Loading...
102 Aquatic Dr #305 energy calculations FORM R405-2014 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: Aquatic Townhomes-Bldg 3-Unit 305 Builder Name: Tribridge Residential Street: Permit Office: Duval City,State,Zip: Atlantic Beach,FL, Permit Number. Owner: Trail Residential Jurisdiction: 0.1261000 Design Location: FL,MAVPORT_NS County:: Duval Flonda Climate Zone 2) 1. New construction or existing Now(From Plans) 9. Wall Types(2500.9 sgfL) Insulation Area 2. Single family or multiple family Multi-family a.Frame-Wood,E,dedor R=13.0 1702.9011' b.Frame-Wood,Common R=13.0 573.00 W 3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=13.0 225.00ft 4. Number of Bedrooms 2 d.WA R= 8' S. Is lhisaworsl case? No 10.Ceiling Types (802.0 sgft.) Insulation Area a.Under Attic(Vented) R=30.0 601.00 fP 6. Conditioned floor area above grade(8') 1469 b.Knee Wall(Vented) R=19.0 201.00 W Conditioned floor area below grace(W) 0 c.N/A R= IF 11.Ducts R fl' 7. W indows(251.2 sq8.) Description Area a.Sup:Attic,Ret:Garage,AH:Garage 6 100 a. U-Factor: Dbl,U=0.30 251.17 m SHGC SHGC=0.25 b. LI-Faction: N/A ft, 12.Cooling systems kBtwhr Efficiency SHGC: a.Central Unit 40.1 SEER:14.00 c. U-Factor: N/A 0' SHGC: 13.Heating systems kBtu hr Efficiencyd. 1.1-Factor: N/A If, a.Electric Heat Pump 31.3 HSPF:8.20 SHGC: Area Weighted Average Overhang Depth: 0.000 it Area Weighted Average SHGC: 0.250 14.Hot water systems 8. Floor Types (939.0 soft.) Insulation Area a.Electric Cap:509(31.950 EF:0.950 a.Slab-0n-Grade Edge Insulation R=0.0 601.00 h' b. Conservation features b.Floor over Garage R=13.0 338.00 R' None c.N/A R= ft' 15.Credits pMal Glass/Floor Area: 0.171 Total Proposed Modified Loads: 45.33 PASS Total Baseline Loads: 45.72 1 hereby certify that the plans and specifications covered by Review of the plans and OFT71E S74 this calculation are in compliance with the Florida Energy specifications covered by this y =_ s Off, Code. calculation indicates compliance y '_`'' LlSandro Vazquez with the Florida Energy Code. rib 2016-11-09 10:36: PREPARED BY: -° 3�- Before construction is completed - DATE: ___-_. ...____._ this building will be impacted 5 3 for p y compliance with Section 553 908 a > I hereby certify that this building as designed,is in compliance Florida Statutes. • with the Flodda Energy COD Wp.'t8J OWNER/AGENT' BUILDING OFFICIAL: DATE: -c-l", r-i DATE: O • Compliance requires certification by the air handler unit manufacturer that the air handier enclosure qualifies as certified factory-sealed in accordance with R403.2.2.1. •Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage test report in accordance with R402.4.1.2. • Compliance with a proposed duct leakage On requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested In accordance with Section 803 of RESNET Standards, is not greater than 0.030 On for whole house. 11/8/2016 12:33 PM EnergyGauge®USA-F1aRes2014 Section R405.4.1 Compliant Software Page 1 of 5 FORM R405-2014 PROJECT Title: Aquatic Townhomes-BIdg 3-U Bedrooms: 2 Address Type: Lot Information [Building Type: User Conditioned Area: 1469 Lot# 305 Owner: TnBndge Residential Total Stories: 3 BlocluSubDivision: Bldg3,Unit 305 #of Units: 1 Worst Case: No PlatBook: Builder Name: Tdbridge Residential Rotate Angle: 270 Street: Permit Office: Duval Cross Ventilation: County: Duval Jurisdiction: Dwa1261000 Whole House Fan: City,State,Zip: Atlantic Beach, Family Type: Multi-family FL, New/Existing: New(From Plans) - Comment: Aquatic Townhomes(Builtling 3-Unit 305) CLIMATE / IECC Design Temp Int Design Temp Heating Design Daily Tamp V Design Location TMV Site Zone 97.5% 2.5% Winter Summer Degree Days Moisture Range FL,MAYPORT_NS FL_MAVPORT_US 2 39 90 70 75 1037 61 Medium BLOCKS Number Name Area Volume 1 Blockl 1469 15057.3 SPACES Number Name Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled Heated 1 Whole House 1469 15057.3 Vas 3 2 1 Yes yes Yes FLOORS # Floor Type Space Perimeter Pedmeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatlo Whole House 946 0 601 fi2 — 0 1 0 2 Floor over Garage Whole House __ _ 338 W 13 0 1 0 ROOF Roof Gable Roof Solar SA Emitt Emitt Deck Pilch # Type Materials Area Area Color Absor. Tested Tested maul. (deg) 1 Gable or shed Composition shingles 10886' 274 fP Medium 0.85 No 0.9 No 0 30.3 