Leakage 1 System 1 cfm25(Out) 2 System 2 cfm25(Out) 3 System 3 cfm25(Out) 4 System 4 cfm25(Out) 5 Total House Sum lines 1-4 Duct System Leakage Divide by (Total Conditioned Floor Area) _ (Qn,Out) I certify the tested duct leakage to outside, Qn, is HEST Duct tightness shall be verified by F-vAT not greater than the proposed duct leakage Qn O testing to Section 803 of the RESNET BY ,,,. _ • 0�, specified on Form R405-2014. Standards by either individuals as " defined in Section 553.993(5)or(7), Florida Statutes, or individuals licensed C4a SIGNATURE: as set forth in Section 489.105(3)(f), y (g), or(i), Florida Statutes. PRINTED NAME: ��,OD WIE DATE: BUILDING OFFICIAL: DATE: 9/22/2017 1:31 PM EnergyGauge®USA-v5.1 - Section R405.4.1 Compliant Software Page 1 of 1 Florida Building Code Duct Leakage Results Builder: Traid Mechanical Neighborhood: Cottage At North Beach Lot#: 101 Address: 120 Aquatic Dr City: Atlantic Beach State: FL Permit #: Square Footage: 1469 Stage of Construction for Test ❑Rough in with Air Handler 1-1 Rough in no Air Handler ❑v— Post Construction Duct Leakage Test Results: Duct Leakage percent requirement: 3 % System CFM25 Square Duct Leakage Location Pass or Fail Footage CFM/100s ft. 1 82.6 1469 5.6 Interior Fail 2 3 4 5 Pass FV-] Fail Rating Company: SkyeTec° Inspection Date: 9.29.17 Rater Name: Todd Rykaczewski Rater Signature: The Energy Code Experts 9570 Regency Square Blvd. Suite 410 Jacksonville, FL 32225 Phone: 904.482.4000 1 1.866.SKYETEC www.SkyeTec.com FORM R405-2014 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Resid if m6al Performance Method Pmject Name: Aquatic Townhomes-Bldg 1-Unit 101 Builder Name: Tnbndge Re iI Street: Permit Office: Duval City,State,Zip. Atlantic Beach FL, Permit Number: Clod 6 - 93J Owner: TnBridge Residential Judsdidion: Duva12670 ('. Design Location: FL,MAYPORT_NS County:: Duval(Floe r"11 1. New construction or existing New(From Plans) 9. Wall Types(2500.9 sgft. -i 2. Single family or multiple family MulLLfamity a.Frame-Wood,Exterior R=13.0 1702.90 fit b.Frame-Wood,Common R=13.0 573.00 R2 3. Number of units,if multiple family 1 c. Frame-Wood,Adjacent R=13.0 225.008' 4. Number of Bedrooms 2 i d.N/A R= ft2 S. Is this a worst case? No 10.Ceiling Types (802.0 sgft.) Insulation Area a.Under Attic(Vented) R=30.0 601.00 fit 6. Conditioned Noor area above grade(ft2) 1469 b.Knee Wall(Vented) R=19.0 201.00 ft Conditioned floor area below grace(ft2) 0 c.WA R ft2 11.Ducts R ft2 7. Windows(251.2 sgft.) Description Area a.Sup:Attic,Ret:Garege,AH:Garage 6 100 a. U-Fador: Dbl,U=0.30 251.17 M SHGC: SHGC=0.25 b. U-Fador: N/A ry: 12.Cooling systems kStrVhr Efficiency a.Central Unit 40.1 SEER:14.00 SHGC: c. U-Fador. WA fit SHGC: 13.Heating systems kBtumr Efficiency d. U-Factor. N/A ft2 a.Electric Heat Pump 31.3 HSPF:8.20 SHGC: Area Weighted Average Overhang Depth: 0.000 ft. Area Weighted Average SHGC: 0.250 14.Hol water systems a.Electric Cap:60 gallons 8. Floor Types (939.0 sgft.) Insulation Area EF:0.950 a.Slab-On-Gmde Edge Insulation R=0.0 601.0082 b. Conservation features b.Floor over Garage R=13.0 338.008 It c.N/A R= ft 15.Credits Peter Glass/Floor Area: 0.171 Total Proposed Modified Loads: 44.25 PAS S Total Baseline Loads: 45.72 I hereby certify that the plans and specifications covered by Review of the plans and OETIIESTgTF this calculation are in compliance with the Florida Energy specifications covered by this Code, calculation indicates compliance ro - with the Florida Energy Code. " PREPARED BY: Lisandro Vazquez __ Before construction is completedf - C DATE: 11-06-2016 ___.. - __. this building Will be inspected for 0% _e_ a compliance with Section 553.908 4 I hereby certify that this buildin s designedFlorida Statutes. ,is in compliance X420 VS With the Florida Energy C da. ODWO OWNER/AG NT: BUILDING OFFICIAL: ; DATE: / DATE: C 1 ♦` - Compliance requires certification bythe air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.2.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage test report in accordance with R402.4.1.2. - Compliance with a proposed duct leakage On requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with Section 803 of RESNET Standards, is not greater than 0.030 Qn for whole house. 