4-10-17 City Manager Handout April 10, 2017 MEMORANDUM TO: The Honorable Mayor and Members of the City Commission FROM: Kevin Hogencamp Interim City Manager SUBJECT: City Manager's Report About this report. This report contains an update on City Manager's Office activities. Potential upcoming City Commission agenda items typically are listed first, followed by miscellaneous updates, communications and departmental reports. I hope the City Commission, citizenry and staff find this avenue of communication to be valuable. As always, I welcome feedback and questions at 247-5806 or khogencamp@coab.us. Special called meeting.This is a reminder of the special called meeting on Wednesday,April 12. The agenda package is attached; the topics are Community Redevelopment Agency and Form-Based Code Land Development Regulations. City manager search. Corresponding with the item on tonight's agenda under city manager's report, I've attached the adjusted timeline for the city manager recruitment and selection process. I will review the timeline with you during tonight's meeting. Police chief recruitment.Applications are being accepted until mid-April. From there, we will proceed with haste with the interview, due diligence and selection process. Please expect an updated timeline and description of the process from me by April 18. Beach access and parking issues. This matter, especially at it pertains to the issues on 18th Street, is a foremost topic of discussion of city staff. By this week's end, I will reach out to the residents who spoke at the March 27 meeting and others who have volunteered to provide input on this matter. Mayport Road traffic safety. This is another very active discussion among city staffers, including but not limited to the police and public works departments. More information will be provide to the City Commission—and, especially, the public—in the coming weeks. Seminole Road project. Public Works Director Don Jacobovitz reported to me today that the city's consultant on this project, Genesis Engineering, is expected to return the completed plans to the City by the end of this week. As such, permitting plans are expected to be completed—and the project is expected to go out to bid—in May; a contract is expected to be awarded by late July; and construction is expected to be completed in the first quarter of 2018. I have asked that the project be bid as a whole and as an alternate project that only contains the stormwater element of the project. Safe Routes to School(SRTS)project.At consultant Element Engineering's request, city staff recently contacted all residents along the SRTS path to inform them of potential changes in the project's scope(i.e.the path being moved closer to their property lines).The consultant reports that they expect to get the 60-percent plans to the City about April 21. A public informational meeting will be scheduled shortly thereafter;then,the consultant can continue to the 90-percent plans submittal threshold. Public Works Director Don Jacobovitz reports that it's conceivable that the project will be approved,permitted and put out for bid in time for a fall 2018 completion Beach and dune restoration.As we feared, the upcoming renourishment project stops at 171 Street moving northward. The attached emails authored by City Council member Bill Gulliford and coastal engineer Kevin Bodge provide some details about the project, which is slated to restart on April 13. Budget calendar. 'Tis the season, starting today. I've attached our budget calendar,which—as you very well know—is a fluid document. Please let me know when you have input along the way. Arbor Day Proclamation.Arbor Day, on which communities celebrate the benefits of trees and the work involved in planning and maintaining them, is April 28. One of the standards for Tree City USA recognition established by the Arbor Day Foundation and the National Association of State Foresters is for the City Commission to pass an official Arbor Day proclamation. In addition to proclamation being on the City Commission's April 24 meeting agenda, city staff is making plans to engage the public in a community celebration and an ongoing program to educate the public about proper tree care. The other Tree City USA recognition standards are having a tree board or department(our Community Development Department meets this requirement), a tree care ordinance and a program with an annual budget of at least$2 per capita. City Hall space and service issues.We have identified that there are opportunities for efficiencies and providing better customer service to residents and other customers at city hall. As such, a team of staffers is performing due diligence on this topic. If you have any input on this matter,please let me know. Juvenile Diabetes Research Foundation fund-raiser.The annual walk was April 8 in downtown Jacksonville. Thanks to the heroic efforts of Public Works Director Don Jacobovitz and the support of city employees,the City has collected$1,289—and Don reports that donations are still being collected. ' S CITY OF ATLANTIC BEACH SPECIAL CALLED CITY COMMISSION MEETING APRIL 12,2017- 6:00 PM AGENDA Invocation and pledge to the flag Call to order 1. Courtesy of Floor to Visitors 2. Community Redevelopment Agency 3. Form-Based Code Land Development Regulations (for discussion) Adjournment