ATTIC J # Type Ventilation Vent Ratio(I in) Area RBS IRCC 1 Full attic Vented 300 939 fie V N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Trues Type 1 Under Ado(Vented) Whole House 30 Bad 601W 0.11 Wood 2 Knee Wall(Vented) Whole House 19 Bad 6462 0.11 Wood 3 Knee Wall(Vented) Whole House 19 Ban 75 f12 0.11 Wood 4 Knee Wall(Vented) Whole House 19 Batt 62 ft2 0.11 Woad 11/82016 12:33 PM EneigyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 2 of 5 FORM R405-2014 WALLS Adjacent Specs Cavity Width Height Sheathing Framing Solar Below 1 S=>E Exterior Frame-Wood Whole House 13 26 0 9 0 234.0 ft2 0.23 0.5 0 2 E=>N Neighbor Frame-Wootl Whole House 13 12 9 9 0 114.8 ft2 0.23 0.01 0 3 E=>N Garage Frame-Wood Whole House 13 3 10 9 0 34.511' 0.23 0.01 0 4 N=>W Garage Frame-Wood Whole House 13 11 3 9 0 101.3ft 0.23 0.01 0 5 W=>S Exterior Frame-Woad Whole House 13 30 6 9 0 274.5 ft2 0.23 0.5 0 6 N=>W Exterior Frame-Wood Whole House 13 4 6 9 0 40.5112 0.23 0.5 0 7 N=>W Garage Frame-Wootl Whole House 13 9 11 9 0 89.3(12 0.23 0.01 0 -8 E=>N Neighbor Frame-Wood Whole House 13 14 8 10 6 154.0 W 0.23 0.01 0 9 E=>N Neighbor Frame-Wootl Whole House 13 6 0 10 6 63.0 IF 0.23 0.01 0 10 E=>N Neighbor Frame-Wood Whole House 13 17 4 10 6 182.0 ft2 0.23 0.01 0 11 N=>W Exterior Frame-Wood Whole House 13 26 0 10 6 273.0112 0.23 0.5 0 12 W=>S EMenor Frame-Wootl Whole House 13 38 1 10 6 399.9 ft2 0.23 0.5 0 13 S=>E EMenor Frame-Wood Whole House 13 26 0 10 6 273.0 R' 0.23 0.5 0 14 W=>S EMenor Frame-Wootl Whole House 13 9 5 8 0.16 75.5 ft2 0.23 0.5 0 15 S=>E EMenor Frame-Wootl Whole House 13 11 10 8 11 105.5ft 0.23 0.01 0 16 W=>S EMenor Frame-Wood Whole House 13 3 0 9 0 27.0 ft2 0.23 0.5 0 17 E=>N Neighbor Frame-Wood Whole House 13 6 7 9 59.3 ft2 0.23 0.01 0 DOORS # Omt Door Type Space Storms U-Value Width Height Area F1 In Ft In _ 1 S=>E Wood Whole House None .46 3 6 8 20 ft2 _ 2 N=-W Wood Whole House None .46 3 8 24 ft- 3 N=-W Wood Whole House None .46 3 8 2482 WINDOWS Orientation shown is the entered orientation => changed to As Built rolated 270 d re rs . Wall Overhang V # Oml ID Frame Panes NFRC U-Factor SHGC Area Depth Separation Int Shade Screening _ 1 S=>E 1 Metal Law-E Double Yes 0.3 0.25 64.0 k2 0 ft 0 in 0 ft 0 in Drapeslblinds None 2 W=>S 5 Metal Low-E Double Yes 0.3 0.25 64.0 ft2 0 ft 0 in 0 ft 0 in Drapeslblinds None 3 N=>W 11 Metal Low-E Double Yes 0.3 0.25 31.2ft- ft0 in 0ft0 in Drapeslblinds None 4 N=>W 11 Metal Low-E Double Yes 0.3 0.25 14.7 ft' 0 It 0 in 0 ft 0 in Drapeslblinds None 5 W=>S 12 Metal Low-E Double Yes 0.3 0.25 30.2 ft2 0ft0 in 0ft0 in DrapasNlinds None 6 S=>E 13 Metal Low-E Double Yes 0.3 0.25 32.0 ft2 0It0 in 0ft0 in Drapes/blinds None 7 $=>E 13 Metal Low-E Double Yes 0.3 0.25 15.1 ft 0 ft 0 in 0 it On Drapes/blinds None 11/8/201612:33 PM EnergyGauge®USA-FlaRes2014 Section R405.4A Compliant Software Page 3 of 5 FORM R405-2014 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation 1 492 W 492 W 351t 9 It 1 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000456 17563 9644 181.37 .4881 7 HEATING SYSTEM # System Type Subtype Efficiency Capacity Block Ducts 1 Electric Heat Pump Split HSPF:8.2 31.3 kBtu1hr 1 sys#1 COOLING SYSTEM # System Type Subtype Efficiency Capacity Air Flow SHR Block Duda 1 Central Unit Split SEER. 14 40.1 kBtuMr 1575 clrn 0.8 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.95 50 gal 80 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model# Collector Model# Area Volume FEF None None ft' DUCTS —Supply— —Return Air CFM 25 CFM25 HVAC# V # Location R-Value Area Location Area Leakage Type Handler TOT OUT ON RLF Heat Cod 1 A6ic 6 1001t. Garage 73.5 R' Prop.Leak Free Garage —cbn "A drn 0.03 0.60 1 1 11WO1612:33 PM EnergyGauge®USA-FlaRes2014 Section R405A.1 Compliant Software Page 4 of FORM R405.2014 TEMPERATURES Programableeling01Thermostatt:J n 01V rD01 MZ Ir 11 Ceiling Fans.