11/81201612:22 PM EnergyGaugeH USA-Flalces2014 Section R405.4.1 Compliant Software Pagel of FORM R405-2014 PROJECT Title. Aquatic Townhomes-Bldg 1-U Bedrooms: 2 Add..Type: Lot Information Building Type: User Conditioned Area: 1469 Lot# 101 Owner: TnBridge Residential Total Stones: 3 BlocklSubDivision: Bltlgi,Unit 101 #of Units: 1 Worst Case: No PlatBook: Builder Name: Tribridge Residential Rotate Angle: 0 Street: Penult Office: Duval Chose Ventilation: County: Duval Jurisdiction: DuvaI261000 Whole House Fan: City,State,Zip: Atlantic Beach, Family Type: Multifamily FL, NewlEmsting: New(From Plans) Comment: Aquatic Townhomes(Building 1-Unit 10 1) CLIMATE J IECC Design Temp Int Design Temp Heating Design Daily Temp Design Location TMY Site Zone 97.5% 2.5% Winter Summer Degree Days Moisture Range FL,MAYPORT_NS FL_MAVPORT_NS 2 39 90 70 75 1037 61 Medium BLOCKS Number Name Area Volume 1 Blocki 1469 15057.3 SPACES Number Name Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled Heated 1 Whole House 1469 15057.3 Yes 3 2 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatio Whole House 94 ft 0 601 W — 0 1 0 2 Floor over Garage Whole House — --- 338W 13 0 1 0 ROOF Roof Gable Roof Solar SA Emift Emitt Deck Pitch # Type Meteri ils Area Area Color Absor. Tested Tested Insul. (deg) 1 Gable or shed Composition shingles 1088 ft' 2746' Medium 0.85 No 0.9 No 0 30.3 ATTIC Jis Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 300 939 ft2 Y N CEILING # Ceilirg Type Space R-Value Ins Type Area Framing Frac Truss Type _ 1 Under Attic(Vented) Whole House 30 Ball 601 fP 0.11 Wood _ 2 Knee Wall(Vented) Whole House 19 Batt 646' 0.11 Wood _ 3 Knee Wall(Vented) Whole House 19 Batt 75 ft' 0.11 Woad 4 Knee Wall(Vented) Whole House 19 Batt 62ft 0.11 Wood 1118/201612:22 PM EnergyGouge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 2 of FORM R405-2014 WALLS AdjacentSiCavity Width Height Sheathing Framing Solar Below 1 S Exterior Frame-Wood Whole House 13 26 0 9 0 234.0% 0.23 0.5 0 2 E Neighbor Frame-Woad Whole House 13 12 9 9 0 114.8 ft' 0.23 0.01 0 -3 E Garage Frame-Woad Whole House 13 3 10 9 0 34.5 ft- 0.23 0.01 0 4 N Garage Frame-Wood Whole House 13 11 3 9 0 101.311' 0.23 0.01 0 5 W Exterior Frame-Wood Whole House 13 30 6 9 0 274.5 ft' 0.23 0.5 0 6 N Exterior Frame-Wood Whole House 13 4 6 9 0 40.5W 0.23 0.5 0 -7 N Garage Frame-Wood Whole House 13 9 11 9 0 89.3 W 0.23 0.01 0 8 E Neighbor Frame-Wootl Whole House 13 14 8 10 6 154.0 ft' 0.23 0.01 0 9 E Neighbor Frame-Wootl Whole House 13 6 0 10 6 63.0 IF 0.23 0.01 0 10 E Neighbor Frame-Wood Whole House 13 17 4 10 6 182.0 ft' 0.23 0.01 0 11 N Exterior Frame-Wood Whole House 13 26 0 10 6 273.0W 0.23 0.5 0 12 W Exterior Frame-Wood Whole House 13 38 1 10 6 399.9 tt• 0.23 0.5 0 13 S Exterior Frame-Wootl Whole House 13 26 0 10 6 273.0%0.23 0.5 0 14 W Exterior Frame-Wootl Whole House 13 9 5 8 0.16 75.5 ft' 0.23 0.5 0 15 S Exterior Frame-Woad Whole House 13 11 1D 8 11 105.6 ft2 0.23 0.01 0 16 W Exterior Frame-Wood Whole House 13 3 0 9 0 27.0% 0.23 0.5 0 17 E Neighbor Frame-Wood Whole House 13 6 7 9 59.3 IF 0.23 0.01 0 DOORS # Omt Door Type Space $tows U-Value Width Height Area Ft In Ft In 1 S Wood Whole House None .46 3 6 8 20X' 2 N Wood Whole House None .46 3 8 24X' 3 N Wood Whole House None 46 3 8 24 ft' WINDOWS Orientation shown is the entered,Proposed orientation. J Wall Overhang # Omt ID Frame Panes NFRC L-1-Factor SHGC Area Depth Separation Int Shade Screening 1 S 1 Metal Low-E Double Yes 0.3 0.25 64.0 X' 0 X 0 in 0 It 0 in DrapesPolinds None 2 W 5 Metal Low-E Double Yes 0.3 0.25 64.0 M 0 It 0 in 0 ft 0 in Drapesrblinds None 3 N 11 Metal Low-E Double Yes 0.3 0.25 31.2 ft' 0 ft 0 in 0 X 0 in Drapeslblinds None _ 4 N 11 Metal Low-E Double Yes 0.3 0.25 14.7 ft' 0 ft 0 in 0 X 0 in Drapes blinds None _ 5 W 12 Metal Low-E Double Yes 0.3 0.25 30.2 ft' 0 ft 0 in 0 X 0 in Drapes/blinds None 6 S 13 Metal Low-E Double Yes 0.3 0.25 32.0 V 0 X 0 in 0 It 0 in Drapes/blinds None 7 S 13 Metal Low-E Double Yes 0.3 0.25 15.1 ft' 0 It 0 in Oft 0 in Drapes/blinds None 11/8/2016 12:22 PM EnergyGauge®USA-FlsRes2014 Section R405.4.1 Compliant Software Page 3 of 5 FORM R405-2014 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation 1 4928' 4928' 3511 98 1 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000456 17567 96.44 181.37 .4881 7 HEATING SYSTEM # System Type Subtype Lfficiency Capacity _ Block Duds 1 Electric Heat Pump Spirt HSPF:8.2 31.3 kBWlhr 1 sys#1 COOLING SYSTEM # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit Split SEER: 14 40.1 kBtuft 1575 cfm 0.8 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use