Please Note: This meeting will be live-streamed and videotaped and can be accessed by clicking on the Commission Meeting Video tab located on the home page of the City's website at www.coab.us. If any person decides to appeal any decision made by the City Commission with respect to any matter considered at any meeting, such person may need a record of the proceedings, and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record shall include the testimony and evidence upon which the appeal is to be based. Any person wishing to speak to the City Commission on any matter at this meeting should submit a request to the City Clerk prior to the meeting. For your convenience, forms for this purpose are available at the entrance to the Commission Chambers. Every effort is made to indicate what action the City Commission is expected to take on each agenda item. However, the City Commission may act upon any agenda subject, regardless of how the matter is stated on the agenda. In accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing special accommodation to participate in this meeting should contact the City Clerk by 5:00 PM, Tuesday,April 11,2017. 1 Item 2-CRA Special Called Meeting 4-12-17 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Community Redevelopment Agency SUBMITTED BY:. interim.City Manager Kevin Hogencamp 4,�• 1-- DATE: April 7, 2017 BACKGROUND: At the March 27,2017 City Commission meeting,a consensus was reached to put consideration of establishing a Community Redevelopment Agency on the agenda at a special called April 12 City Commission meeting.. ATTACHMENTS: 1. Mayport Road Redevelopment Plan 2. CRA Combined Meeting Minutes and Outreach Files 3. 9-26-16 CRA Workshop Minutes Item 3-Form-Based Code LOR Special Called Meeting 412-17 CITY OF ATLANTIC.BEACH CITY COMitiossioN MEETING STAFF REPORT AGENDA ITEM: Form-Based Code•Land Development Regulations SUBMITTED BY: Interim City Manager Kevin liogencamp for City Commissioner Blythe Waters . fk DATE: April 7, 201'7 STRATEGIC PLAN: None BACKGROUND: Following Commissioner Waters'presentation during the March 27r 2017 City Commission meeting,a consensus was reached to put the consideration of Form-Based Code Land Development Regulations on the agenda for discussion at a special called April 12 City Commission meeting. Commissioner Waters asked-that the fallowing information be shared in advance of the special called meeting: ATTACHMENTS: 1. Form-Based Codes Defined 2. Miarni 21.Zoning Codes 3. Types of Zoning Codes 4. Article-Neighborhood input Shapes Form-Based Codes LINKS: w ividormbasedcodes.org(Website of Farm-Based Codes Institute) www.vimeo.com/134977151(Video summarizing the Formed-Based Codes 101 course) 3. https://courses.planetizen.com/course/form-based-codes-101-intro(Form-Based Codes 101 video course) Item 3-Form Based Code LDR Special Called Meeting 4-12-17 Form-Based Codes Defined Form-Based Code /form-based 'cod/ noun 1. A form-based code is a land development regulation that fosters predictable built results and a high-quality public realm by using physical form (rather than separation of uses) as the organizing principle for the code. A form-based code is a regulation, not a mere guideline, adopted into city, town, or county law. A form-based code offers a powerful alternative to conventional zoning regulation. Form-based codes address the relationship between building facades and the public realm, the form and mass of buildings in relation to one another, and the scale and types of streets and blocks. The regulations and standards in form-based codes are presented in both words and clearly drawn diagrams and other visuals. They are keyed to a regulating plan that designates the appropriate form and scale (and therefore, character) of development, rather than only distinctions in land-use types. This approach contrasts with conventional zoning's focus on the micromanagement and segregation of land uses, and the control of development intensity through abstract and uncoordinated parameters (e.g., FAR, dwellings per acre, setbacks, parking ratios, traffic LOS), to the neglect of an integrated built form. Not to be confused with design guidelines or general statements of policy, form-based codes are regulatory, not advisory. They are drafted to implement a community plan. They try to achieve a community vision based on time-tested forms of urbanism. Ultimately, a form-based code is a tool; the quality of development outcomes depends on the quality and objectives of the community plan that a code implements. Conventional Zoning Density use, FAR (floor area ratio), setbacks, parking requirements, maximum building heights specified • Zoning Design Guidelines c • Item 3-Form Based Code LDR Special Called Meeting 4-12-17 Conventional zoning requirements, plus frequency of openings and surface articulation specified • amu,: Ps. f • ,,r . Form-Based Codes Street and building types (or mix of types), build-to lines, number of floors, and percentage of built site frontage specified. y k,:. >11D-,4?4,-.-41.-(-1.-.1.1 `'Q/49i��p rte! Boit 7 5 AI. . ,- . pp- - -;.kik.., , _., Five Main Elements of Form-Based Codes 9. Regulating Planpig }_" _ �'� *� eer , 1-Mir- 1.kin liWk7d, ,k.plan or map of the regulated area designating the locations where different 'bui :nig orm standards apply. 