`1X11 rDOIDec rr rDO, 11(DctfD01 rD01 Vent ng [ ]Jan [ ]Fab `XJ Mar [X7 Apr I May [ ]Jun [ ]Jul [�Aug [ ]5 p [X)Coott P9 No [ ]Dec_ Thermostat Schedule: HERS2006Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 fib 66 66 66 68 68 68 68 68 68 68 PM 68 fib 68 68 fib fib 68 fib 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 11/8/201612:33 PM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 5 of 5 FORM R405-2014 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 99 The lower the EnergyPerformance Index, the more efficient the home. Atlantic Beach, FL, 1. New conslmotion or existing New From Plans) 9. Wall Types Insulation Area 2. Single family or multiple family Multi-family a.Frame-Wood,Exterior R=13.0 1702.90 ft' b.Frame-Wood,Common R=13.0 573.00 ft' 3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=13.0 225.00 ft 4. Number of Bedrooms 2 it.N/A R= ft' 5. le this a worst case? No 10.Ceiling Types Insulation Area a.Under AlOc(Vented) R=30.0 601.00ft 6. Conditioned floor area(ft') 1469 b.Knee Wall(Vented) R=19.0 201.00 IF 7. Windows- DescriptionArea c.N/A R= ft a. U-Factor: ON,U=0.30 251.17 IF 11.Ducts R to SHGCSHGC--0.25a.Sup:Attic,Ret:Garage,AH:Garage 6 100 : b. U-Factor N/A W SHGC: 12.Cooling systems kBtwhr Efficiency a U-Factor: N/A W a.Central Unit 40.1 SEER 14.00 SHGC: tl. N/A ' SHGC:: ft13.Heating systems k8twhr Efficiency SHGC; a.Electric Heat Pump 31.3 HSPF:8.20 Area Weighted Average Overhang Depth: 0.000 ft. Area Weighted Average SHGC: 0.250 8, Floor Types Insulation Area 14.Hot water systems a.Electric Cap:50 gallons a.Slab-On-Grade Edge Insulation R=0.0 601.00 ft' EF:0.95 It.Flow over Garage R=13.0 338.00 fN c.NIA R= ft' b. Conservation features None 15.Credits Patel I certify that this home has complied with the Florida Energy Efficiency Code for Building f,tHE STgT Construction through the above energy saving features which will be installed (or exceeded) y0 = 6p in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code compliant features. Builder Signature: 42A Date: QZ o9 /2AO Address of New Home: ICz z1T4,-4i(_ Jl, City/FL Zip: / 3Z3z l>iN o wv'R'JPrial7�F(� Sae *Note: This is not a Building Energy Rating. If your Index is below 70,your home may qualify for energy efficient mortgage(EEM)incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotline at(321) 638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 11/8/201612:33 PM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 FORM R405-2014 Florida Department of Business and Professional Regulations Residential Whole Building Performance and Prescriptive Methods ADDRESS: Permit Number: Atlantic Beach,FL, MANDATORY REQUIREMENTS See individual code sections for full details. O 101.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) display card be completed and certified by the builder to be accurate and coned before final approval of the building for occupancy.Florida law [Section 553.9085,Florida Stalues)requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C. O R402.4 Air leakage(Mandatory). The building thermal envelope shall be constmded to limit air leakage in accordance with the requirements of Sections R402.1 through R402.4.4. 0 R402.4.1 Building thermal envelops. The building thermal envelope shall comply with Sections R402.4.1.1 and 8402.4.1.2.The sealing methods between dissimilar materials shall allow for differential expansion and connection. • R402.4.1.1 Installation. The components of the building themral envelope as listed in Table R4D2.4.1.1 shall be installed in accordance with the manufacturers instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. Where required by the code official,an approved third party shall inspect all components and verify compliance. • R402A.1.2 Tasting. The building or dwelling unit shall be tested and verified as having an air leakage rale of not exceeding 5 air changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Whom required by the code official,testing shall be conducted by an approved third party.A wri8en report of the results of the test shall be signed by the Parry conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fimplace and stove doors shall be closed,but not seated,beyond the intended weatherstripping or other infiltration control measures; 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not seated beyond intended infiltration control measures; 3.Interior doors,if installed at the time of the lest,shall be open; 4.Extenor tloors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5.Heating and coding systems,if installed at the time of the test,shall be turned off;and 6.Supply and return registers,if installed at the time of the test,shall be fully open. 0 R402.4.2 Fireplaces. New wood-burning fireplaces shall have fight-fitting flue dampers and outdoor combustion air. O R402.4.3 Fenestration air leakage.W inflows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 clan Per square foot(IS Us/m2),and swinging doors no more than 0.5 cfrn per square fool(2.6 Usmi when tested according to NFRC 400 or AAMAA4DMAICSA I01/LS.2IA440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Site-built windows,skylights and doom. O 8402.4.4 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not more than 2.0 chain(0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. 