Sel Conservation 1 Electric None Garage 0.95 50 gal 80 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cod # Company Name System Model# Collector Model# Area Volume FEF Nona None 8' DUCTS / —Supply— Return-- Air CFM 25 CFM25 HVAC# V # Location R-Value Area Location Area Leakage Type Handler TOT OUT ON RLF Heal Cod i AN 6 10(1 Garage 73.58• Prop.Leak Free Garage —chn 44.1 dm 0.03 0.60 1 1 11/8@016 12:22 PM EnergyGauga®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 4 of 5 FORM R405-2014 TEMPERATURES Programablle001ThermostaJanr0t:01V Feb 1001 11 Ceiling Fans:Cooll Ma frX1I X1 J.1 11 tD01 rf I Oct x001 ID01 V Ming [ ]Jan [ 'Feb [X7 Mar [XJ Apr Apr I M y [ ]Jun ]Jul AugAu [ ]Sep �(7 O 'X]Nov [ ]D Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heafing(WD) AM 66 6666 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 11/81201612:22 PM EnergyGaugaeD USA-FlaRea2014 Section R405.4.1 Compliant SoBware Page 5 of 6 FORM R405-2014 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX' = 97 The lower the EnergyPerformance Index,the more efficient the home. Atlantic Beach, FL, 1. New construction or existing No.(From Plans) 9. Wall Types Insulation Area 2. Single family or multiple family Multifamily a.Frame-Wood,Exterior R=13.0 1702.90 ft' b.Frame-Wood,Common R=13.0 573.00 W 3. Number of units,if multiple family 1 c.Frame-Wood Adjacent R=130 225.00 ff 4. Number of Bedrooms 2 d.NIA R= ft' 5. Is this a worst case? No 10.Ceiling Types Insulation Area a.Under Attic(Vented) R=30.0 601.00 If, 6. Conditioned 9oorarea(8') 1469 E.Knee Wall(Vented) R=19.0 201.00 f' c.NIA R= ft' 7. Windows" Description Area 11.Ducts R ft' a. U-Factor Dbl,U=0.30 251.17 ft a.Sup:Attic,Ret:Garage,AH:Garage 6 100 SHGC: SHGC=0.25 b. UFaclor: NIA fY SHGC: 12.Cooling systems kBWlhr Efficiency c. U-Factor: N/A ft' a.Central Unit 40.1 SEER:14.00 SHGC: d. U-Factor N/A ft2 13.Hearing systems kBtulhr Efficiency SHGC: a.Electric Heat Pump 31.3 HSPF8.20 Area Weighted Average Overhang Depth: 0.000 ft. Area Weighted Average SHGC: 0.250 8. Floor Types Insulation Area 14.Hot water systems Cap:50 gallons a.Slab-On-Grade Edge Insulation R=0.0 601.00 If a.Electric EF:0.95 b.Floor over Garage R=13.0 338.00 ft' c.N/A R= ft b. Conservation features None 15.Credits Patel I certify that this home has complied with the Florida Energy Efficiency Code for Building Df Tl1E STg2F Construction through the above energy saving features which will be installed (or exceeded) y = F ` o in this home before final inspection. Otherwise, a new EPL Display Card will be completed y43 ;" _- ,a based on installed Code compli //res. Builder Signature: UDate: -z'Z247 •il.' a° Address of New Home: ID-1 �� ,�,�� �f. City/FL Zip: , QpAtt) F-L 'cy WE'�J 3zA5%9 =Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage(EEM) incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotline at(321) 638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For information about the Florida Building Code, Energy Conservation,contact the Florida Building Commission's support staff. "Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 11/8/201612:22 PM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of i FORM R405-2014 Florida Department of Business and Professional Regulations Residential Whole Building Performance and Prescriptive Methods ADDRESS: Permit Number. Atlantic Beach,FL, MANDATORY REQUIREMENTS See individual code sections for full details. 0 401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Florida law [Section 553.9085,Florida Stalues]requires the EPL display card to be included as an addendum to each sales conVad for both presold and nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C. 0 R402A Air leakage(Mandatory). The building thermal envelope shall be constructed to limo air leakage in accordance with the requirements of Sections R402.1 through R402.4.4, O R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.The sealing methods between dissimilar materials shall allow for differential expansion and contraction. • R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturers instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. Whom required by the code official,an approved third party shall inspect all components and verify compliance. • 11402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rata of not exceeding 5 air changes par hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall b,conducted by an approved third party.A written report of the results of the test shall be signed by the pony conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fireplace and stove doom shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures; 2.Dampers including exhaust,intake,makeup air,backdraf and flue dampers shall be closed but not sealed beyond intended infiltration control measures; 3.Interior doors,if installed at the time of the test,shall be open; 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be dosed and sealed 5.Heating and cooling systems,6 installed at the time of the test,shall be turned of;and 6.Supply and return registers,if installed at the time of the test,shall be fully open. O R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers and outdoor combustion air. O R402.4.3 Fenestration air leakage.Windows,skylights and sliding glass doom shall have an air infiltration rate of no more than 0.3 cfm per square fool(1.5 Uslm2),and swinging doors no more than 0.5 chn per square foot(2.6 Us/m2),when tested according to NFRC 400 or AAMAIW DMA/CSA 101/LS.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Ske-built windows,skylights and doors. O R402.4.4 Reuased lighting. Recessed!luminaires installetl in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 ps((75 Pa)pressure differential.All recessetl luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. O R403.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. O 8403.1.3 Heat pump supplementary heat(Mandatory). Heal pumps having supplementary eledrio-resistance heat shall have controls that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load. 0 8403.2.2 Sealing(Mandatory)AII duds,air handlers,and fitter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered duds and plenum chambers,shall be constructed and sealed in accordance with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction or rough-in testing below Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section 553.99,Florida Statutes,or as authorized by Florida Statutes,to be"substantially leak free'by either of the following: 1. Post-construction test:Total leakage shall be less than or equal to 4 dm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested at a pressure differential of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturers air handler enclosure.All register boots shall be taped or otherwise sealed during the test. 2. Roughin test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9,29 m2)of conditioned floor area when tested at a pressure differential of 0.1 inches w.g.(25Pa)across the system,including the manufacturers air handler enclosure.All registers shall be taped or otherwise sealed during the test.If the air handier is not installed at the time of the test,total leakage shall be less than or equal to 3 dm (85 Unruh)per 100 square feet(9.29 m2)of conditioned floor area. Exceptions: 1. The total leakage lest is not required for duds and air hangers located entirely within the building envelope. 2. Duct testing Is not mandatory for buildings complying by Section R405 of this code. 111812016 12:22 PM EnergyGaugeO USA-Fla8es2014 -Section R405.4.1 Com Page 1 of 3 FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) ❑ R403.2.3 Building Cavities(Mandatory). Building framing cavities shall not be used as ducts or plenums. ❑ R403.3 Mechanical system piping Insulation(Mandatory). Mechanical system piping capable of carrying fluids above 10i(41'C) or below 550F(IYC)shall be insulated to a minimum of R-3., R403.3.1 Protection of piping insulation. ❑ R403.4.1 Circulating hot water systems(Mandatory). Circulating hot water systems shall be provided with an automatic or readily accessible manual switch that can tum off the hot-water circulating pump when the system is not in use. ❑ R403.4.3 Haat turps(Mandatory). Storage water heaters not equipped with integral heal Imps and having vertical pipe risers shall have heal traps installed on both the inlets and outlets.External heat baps shall consist of either a commercially available heat imp or a downward and upward bend of at least 3 h inches(89 mm)in the hot water distribution line and cold water line located as close as possible W the storage tank. ❑ R403.4.4 Water heater efficiencies(Mandatory). O R403.4.4.1 Storage water heater temperature controls R403.4.4.