2. Public Standards ,__'n-' : Specifies elements in the public realm: sidewalk, travel lanes, on-street parking, street trees and furniture, etc. 13. Building Standards • Item 3-Form Based Code LDR Special Called Meeting 4-12-17 C I °Regulations controlling the features, configurations, and functions of buildings that define and shape the public realm. 4. Administration clearly defined and streamlined application and project review process. .5. Definitions f.Mlf Im leu Y.'S NI.°..$0110 'llw cwJ e Y 1ter--_—_._A_glossary to ensure the precise use of technical terms. Additional Optional Elements rchitectural Standards Re•ulations controlling external architectural materials and quality. Irl+-• - Landscaping Standards Regulations controlling landscape design and plant materials on private property as they impact public spaces. e. Signage Standards Regulations controlling allowable signage sizes, materials, illumination, and placement. Item 3-Form Based Code LDR Special Called Meeting 4-12-17 i Environment.Resource Standards Regulations controlling issues suchas storm water drainage and infiltrations development on slopes, tree protection, solar access, etc. .rit4. -. I., 1- --; mil [-- ,IA., _,.....,:.::-.• w -- i nnotation Text illustrations explaining the intentions of.specific code provisions. Examples FBCI gathers examples of well-designed form-based codes from communities across the U.S. and abroad to aid research,and plan making. Selections such as the Regulating Plan of Peoria, and the Building Envelope Standards of Pleasant Hill Bart Station offer a glimpse of best practices in the design and implementation of form- based codes. Please also browse the Library of Codes and.the Driehaus Award page for further examples. Or watch Bill Spikowski's video presentation "Creating Urban Form"for and in-depth look at history and practice of form-based coding. Item 3-Form Based Code LDR Special Called Meeting 4-12-17 i :1j2J,..,„ • ...• Types of Zoning Codes ��p `� ` `" There are two main approaches to contemporary zoning; Euclidean Zoning Codes and Form-Based!ening'1:s. These two approaches create different patterns of development/results based on their goals. Our current zoning code is a Euclidean code,Miami 21 is a Form-Based code. Euclidean Zoning Codes Form-Based Zoning Codes ;r. ` ` .- 9 .`./ _ 'i • A type of zoning named For the Village of Euclid, Ohio where Form-Based Zoning Codes are a method of regulating development zoning was upheld In 1926 as a legitimate governmental power. to achieve a specific urban form. Form-based codes place an These codes are characterized by establishing and regulating emphasis on the relationship between the street and buildings, land based on use. Typical types of land-use districts In pedestrian and vehicles, public and private spaces, and the Euclidean zoning are: residential, commercial, Institutional, and relationship between multiple buildings,a block, a neighborhood and Industrial, Euclidean Zoning Is also referred to as "Traditional transitions In scale. They create a predictable public realm by Zoning"or"Building Block Zoning." controlling physical form of private developments, with a secondary focus on land use regulations, Elements of a Euclidean Code: Elements of a Form-Based Code: n Regulations and Atlas.A plan and neap of the regulated " Regulations and Atlas.A plan and map of the area indicating the type of allowed activities and regulations. regulated area Indicating the type of allowed activities and Special district regulations that address each problem regulations. Individually Building Form Standards.Regulations controlling the Special Exceptions,Class II permits,MUSP permits configuration,features,and functions of buildings that define Overlay districts an interaction between the public and private realm. 4 Administration.Application and lengthy project review process Illustrations of technical aspects. d Definitions, Public Space/Street Standards.Specifications for the elements within the public realm z' Administration.A clearly defined application and project review process. " Definitions, Goals of Euclidean Zoning: Goals of Form-Based Zoning: • Prevention of illegal overcrowding(goal was a reaction to 0 Mixed-use activities within buildings and blocks of the city—that historical conditions of cities) are walk-able distances of offices and residences • Separation of uses based on size,height,noise,pollution, u Promote walk-ability through a greater emphasis on the pedestrian parking requirements as only urban goals. spaces ` Promote transit by establishing nodes of greater intensity concentrations Outcomes: Outcomes: • Suburban sprawl with segregated land uses a Zoning areas with greater intensity • Bedroom communities with long commutes 4 Mixed-use zones a Automobile-dependent,unsustainable development patterns 2 More transitional zones created by emphasis placed m form rather than use a Excess parking and streets built only for cars '' A more predictable physical result based on prescriptive standards(state • Necessary Special Districts to address areas which require what you want)rather than proscriptive standards(state what you don't want) mixed uses or other configurations outside the standard"uses" A zoning code that is pro-active rather than re-active ., Cedes and regubtions that are easier to