0 8003.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. 0 R403.1.3 Haat pump supplementary heat(Mandatory). Heal pumps having supplementary electrio-resistanco heat shall have controls Mat,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the healing load. 0 8403.2.2 Sealing(Mandatory)AII duds,air handlers,and filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered duds and plenum chambers,shall be constmded and sealed in accordance with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction or rough-in testing below, Dud tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section 553.99,Florida Statutes,or as authorized by Florida Statutes,to be'substantially leak free"by either of the following: 1. Post-construction test:Total leakage shall be less than or equal to 4 clan(113 Umin)Per 100 square feet(9.29 m2)of conditioned floor area when tested at a pressure differential of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturers air handler enclosure.All register boots shall be taped or otherwise sealed during the test. 2. Roughin test:Total leakage shall be less than or equal to 4 cfrn(113 Umin)per 100 square feel(9.29 m2)of condltioned floor area when tested at a pressure differential of 0.1 inches w.g.(25Pa)across the system,including the manufacturers air handler enclosure.All registers shall be taped or otherwise sealed during the lest.If the air handler is not installed at the time of the test,total leakage shall be less than or equal to 3 clan (85 Umin)Par 100 square feel(9.29 m2)of conditioned floor area. Exceptions: 1. Theta l leakage lest is not required for duds and air handlers located entirely within the building envelope. 2. Dud testing is not mandatory for buildings complying by Section R405 of this cotle. 11/8/2016 12:33 PM EnergyGauge®USA-FlaRes2014 -Section R40541 Com Page 1 of 3 FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) 0 R403.2.3 Building Cavities(Mandatory). Building framing cavities shall not be used as ducts or plenums. 0 R403.3 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying fluids above 105'1`(4VC) or below 55'F(13'C)shall be insulated to a minimum of R-3., R403.3.1 Protection of piping Insulation. 0 R403.4.1 Circulating hot water systems(Mandatory). Circulating hot water systems shall be provided with an automatic or readily accessible manual switch that can tum off the hot-water circulating pump when the system is not in use. 0 R403.4.3 Heal traps(Mandatory). Storage water heaters not equipped with integral heal traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets.External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3'h inches(89 mm)in the hot water distribution line and cold water line located as close as possible to the storage tank. 0 8403.4.4 Water healer efficiencies;(Mandatory). O R403.4.4.1 Storage water heater temperature controls 8403.4.4.1.1 Automatic controls. Service water healing systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature setting range shall be from 100°F to 140'F(38'C to SVC). R403.4.4.1.2 Shutdown. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off.A separate valve shall be provided to permit the energy supplied to the main bumer(s) of combustion types of service water heating systems to be tumW off. O R403.4.4.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of Table 0404.2 in Chapter of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stalled requirements for the appropriate water heating category. Solar water heaters shall met the criteria Section R4034.4.2.1. R403.4.4.2.1 Solar water heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Blended Thill Solar Domestic Hol Water System and Component Test Protocol,Collectors in installed solar water heating systems should meat the following cmena: 1. Be installed with atilt angle between 10 degrees and 40 degrees of the horizontal;and 2. Be installed al an orientation within 45 degrees of tme sou0. 