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature selling range shall be from 100i to 140-F(38-C to 60°C). 8403.4.4.1.2 Short down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off.A separate valve shall be providetl to permit the energy supplied to the main bumer(s) of combustion types of service water heating systems to be turned off. O R403A.4.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used to provide healing functions as part of a combination system shall satisfy all stated requirements for the appropriate water healing category. Solar water heaters shall met the criteria Section R403.4.4.2.1. R403.4.4.2.1 Solar water heating systems. Solar systems for domestic hot water production are rated by the annual solar enemy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol,Collectors in installed soler water heating systems should meal the following criteria: 1. Be instilled with a till angle between 10 degrees and 40 degrees of the horizontal;and 2. Be installed at an adentifion within 45 degrees of true south. ❑ R403.5 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code,Residential or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. ❑ R403.6 Heating and cooling equipment(Mandatory). The following sections are mandatory for cooling and heating equipment. O R403.8.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and indoor units(if split system)shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1.This code does not allow designer safety factors,provisions for future expansion or other factors which affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. • R403.6.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its to it capacity is not less than the calculated total load,but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.6,or the closest available size provided by the manufacturers product lines.The corresponding latent capacity of the equipment shall not be less than the calculated latent load. 11/&201612:22 PM EmMyOaugeto LISA-FlaRes2014 -Section R4054.1 Com Page 2 of 3 FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) O R403.6.1.1 Cooling equipment capacity.(continued) The published value for AHRI total capacity is a nominal,rating-test value and shall not be used for equipment sizing.Manufacture's expanded performance data shall be used to select cooling-only equipment.This selection shall be used to select coming-only equipment.This selection shall be based on the outdoor design dry bulb temperature for the load calculation(or entering water temperature for water-source equipment),the blower chn provided by the expanded performance data, the design value for entering wet bulb temperature and the design value for entering dry bulb temperature. Design values for entering wet bulb and dry bulb temperature shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for realm side gains if the return pull is installed in an unconditioned space. Exceptions: 1. Attached single-and multifamily residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer,in attached single-and multi-family units,the capacity of equipment may be sized in accordance with good design practice. O R403.6.1.2 Heating equipment capacity R403.6.1.2.1 Heat pumps. Heal pumps sizing shall be based on the cooling requirements as calculated according to Section R403.6.1.1 and the heal pump total cooling capacity shall not be mare than 1.15 times greater than the design cooling load. 8403.6.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403,6.1. R403.6.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural tlreft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.6.1. O 8403.6.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an inbunniftenl basis,such as anticipated additional Iceds caused by major entertainment events,shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or healing system is utilized to provide cooling or heafing to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periads is utilized. O R403.7 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections 0403 and C404 of the Commercial Provisions in lieu of Section R403, 0 8403.8 Snow melt system controls(Mandatory). Snow and ice-melting systems,supplied through energy service to the building,shall include automatic controls capable of shutting off the system when the pavement temperature is above 55-F,and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 401 0 8403.9 