read for damns and rrxxe firedidable Item 3-Form Based Code LDR Special Called Meeting 4-12-17 T •_., of Z non • Codes l t ,� r+ JAN 21 2014 In the early twentieth century, American cities looked much different than they do today. In heavily urbanized areas, houses, shops, and factories could often be found on the same block, and many city-dwellers sent their time in overcrowded buildin•s that suffered from •oor natural Il•htin•. While mixed-uses meant that most cities were more walkable than they are today, tha+ same proximity created health and safety hazards for urban residents. Pollution was rampant, streets were dangerous, and noisy bars and factories disturbed nearby apartment dwellers late into the night. Outside the industrial cities, new suburbs were being developed rapidly, marketing peace and quiet to draw residents out to the countryside. The architects behind these new communities hoped to create neighborhoods that would stand the test o' ime, but they worried how they could safeguard these areas from ref roducin• the same htta thhand..safet hazardsatbatts•revailed downtown. The tool these planners, developers, and architects ultimately created was the zoning code. By strictly defining what can and cannot be built in different areas, and establishin• unified development standards for residential, commercial, and industrial districts, zoning codes enabled these new communities to more harmoniously distribute land uses across space, and to confine hazardous uses to areas more •h sicall removed from residential nei•hborhoods. oday, zoning codes remain common prac 'ce in community development. Because zonin• is a local process, tailored to the unique needs, circumstances, and aspirations of each municipality, numerous varieties of codes have developed over the years as communities have independently attempted to address these concerns. Despite these variations, mos Item 3-Form Based Code LDR Special Called Meeting 4-12-17 oning codes may be classified into one or more of the following broad categories: EUCLIDEAN ZONING, PERFORMANCE/ IMPACT ZONING, INCENTIVE ONING, FORM.:MED ZONING, and HYBRID ZONING. EUCLIDEAN ZONTN I 44 • •;c, er The most corntnon form of land=use regulation in the United States is known as Euclidean zoning. Euclidean zoning is not, in fact, named after the eminent Greek mathematician, bu rather after the Village of Euclid, Ohio, where in 1926, a development company famous) challenged the constitutionality of the local zoning code. Euclid's code had placed heigh and use restrictions on different zones, and the developer argued that by limiting what could and could not be built on undevelo•ed •ro•ert , the code had unfalrl reduced the value o' its landholdin•s. In a lank decision, the U.S. Supreme Court ruled in favor of the local government, declaring that zoning codes are a valid extension of a city's right to regulate land uses In the name of protecting public health, safety, and welfare (Villsge of Euclid, Ohio v. Amble Realty Co,, 272 U.S. 365 (1926)). Because Euclid's code had segregated different land uses, with housing In one place, shops in another, and factories elsewhere, communities nationwide began following the Euclidean model, believing it to be the most effective way to meet the health safet , and welfare clause. The Euclidean format soon became standard zonin• •ractice. As part of isolating 'In, o patible' uses, Euclidean codes sort possible land uses into broader categories, usually classified agricultural, residential, commercial, Industrial, institutional, or open space. For example, the 'candle manufacturing' use is identified as an 'industrial' use, and is thus only allowed to take place in industrial zones. Each zone has its own height, setback, parking, landscaping, and building volume restrictions that vary with Intensity. For instance, low-density residential areas tend to cap the height of houses a two-stories while high-densit residential zones ma allow a•artment towers u• to twent - stories or more in height. Item 3-Form Based Code LDR Special Called Meeting 4-12-17 Some uses are permitted 'by right,' meaning they require no special review from city staff, while others are designated 'conditional' uses that require a public hearin• in which s•ecial conditions are created to address a •ro'ect's uni•ue im•acts. UVh1 a 'ucifd'ean zoning has enabled cities to avoid unnecessary noise, glare, and pollution impacts resulting from the incompatible placement of uses, some communities have sou•h alternatives to Euclidean codes, perceiving that they have a tendency to produce cities where most trips must be made in a private vehicle, and where the mixed-use nel•hborhoods that 21" centu Americans have come to exsect, are discoura•ed. PERFORMANCE / IMPACT ZONING • • • • , 1 Often using Euclidean zones as a foundation, the Performance and Impact zoning techniques enable more unusual land uses to move into existing zones If they conform to a fixed set of standards established for that district. Differing land uses produce varying external Impacts, ranging from traffic and noise to glare and waste generation. Unde Impact zoning, performance standards are established to manage those impacts and bette promote compatible development. For instance, a gym might be able to open in a medium density residential area if it closes