0 R403.5 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code,Residential or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. 0 8403.6 Heating and cooling equipment(Mandatory). The following sections are mandatory for cooling and heating equipment O R403.6.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with RCCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and indoor units(6 split system)shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section 8302.1.This code does not allow designer safely factors,provisions for future expansion or other factors which affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. • R403.6.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load,but not more than 1.15 times greater than the total lead calculated according to the pmcedure selected in Section 403.6,or the closest available size provided by the manufacturers product lines.The corresponding latent capacity of the equipment shall not be less than the calculated latent load. 11/8201612:33 PM EnergyGai USA-FlaRes2014 -Section R405.4.1 Com Page 2 of FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) O R403.8.1.1 Cooling equipment capacity.(continued) The published value for AHRI total capacity is a nominal,rating-test value and shall not be used for equipment sizing.Manufacture's expanded performance data shall be used to select cooling-only equipment.This selection shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry bulb temperature for the load calculation(or entering water temperature for water-Source equipment),the blower cfm provided by the expanded performance data, the design value for entering was bulb temperature and the design value for entering tlry bulb temperature. Design values for entering wet bulb and tlry bulb temperature shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return ducl(s)is installed in an unconditioned space. Exceptions: 1. Attached single-and multifamily residential equipment sizing may be selected so that its coaling capacity is less than the calculated total sensible load but not lass than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer,in attached single-and multi-family units,the capacity of equipment may be sized in accordance with good design practice. O 8403.6.1.2 Heating equipment capacity • R403.6.1.2.1 Heat pumps. Heat pumps sizing shall be based on the cooling requirements as calculated according to Section R403.6.1.1 and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load. • R403.6.1.2.2 Electric reslstancefurnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.6.1. • R403.6.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.6.1. O 8403.6.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment acted or controlled to prevent continuous space cooling or heating within that space by one or mare of the following options: 1. A separate cooling or heating system is utilized to provide cooling or healing to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. O R403.7 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the Commercial Provisions in lieu of Section R403. 0 R403.8 Snow melt system controls(Mandatory). Snow and ice-melting systems,supplied through energy service to the building,shall include automatic controls capable of shutting off the system when the pavement temperature is above 55•F,and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is some 4WR O R403.9 Swimming pools,inground spas and portable spas(Mandatory). The energy requirements for residential pools and inground spas shall be as spaded in Sections R403.9.1 through 8403.9.3 and in accordance with ANSI/APSP-15.The energy requirements for portable spas shall be in accordance with ANSI/APSP-14. O R403.9.1 Pool and spa heaters. All pool heaters shall b s equipped with a readily accessible on-off switch that is mounted outside the heater to allow shunting off the heater without adjusting the thermostat setting. R403.9.1.1 Gas and oil- rxd pool and spa heaters. All gas-and oil-fired pool and space heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013 when tested in accordance with ANSI Z 21.56. Pool healers fired by natural gas or LP gas shall not have continuously burning pilot lights. R403.9.1.2 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test repo"from an independent laboratory is required to verity procedure compliance.Geothermal swimming pool heat pumps are not required W meet this standard. 