Swimming pools,Inground spas and portable spas(Mandatory). The energy requirements for residential pools and ingmund spas shall be as specifed in Sections R403.9.1 through R403.9.3 and in accordance with ANSI/APSP-15.The energy requirements for portable spas shall be in accordance with ANSI/APSP-14. O R403.9.1 Pool and spa heaters. All pool healers shall be equipped with a readily accessible on-off switch that is mounted outside the heater to allow shutting off the heater without adjusting the thermostat setting. R403.9.1.1 Gas and oil-fired pool and spa hasten. All gas-and oil-fired pool and space heaters shall have a minimum thermal efficiency of 82 percent for healers manufactured on or after April 16,2013 when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural gas or LP gas shall not have continuously burning pilot lights. R403.9.1.2 Heat pump pool heaters. Heat pump Not heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard. O R403.9.2 Time switches. Time switches or other control method that can automafically tum of and on heaters and pumps according to a preset schedule shall be installed on all healers and pumps.Healers,pumps and motors that have built in timers shall be deemed in compliance with this equipment. Exceptions: • 1. Where public health standards require 24-hour pump operations. 2. Where pumps are required to operate solar-and waste-heat-recovery pool healing systems. 3. Where pumps are powered exclusively from on-site renewable generation. O 8403.9.3 Covers. Heated swimming pools and inground permanently installed spas shall be equipped with a vapor-retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Outdoor pools deriving over 70 percent of the energy for heating from site-recovered energy,such as a heal pump or solar energy source computed over an operating season. 0 RR404.1 Lighting equipment(Mandatory). A minimum of 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or a minimum of 75 percent of permenenfly installed lighting futures shall contain only high efficacy lamps. Exception: Low-voltage lighting shall not be required to utilize high-efficacy lamps. O 8404.1.1 Lighting equipment(Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights 0 R405.2 Performance ONLY. All ducts not enfirely inside the building thermal envelope shall be insulated to a minimum of R-6. O R405.2.1 Performance ONLY. Ceilings shall have minimum insulation of R-19.Where single assemby of the exposed deck and beam type or concrete tleck roofs do not have sufficant space,R-10 is allowed. 11/8/201612:22 PM EnergyGaui USA-FleRes2016 -Section R405.4.1 Com Page 3 of 3 FORM R405-2014 TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Aquatic Townhomes-Bltlg 1-Unit 101 Builder Name: Tnbridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach,FL, Permit Number: Owner: TnBridge Residential Jurisdiction: Duval 261000 Design Location: FL,MAVPORT_NS COMPONENT CRITERIA CHECK Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. Exterior thermal envelope contains a continuous barrier. Breaks or joints in the air barrier shall be sealed. Air-permeable insulation shall not be used as a sealing material. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier shall be sealed. Access openings,drop down stairs or knee well doors to unconditioned attic spaces shall be sealed. Comers and headers shall be insulated and the junction of the foundation Walls and sill plate shall be sealed. The junction of the top plate and the top or exterior walls shall be sealed. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Knee walls shall be sealed. Windows, skylights and doors The space between window/doorjambs and framing and skylights and framing shall be sealed. Rim joists Rim joists are insulated and include an air barrier. Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside and cantilevered floors) of subfioor decking. The air barrier shall be installed at any exposed edge of insulation. Crawl space walls Where provided in lieu of floor insulation,insulation shall be permanently attached to the crawlspace walls. Exposed earth in unvented crawl spaces shall be covered with a Class I vapor retarder with overlapping joints taped. Shafts, penetrations Duct shafts,utility penetrations,and flue shaft openings to exterior or unconditioned space shall be sealed. Narrow cavities Batts in narrow cavities shall be cut to fit,or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Recessed lighting Recessed light fixtures installed in the building thermal envelope shall be air tight, IC rated,and sealed to the drywall. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls,or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Shower/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air barrier installed separating them from the showers and tubs. Electrical/phone box on The air barrier shall be installed behind electrical or communication boxes or air sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub-floor or drywall. Fireplace An air barrier shall be installed on fireplace walls. Fireplaces shall have gaskeled doors 11/8/201612:22 PM EnwgyGauge®USA-FleRes2014 Section R405.4.1 Compliant Software Page 1 of 1 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Envelope Leakage Test Report Prescriptive and Performance Method Project Name: Aquatic Tmmhomes-Bldg 1-Unit 101 Builder Name: Tribndge Residential Street: Permit Office: Duval City,Slate,Zip: Atlantic Beach,FL, Permit Number: Design Location: FL,MAVPORT_NS Jurisdiction: Duval261000 Cond,Floor Area:: 1469 sq.ff. Cord.Volume: 15057 cu ft. Envelope Leakage Test Results Leakage Characteristics Regression Data: Cc n: R: Cl Single or Multi Point Test Data Ems' HOUSE PRESSURE FLOW: 1 Pa cfm EgLA: 2 Pa cfm ACH: 3 Pa clm ACH(50): 4 Pa dm SLA: 5 Pa cim 6 Pa cfm R402.4.1.2 Testing. The building or dmiling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A wntten report of the results of the test shall be signed by the pant conducting the test and provided to the code official,Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infftrebw control measures; 2.Dampers including exhaust,intake,makeup air,backdaft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures; 3.Inlenor doors,if installed at the time of the test,shall be open; 4.Exterior doom for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and 6.Supply and return registers,if installed at the time of the lest,shall be fully open. I hereby certify that the above envelope leakage Where required by the code official, Or THE STq)e performance results demonstrate compliance testing shall be conducted by an �' ,,, _ OA with Florida Energy Code requirements in approved third party.A written accordance with Section R402.4.1.2. report of the results of the lest shall be signed by the third party G. o conducting the test and provided to ell' s SIGNATURE: the code official. a�COD WE.tq,JSt PRINTED NAME: DATE: BUILDING OFFICIAL:_ DATE: 11/8/201612:22 PM Energy6auge®USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 FORM R405-2014 Duct Leakage Test Report Performance Method FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Form R405 Duct Leakage Test Report Performance Method Project Name: Aquatic Townhomes-Bldg 1-Unit 101 Builder Name'. Tribridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach,FL, Pemmit Number: Design Location: FL,MAVPORT_NS Jurisdiction: Ducal 261WO Duct Test Time: Post Construction Duct Leakage Test Results kCFM25Leakage Test Values m Outside Dud Leakage m 1 dm25(Out) 2 System 2 cfm25(Out) 3 System 3 dm25(Out) 4 System 4 dm25(Out) 5 Total House Sum lines 1-4 Duct System Divide by Leakage (Total Conditioned Floor Area) (On,Out) I certify the tested duct leakage to outside, On, is qHE St not greater than the proposed duct leakage on Dud tightness shall be verified by testing to Section 803 of the RESNET - O specified on Form 11405-2014. Standards by an energy rater Certified in accordance with Section 553.99, Florida Statutes. O SIGNATURE: PRINTED NAME: t�COD WE'�' 4 DATE: BUILDING OFFICIAL: DATE: 110201612:22 PM EnemgyGai USA-FlaRes2014 -Section 11405.4.1 Compliant 5 Page 1 or 1 FORM R405-2014 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2014 Florida Building Code, Energy Conservation via the residential Simulated Performance method shall include ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report (1 page)and an input summary checklist that can be used for field verification (usually 4 pagesrmay be greater). ❑ Energy Performance Level(EPL) Display Card(one page) ❑ Mandatory Requirements(thre ,pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report(usually one page) ❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed Form R405 Duct Leakage Test Report(usually one page) EnergyGauge®-USRRPB v5.1 11/812016122242 PM Page 1 of 1