at 9pm, is only one-stor in heisht, and will not •ush traffic levels above an established, acce•table threshold. Ano tier tectii'nique—performance zo ng—uses a variety of dimensional ratios to regulat- land-use intensity. Examples may include floor area ratio or'FAR' (the ratio of building floo area to lot area), open space ratio (the ratio of open space to overall site area), and livabilit j space ratio (the ratio of non-vehicular space such as lawns or landscaping to total site area). These are often used to address specific site im•acts, from shaft,kand.o•en sac- •ualit to.the size and •Iacement,of •Arkin• lots. Although performance and impact zoning move away from stringent land-use separation, they do so by requiring greater time and monetary inputs. Many of the performance Item 3-Form Based Code LDR Special Called Meeting 4-12-17 standards require sophisticated measurement techniques that staff must be trained to use. Moreover, these standards tend to have little direct relationship to the look and feel o' resulting development. For example, a site with a permitted 1.0 FAR could contain a 2- story building that covers half the site, or a 4-story building that occupies a quarter of the site. Residents that may have expected shorter buildings from this 1.0 standard may be disappointed with the results. For these reasons, the Impact zoning approach is typical) selectively applied in certain districts, or else combined with other zonin• a• 'roaches, rather than im•lemented as a standalone •ractice. INCENTIVE ZONING ! t ; t �� y Aulty „rte I 154 41 1[1 Like the previous techniques, Incentive zoning uses Euclidean zoning as a baseline. Yet to permit greater diversity and flexibility within those Euclidean zones, incentive zoning enables projects to exceed standard requirements if they provide some form of benefit to the local community. For example, in exchange for providing amenities (like parks, plazas, transit access, public art, or affordable housing), projects are usually allowed to build a higher densities or to greater building heights than are typically allowed. In many cases, this balancing act between development and community improvement occurs through a discretionary process that attempts to match the intensity of additional development to the scale and •uailt of the benefits •rovided. This can re•uire si•nificagt,staftime to determine. FORM-BASED ZONING . . . • Item 3-Form Based Code LDR Special Called Meeting 4-12-17 . - • ' '• .... . - •-• . , i _..,, ._ , , ...,„—.2'4713)74P1 ,Pit,...., e a',.. •,' 1 ' '''-::,: ' . ' `,nr-T6114_,,,,,,,,,, Lt!:'..-1,2 l'',1-.;,7,....- .7.-rts•-',1-;...•••,.us•----- _ : i' . ' ;" '1' L'..':•••'''';',-7-.7-7•••'••=7,•r....J j!,J.•Alf,. oit g iii, - • r; I ••' .'.''.-‘•7''1 I .. . . _ - . - . • • . i * -I.'''.' •'' •• :-I 1 ' 1 - • ' . . I • 1 I 71 77-`-1---2';'-'''-747;7';'71,111•Ifrt 0,11 . '.;. .. . . ..• - ', . . • , , • •••ilcriFit:1_,V,,r• 'Z'A.,;' !;at,, . ..1 • . I • , . ' 11111.044;,. ow 1..3.-ttl....:7 -,;,4-,i,,..',,-1,..,,14.'T'I".'-';'•'..:j-ct,1"..11-1 '..j.,,-j,•6•,:, ,. - .4 , % . •--• -Id :r.;!,fqW,,•'.•'7 n "-"k:-.,,, t.- '''' J 1,",— .,, ..;", .7:j[2.Flt;-S 7'7;,1-.73,1,..':- ril.4; ! 11-7,'1'.."------'-'1271Fr..r1. ,1114,.,.i:_„..,._.7 L,,; A -,,• .11 fp,..1 pi, ,, ,,,..,, ,, . 1,,,,, ,„ 1 ,, ...., Willit.Tr`i,lit-rre4"44clii":,-q11;riiili , r 4:1;;L-144,1t4 c-11a.4.,ifig}1,8,11-1 `,,t114i.,t'l.'4.-tr.I.'.,1•]-..,;t4A-4,,:. ,P,,,rf.,..,$..,46 .,-._„'.-,-'7,- , - ,, ..„,.1, .,..--,-,--f-m, ii-meTi.w.l.:--4V71''f 1,,t'l:''_.?-7"L'I..t*--L.,rf---.-it-ilgrY.V.Ir-i't1,-:14•1:I r.:]".' ',11',:j-'1 i.,`/.!-;----:';1.-:-!-..-;`,,.'01.'.'-''t r.'.:.ir:':ti.---.1.c....:1-y 4:1-',;',..4-T;`'.1.-•-,r;,-.:,:-:•i/,,.1'..;''.,:'...q .-,;:.?..-.,''''i•%.".-',;':,'i-:7•77.-:'; •-.-"I.,'-'E.-; '';'''' 'IT.', .' - •'• • '• • .„• •' ; • ! ••• J • t ,. • -I, 'r - , •, ,...,„,. 1.; '.-;'-''''.7;1:--7'''''-'''''''-•'''''t-`t•:''/--G 1,::.' L'- -'F;E-I:;i :-'::;1 --i.Isf i' ,C.•ti E:11.,: --Ic:1-,:-1'. -•1 .1,..:c1 .':„:..,:'r.„..,, ,.; 1...i.; 1...:....1..,.!,,0 It,, 7,1.11111 t, ,,,,z7 11 0.1,..,,., -..7'7, 11r 1ti .1v:.A.f.! iP,7• 71,-;',0 ...Or.17 M ' ' " • • ; 1 .iitIP,' ----dlaW.-i.-41'411-atki•44.v.A.razAltzk,... .. ' " -'' "-----•' ' - -- . , .. .." ,,Li_c., ...4,_.-..4.....,4..,,4.-;4, .; 1..r;0,4 ,,._.,-.;.,..„_....;,,,,,..z.,..._..4.;....,.j.„,,,,,., ,,,,-,,,,•,•:,j I.-. -•.,,,,,.••I.;;4,, ;;_•.,•I, J..;t ••: ••-•,-.„..';-.-,,,•1,...:::'-'..- ,•:'' ;',•i•IJ'•%.,•14) , .T:C•1:;,••'Z'';',..t ! ilipl t;,':1''-',t_ 711-'1 .1-.7'17117 11- 11'1X;11.11.1:1.1.-11,,,,,,,,11:11*:1'41i'7'1'1':' 7.. . .','''11 17'''''''1- • V LP'1.1;1.1‘1';',11,. , i:Iblis'Ci.I., , 1140g0.411004114401;-("1...::TIV.4 I 1 -0..:, " 1.19 ;1,1.1 7. , It.WmINVe..,42 2`,..,,,,,T,IV 1,1,:t.,,,,, -1,M 4,7,,,!•,, ...k,.., ,4i, . .,.. r,,, ..,,, ,,„r,iii.„.,',,+,1'';',Elagl,,,r1;;;; '' " : .'";: 11•.I.N 1,4;...--el 4t4. - '4 .1' '''v;;J.T-ITis'4'"FaZ-4.-- !r.-4,:' 1 C-1:1'L,,r,r,"4,4"Fr.' -- ..-,' 1 5•1 i.i! d,..1- t• ••••!t L '..-77:!'--7,';';•,-. 1 ,; ,1 • , . - ,• ••' - ;r•-.- - • ;-• • • . ,• - •! i 1;1'16.('-...".1,',---',:.1;„4' .i::71 L'I'11.t.C..''"-;.(101r''-'; -.,• i'"'1';','''-'L....%....1:17.1.,'- '1'1 ' :.:1 --; '••*1• - ; • ! 1 ' ".. . ' ". ' • - •• .1 1-., '...`----...'..s.a.-41.;11i•1!r.....e.;•.....4.-'1.,;,:;;"..ii;;: ' ' -- " • • • .