0 R403.9.2 Time switches. Time switches or other control method that can aulomabcally tum off and on healers and pumps according to a preset schedule shall be installed on all heaters and pumps.Healers,pumps and motors that have built in timers shall be deemed in compliance with this equipment. Exceptions: • 1. Where public health standards require 24-hour pump operations. 2. Where pumps are required to operate solar-and waste-heat-recovery pool heating systems. 3. Where pumps are powered exclusively from onsite renewable generation. O R403.9.3 Covers. Heated swimming pools and inground permanently installed spas shall be equipped with a vapor-retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Outdoor pools deriving over TO percent of the energy for heating from site-recovered energy,such as a heat pump or solar energy source computed over an operating season. 0 RR404.1 Lighting equipment(Mandatory). A minimum of 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or a minimum of 75 Percent of permanently installed lighting fixtures shall contain only high efficacy lamps. Fxception: Lowwoltage lighting shall not be required to utilize highafficacy lamps. 0 R404.1.1 Lighting equipment(Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights 0 R405.2 Performance ONLY. All duds not entirely inside the building thermal envelope shall be insulated to a minimum of R46. 0 R405.2.1 Performance ONLY. Ceilings shall he"minimum insulation of R-19.Where single assemby of the exposed deck and beam type or concrete deck roofs do not have sufficenl space,R-10 is allowed. 11/8/2016 12:33 PM EnergyGaugi USA-FlaRas2014 -Section R405.4.1 Com Page 3 of 3 FORM R405-2014 TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Aquatic Townhomes-Bldg 3-Unit305Builder Name: Tribddge Residential Street: Permit Office: Duval City,State,Zip'. Atlantic Beach,FL, Permit Number. Owner: TnBridge Residential Jurisdiction: Duval 261 NO Design Location: FL,MAVPORT_NS COMPONENT CRITERIA CHECK Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. Exterior thermal envelope contains a continuous barrier. Breaks or joints in the air barrier shall be sealed. Air-permeable insulation shall not be used as a sealing material. Ceiling/at is The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier shall be sealed. Access openings,drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Comers and headers shall be insulated and the junction of the foundation Walls and sill plate shall be sealed. The junction of the top plate and the top or exterior walls shall be sealed. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Knee walls shall be sealed. Windows, skylights and doors The space between window/doorjambs and framing and skylights and framing shall be sealed. Rim joists Rim joists are insulated and include an air barrier. Floors (including above garage Insulation shall be installed to maintain permanent contact with underside and cantilevered floors) of subfloor decking. The air barrier shall be installed at any exposed edge of insulation. Crawl space walls Where provided in lieu of floor insulation,insulation shall be permanently attached to the crawlspace walls. Exposed earth in unvenled crawl spaces shall be covered with a Class I vapor retarder with overlapping joints taped. Shafts, penetrations Duct shafts,utility penetrations,and flue shaft openings to exterior or unconditioned space shall be sealed. Narrow cavities Bafts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Recessed lighting Recessed light fixtures installed in the building thermal envelope shall be air tight, IC rated,and sealed to the drywall. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls,or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Shower/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated and the air banner installed separating them from the showers and tubs. Electrical/phone box on The air barrier shall be installed behind electrical or communication boxes or air sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub-floor or drywall. Fireplace An air barrier shall be installed on fireplace walls.Fireplaces shall have Basketed doors 11/6/201612:33 PM EnergyGauge®USA-FlaRes2014 Section R4054.1 Compliant Software Page 1 of 1 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Envelope Leakage Test Report Prescriptive and Performance Method Project Name: Aquatic Townhomes-Bldg 3-Unit 305 Builder Name'. Tribridge Residential Street: Permit Office: Duval City,Slate,Zip: Atlantic Beach,FL, Permit Number: Design Location: FL,MAVPORT_NS Jurisdiction: Duva1261000 Cond.Floor Area:: 1469 sq.ft. Cord.Volume: 15057 cu ft. Envelope Leakage Test Results Leakage Characteristics Regression Data: C: n: R: CFM(50): Single or Multi Point Test Data HOUSE PRESSURE FLOW: ELA' 1 Pa cfm EgLA: 2 Pa cfm ACH: 3 Pa cfm ACH(50): 4 Pa cfm 5 Pa cfm SLA. 6 Pa cfm R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes par hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches S.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A whiten report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doom,fireplace and stove doom shall be closed,but not sealed,beyond the intended weatherstripping or other infifiration control measures; 2.Dampers including exhaust,intake,makeup air,backdraft and Flue dampers shall be closed,but not sealed beyond intended infiltration control measures; 3.Interior doors,H installed at the time of the test,shall be open; 4.6denor doom for continuous ventilation systems and heat recovery ventilators shall be closed and sealed 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and B Supply and return registers,if installed at the time of the test,shall be fully open. I hereby certify that the above envelope leakage Where required by the code official, OF III STgT� performance results demonstrate compliance testing shall be conducted by an with Florida Energy Code requirements in approved third party.A written accordance with Section R402.4.1.2. report of the results of the test shall be signed by the third parry conducting the test and provided to SIGNATURE: the code official PRINTED NAME: e�COD WE'1'�J�e BUILDING OFFICIAL: DATE: DATE: 11/8201612:33 PM EnergyGauge®USA-FlaRes2014 -Section 8405.4.1 Compliant Software Page l oft FORM R405-2014 Duct Leakage Test Report Performance Method FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Form R405 Duct Leakage Test Report Performance Method Project Name: Aquatic Tovmhomes-Bldg 3-Unit 305 Builder Name: Tnbndge Residential street: Permit Office: Duval City,State,Zip: Atlantic Beach,FL, Permit Number: Design Location: FL,MAIPORT_NS Jurisdiction: Duval 261WO Duct Test Time: Post Construction Duct Leakage Test Results CFM25 Dud Leakage Test Values Line System Outside Dud Leakage 1 System 1 cha25(Out) 2 System 2 dm25(Out) 3 System 3 dm25(Out) 4 System 4 dm25(Oul) 5 Total House Sum lines 1-4 Duct System Divide by Leakage (Total Conditioned Floor Area) _ (Qa,000 I certify the tested dud leakage to outside, Qn, is BS not greater than the proposed duct leakage On Dud lightness shall behverified by RESNET �'f1t -TgpE, specified on Form R405-2014. testing to Section 803 off the �Y OA Standards by an energy rater certified in accordance with Section 553.99, Florida Statutes. O SIGNATURE: PRINTED NAME: aCOD WEggV'�s DATE: BUILDING OFFICIAL: DATE: 11/6/201612:33 PM EnergyCauge®USA-FlaRes2014 -Sedion R405.4.1 Compliant s Page 1 of 1 FORM R405-2014 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2014 Florida Building Code, Energy Conservation via the residential Simulated Performance method shall include ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report(1 page)and an input summary checklist that can be used for field verification (usually 4 pages/may be greater). ❑ Energy Performance Level(EPL) Display Card(one page) ❑ Mandatory Requirements(three pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report(usually one page) ❑ I1 Form R405 duct leakage type indicates anything other than "default leakage", then a completed Form R405 Duct Leakage Test Report(usually one page) ErergyGauge®-USRRPB v5.1 1118/2016 72:33]8 PM Page 1 of 1 Energy Sheet calculations scanned under 16-SFAT-1793