-.1.:, ttaPtililq c.;c Ittlabtad='4 : •'' '"."' ' ' ' ". ;4; ; .. .,,..1,1j.:-.,1,4,,-.44.1,;.; ...; ;. 1,,,...:;. ::-.I.;g4''•I•i°!!,t'll''''- .111;;t' Id 1' .„., .r- ,. ,_ 0 --, -- . . . . . • 1 Item 3-Form Based Code LDR Special Called Meeting 4-12-17 111. used ti 13 Zoning r. Most modern zoning codes contain elements of the various approaches Introduced above. They often employ traditional Euclidean zoning districts(especially in single-famil residential areas)while applying performance zoning standards to more intensely- developed neighborhoods. They also tend to introduce incentive zoning to reduce parkin• and create affordable housing, while implementing form-based regulations in dense downtown areas. This modern practice of combining philosophies is often referred to as Hybrid zoning—an approach that identii[esthe best elements of each •ractice and inte•rates them into a new whole. Modular(or'Composite')zoning is a specific type of hybrid zoning. It takes three fundamental components of development—use,form, and orientation—and mixes and matches them to create a wide variety of zoning districts. The 'use' component establishes the types of land uses (residential, commercial, industrial, etc.) permitted within a zoning district, while the 'form' element delineates height limits, entryway typologies, façade design standards, and so on. Finally, the 'orientation' component defines how the site is arranged, with standards for where buildings are placed in relation to sidewalks, where landscaping and open space are provided, and where pedestrians are expected to access the site. An j combination of these components creates a zoning district, meaning that zones ma be much more intensely customized to the unique needs of each community. -See more at: http://recode.la/updates/news/types-zoning-codes#sthash.OsP7gPuD.dpuf . Item 3-Form Based Code LDR Special Called Meeting 4-12-17 • — Once again, Karin Murphy is meeting with neighborhoods to refine the forthcoming form-based code. The authors of a new citywide-zoning code are attempting to tailor the regulations based on feedback from residents— which means a final product is dill a long way away, by: David Conway Deputy Managing Editor In June 2013, the city hired a pair of consultants to conduct a two-and-a- half year effort to write a new set of citywide zoning regulations. Three-and-a-half years later,Urban Design Studio Director Karin Murphy is still working on writingthatform-based code. She has a new partner, Senior Planning Technician Briana Dobbs, to help finalize the eight- chapter zoning document. Item 3-Form Based Code LDR Special Called Meeting 4-12-17 In October,Murphy shared•a rough draft of the codewith city staff.The draft outlines the planners' strategy for.creating a more urban environment in Sarasota while creating better predictability for residents and developers.Butshe said Wil probably be another year before hearings begin on adopting a final version of the new regulations. After years of workshops with residents and with an exhaustive formal pubiic-review process awaiting once the code is finished — the Urban Design Studio has spent January meeting with members of neighborhoods thrciughout the City. it's another opportunity for Murphy to share her vision::and for residents to tell her what aspects they do and don't like. "There's only two of us and 55,000 of them.," Murphy said. "We had to get a good structure going to get feedback." She's aware of the trepidation surrounding the new code.The resident activist group STOP! is working to prevent the expansion of the administrative-approval process,which allows the city staff to evaluate whether a proposed development satisfies the applicable regulations. Individual neighborhoods are worried about significant changes to the fabric of their area. Murphy is intent on tailoring the code to the specific predilections of city residents.There's a point at which she'll tell people their desires are not in line with the principles of New Urbanist planning, but she's trying to reach that point as infrequently as possible. "My ultimate goal with them always is to build consensus," shesaid. "If we don't build consensus, the code won't be adopted." "If we don't build consensus,the code won't be adopted."-- Karin Murphy That approach is producing an unusually narrowly focused form-based code.The second article of the zoning code, for example, contains an index of specific regulations that apply to individual neighborhoods.This is a finer-grain approach than traditional form-based codes, which apply more general zoning subcategories to several areas throughout a city. • Item 3-Form Based Code LDR Special Called Meeting 4-12-17 "We're finding it's being extremely helpful/'Murphy said. "It functions the way they want to,but it's been redone into a form-based style." Jane Nutter Johnson, president of the Indian Beach/Sapphire Shores Association,hada positive reaction to her meeting last week with the Urban Design Studio. She said her neighborhood might be less complicated than others,because it's already largely built out,but she doesn't fear the area will be negatively affected by the changes. "I don't think the new code is going.to be that different for us,"Johnson said. As she works to accommodate a city wary of New Urbanist hallmarks, such as increased density and shallow building setbacks, is Murphy concerned about veering too far away from her planning principles? RURALII1111111111111111111111 TRANSECTI11lll llllll I 11Illiill I MaALzolES I URBAN ZONES _,,i .,...4 -,L 'I"- q irk', sii ., - . , ) , —,, , fikik,, t ,,-, ilk— - .,..... , c . ... _. ?„ ,... ..4z.,...* mm i , 6 ott ♦ Y �1 •' 1 `� At 4 S �a P °...71✓f �ti 1 M. i V-e.A11 ';.-z efr 4 ir , op ,..- 0.--L, Dtapjoi, a ,:, _ .4..z,:._..... ,_ ....,..,_____ , ,or,,,., ,Nam ,,,, :, •• ,, - ... .25 1 The form-based code divides the city's neighborhoods into "transects," with the goal of creating a natural transition from suburban to urban areas. Right now,the answer is no. She said the new code positions the city to take steps toward a better urban environment at its own pace. In other words, it maintains fundamental aspects of what residents like now while weaving in the fabric that will allow the city to evolve in the future. Item 3-Form Based Code LDR Special Called Meeting 4-12-17 "I'm very comfortable that we've got the heart of all that great urbanism," she said. Working with a detailed map of all the lots in the city, Murphy and Dobbs are continually refining their plan to create a more cohesive Sarasota — with natural transitions between neighborhoods with different characters. The code will never be perfect. Murphy said city staff should remain vigilant in reviewing the code once the document is officially adopted to ensure any problems that arise are addressed promptly. Still, Murphy hopes the community groundwork being laid now will lead to widespread buy-in when the code is finally ready for public hearings — even if that's not until 2018. "At the end of the day, I want people to say, 'Yeah, they listened, we all worked together, and it's a better product for it."' Murphy said. City Manager Recruitment Process Timeline (Updated 4-7-17): Task Deadline By Whom? 1. Develop position description (with input from residents) January 26 HR, CM 2. Develop a weighted matrix to review and rank candidates January 26 HR, CM (with input from residents) 3. Revise position description and weighted matrix based on February 9 HR, CM, Citizens input from citizens. 4. Approval by Commission of Position Description February 13 Commission 5. Develop ad/brochure—Publish March 7 HR, CM 6. Application deadline April 7 HR 7. Complete preliminary screening based on Matrix—Narrow April 14 HR, CM candidate pool 8. With help from citizens, develop list of questioris`.for written Week of HR, CM, Citizens questionnaire to candidates. ;:; :;:::; April:17 9. Complete secondary screening May 5 HR, CM • Written questionnaire • Telephone interview • Written Introductions prepared by candidates • Candidate disclosure statements • Internet and media search • 10. Thorough background,investigations/Reference checks::: ::'May 19 HR 11. Identify list of no more:than 5 finalists May 22 HR, CM 12. Set up one-on-one interviews with Commission/public Week of HR, CM, Citizens, forum/meet-and-greetwith public May 22 Commission 13. Commission selection—Special called meeting June 5 Commission 14. Contract negotiation-ICMA model CM agreement`` June 9 HR, CM 15. Contract approval by Commission.-Special called meeting June 12 Commission (before regular Commission, meeting). Hogencamp,Kevin From: William Gulliford <gulliford@usa.com> Sent: Tuesday, April 04, 2017 6:18 AM To: Brad Duttera Cc: Reeves, Mitch; Hogencamp,Kevin Subject: Re: Dune Restoration NORTH of 18th ST, Atlantic Beach Brad, I hate to be the bearer of bad news but it will not be extended past 17th. The original project was always destined to stop at 17th. Kevin Bodge, our coastal engineer, made a strong attempt on our behalf to have that added to the project. He was unsuccessful. Part of the problem I believe was that since it was never part of the original project, adding it could put FEMA reimbursement in jeopardy. I am sorry to have share the reality of the situation. If there is further information I can provide please contact me. Regards, Bill Gulliford William Gulliford Cell Phone: 904 334-3786 Office phone: 904 288-9677 Home Phone: 904 246-8389 Office Fax: 904 288-9678 Email: gulliford@usa.com Sent: Monday, April 03, 2017 at 3:34 PM From: "Brad Duttera" <bduttera@awcjax.com> To: mreeves@coab.us Cc: khogencamp@coab.us, gulliford@usa.com Subject: Dune Restoration NORTH of 18th ST, Atlantic Beach Dear Mayor Reeves, My email is strictly based on information released in the T-U last week RE: resumption of the beach renourishment. The article states that renourishment will NOT extend past 17th or 18th streets. My understanding was that when resumed,the Project would extend North through to Hannah Park. As an oceanfront home owner, I am quite concerned at what I hope is an oversight, is NOT correct. In just our area of ten homes there was probably 30,000 cubic yards of DUNE lost due to Matthew. I have images of" before and after"if they would be helpful. 1 Please advise me, as soon as possible,with the actual scope of the renourishment work and how far North the sand will be replaced,and how much can be expected. Thank You for your assistance. Brad Duttera 2211 Alicia Lane Atlantic Beach, FL 32233 (904) 993-5862 2 Harper, Carol From: Gulliford,William Sent Friday,April 07,2017 12:27 PM To: 'Scott Lewis' Cc: Harper,Carol Subject RE: Dune renoursement,Jax Beach Scott, I just received the following email form Kevin Bodge that I thought would be of interest. From: Kevin Bodge [mailto:kbodge@olsen-associates.com] Sent:Thursday,April 06,2017 6:43 PM To: Harper,Carol Cc: Fallin,Thomas Subject: Duval south dunes Carol, I know you and Cmsnr Gulliford are hearing from concerned residents at south end of Jax Beach where continued beach/dune restoration is not in the present plan—now anticipated to re-start around April 13, after dredge maintenance is done. As I discussed with Cmsnr Gulliford,dune losses from the storm along the southern 7500-ft(approx)of the County were much less than elsewhere along the project area—generally about 75% less in volume—owing to the fact that almost all of this southern beach length was renourished just prior to the storm--though there are yet a few spots where dune loss was notable. Much of the dune erosion here has since recovered owing to wind- blown accretion of sand,particularly against the reeds that the Corps' Contractor left against the duneface. Dune vegetation is re-emerging through the recovered sand. The dredge cannot do spot repairs or place the small amounts of sand required to effect dune repair here. Practically,the dredge has to place at least 1700+cubic yards of sand per every 100-ft of shoreline length, because of the volume of sand that the dredge produces. So, the dredge would have to place a total of about 130,000 cubic yards of sand to restore the approximate 6,000 cubic yards of net remaining dune erosion along this 7500-ft shoreline. (That equates to about$2.2M of sand & work to place$100K of dune fill sand,more or less.) The scheduled upcoming repairs in central Jax Beach will place an additional 92,000 cubic yards of sand to the beach--in addition to 66,000 cubic yards of dune repair. That extra 92,000 cy of sand will ultimately add to the overall beach system, beyond the scope of the original renourishment,and ultimately drift southward. We will examine the south end of the beach to identify areas of most severe remaining dune erosion and prepare recommendations as to how these areas might be addressed,if/as feasible. This might, for example, be through supplemental sand fill or sand-fencing, and/or sea oat installation. Actions have to be physically feasible and cost-effective, and implementable through the complicated mechanisms of federal projects,contracts,and permit restrictions. The City's dune re-vegetation contract includes allowances for planting throughout the project limits,and Public Works presently anticipates that plant installation will span all the way along the project limits,including the south end of Jacksonville Beach and northward toward Hanna Park. As you are aware,that work is anticipated to begin in late May,after the nurseries produce the first phase of plants for installation. Overall,the post-storm repairs enabled by the City and Corps have been unprecedented in scope and timeliness. Kevin. 1 . City of Atlantic Beach Budget Calendar Fiscal Year 2017-2018 Date Required Action Responsibility April Strategic Planning and/or Pre-Budget Preparation Meetings. Department Heads Director of Finance The City Manager will meet with all Commissioners and the Director City Manager of Finance will meet with all Department Heads. City Commission April 10 to Update Ten Year CIP Requirements To Finance Director Department Heads May 5 March 24 to Preparation of budget requests on-line, current year budget review. Department Heads April 24 April 24 to Review of on-line requests, CIP Requests,Meetings with Department Department Heads May 22 Heads for explanations and justifications. Program pages are also to Director of Finance be included in discussions. City Manager May 22 to Preparation of Proposed Budget, follow-up meetings with City Department Heads June 30 Manager and Finance Director Director of Finance City Manager June 23 to State Revenue Sharing Estimates provided Department of July 31 Revenue July 1 Receive Certification of Taxable Value Property Appraiser July 10 or City Manager to propose millage rate on DR-420 and schedule a City Manager July 24 public hearing to consider the Tentative Millage and Tentative Budget. This information is to be presented to the property appraiser within 35 days from the date of certification. July 25 Proposed Budget submitted to the City Commission City Manager Director of Finance August 21 Tax notifications to be mailed within 55 days of Certification, (TRIM Property Appraiser notice of proposed property taxes). August 2 and The City Commission holds workshops to review the Proposed Department Heads August 9 Budget. The meetings are held at 5:00pm and last about three hours Director of Finance each. City Manager Proposed August 2nd and August 9th—Both are on a Wednesday City Commission August 19 to Advertise in newspaper for public hearing on adoption of Tentative Director of Finance September 2 Budget and Proposed Millage (The property appraiser also notified City Clerk property owners). Property Appraiser September 11 Hold Public Hearing to adopt the Tentative Budget and Millage(F.S. City Commission 200.065). September 23 Publish TRIM notice in public newspaper Director of Finance September 25 Hold Final Hearing to approve Budget and Millage Rate City Commission