Loading...
09-12-91 v CITY OF ATLANTIC BEACH CITY COMMISSION WORKSHOP, SEPTEMBER 12 , 1991 , 7 : 30 P.M. AGENDA Call to Order 1 . Discussion and related action regarding the proposed budget for Fiscal Year 1991/92 Adjournment MINUTES OF THE BUDGET WORKSHOP MEETING OF THE ATLANTIC BEACH CITY COMMISSION HELD IN THE CONFERENCE ROOM, CITY HALL, 800 SEMINOLE ROAD, AT 7:30 PM ON THURSDAY, SEPTEMBER 12, 1991 The meeting was called to order by Mayor Gulliford. Present, in addition to the Mayor, were Commissioners Cook, Edwards, Tucker, and Weldon. Also present were City Manager Leinbach, Finance Director Royal, City Attorney Jensen, and City Clerk King. Department heads present included Parks & Recreation Director Blanchard, Building Official Ford, Public Works Director Kosoy, Buccaneer Division Chief McNally, Police Chief Thompson, Atlantic Beach Division Chief Townsend, and Community Development Director Worley. Discussion commenced with the sewer and water funds and the City Manager explained some changes had been made since the previous meeting, adding about $250,000 of improvements. Bob Kosoy provided figures illustrating an estimated cost of $1,544 per week, or an annual cost of $80,325, to treat Buccaneer sludge at the Atlantic Beach and haul to the landfill. He also provided estimated costs of contracting this work out to a private vendor and estimates of the cost of installing sludge handling facilities at Buccaneer. After brief discussion, Commissioner Tucker moved to accept the recommendation of the staff and continue to treat the Buccaneer sludge at the Atlantic Beach plant and reimburse the Atlantic Beach account accordingly for the costs involved. The motion was seconded by Commissioner Weldon and was unanimously approved. Sanitation: The City Manager presented a proposed rate schedule for commercial dumpsters which would realize an additional $50,000 in revenue. While the rates had been increased, he pointed out Atlantic Beach would still have the lowest commercial rates on the area. The additional revenue would be used for equipment replacement. Commissioner Weldon moved to implement the increased rates for commercial dumpsters as recommended by the City Manager. In further discussion, Commissioner Cook asked for additional information to substantiate the charges for commercial dumpsters and Mr. Kosoy agreed to provide this information. The question was called and the motion carried unanimously. $25,000, the Sanitation Department's pro rata share of the storage shed, was deleted. Buccaneer Water: The $24,000 budgeted for outfall line repair at Sherman Point was transferred from Buccaneer Water to Buccaneer Sewer. Bob Kosoy pointed out a similar amount should be charged to Atlantic Beach sewer. Buccaneer Sewer: $3,000 which had been budgeted for the painting booth was deleted, and $80,000 was added to operating costs to cover sludge handling at the Atlantic Beach facility. Oak Harbor Water: Harry McNally reported no major expenses were expected in the Oak Harbor water system. No changes were made. Oak Harbor Sewer: Harry McNally reported a temporary loan would be needed from Buccaneer Sewer to finance the major rehabilitation in the amount of $535,000. Stormwater: Bob Kosoy reported CH2M Hill had indicated the city would need a budget of $87,000 to meet EPA requirements for stormwater permitting, $30,000 to refine billing data to make billing more accurate, and $92,000 for aerial mapping which would be used primarily in the development of a stormwater master plan. After a full discussion of the matter it was the consensus the priorities would have to be amended in order to balance the budget and if revenues change the budget could be revised. Commissioner Weldon moved that the mandated amount of $87,000 be inserted and that the other items under the stormwater utility budget be reduced if necessary. The motion was seconded by Commissioner Edwards and was unanimously approved. Police Trust: Chief Thompson reported revenues in this fund were derived from the sale of property confiscated because of felony drug crimes, fines, etc. This money could be used for drug grant matching funds, overtime and training and criminal investigations. Personnel: Chief Thompson said he had been able to eliminate one communications position and proposed to establish an Emergency Communications/Duty Officer position. This individual would be a certified police officer who could help in the communications area when needed and would also be able to relieve some of the burden of the other police officers. He recommended this individual be paid at a lower rate than a police officer. Chief Thompson reported on the responsibilities assumed by Lt. Campbell. He said Lt. Campbell had brought much experience and expertise to the Department and would represent the city this year in collective bargaining. He requested that Lt. Campbell be promoted to the rank of Captain to recognize his contributions to the department. Discussion ensued regarding the proposed salary level for the Captain classification and Chief Thompson explained this position would not receive overtime and he felt the salary of this position needed to be above the highest paid lieutenant. He also felt the elimination of attorneys' fees in connection with collective bargaining would represent a considerable savings to the city. After further discussion Commissioner Weldon moved to reclassify Lt. Campbell's position to Captain and authorize a $5,000 increase in salary with the further stipulation that it be taken up at mid fiscal year for further consideration. The motion was seconded by Commissioner Cook. The City Manager asked that he be allowed to place the Captain on the pay plan at the level closest to that which had just been approved. The question was called and the motion carried unanimously. Commissioner Tucker moved to accept Chief Thompson's recommendation and approve the new position of Emergency Communications Officer/Duty Officer in lieu of the budgeted communications officer. The motion was seconded by Commissioner Weldon and was unanimously approved. Bob Kosoy noted he had requested an additional employee for the Public Works department to work primarily as an inspector, and cited in particular such projects as the outfall line repair, Main Street widening, water plants 1 and 2, Buccaneer surge tank, Seminole Road drainage project, Cypress Creek project, stormwater utility, parking at 18th and 19th Streets, Mayport Road bore and jack, Section H, Fleet Landing culvert problem, etc. He felt it would be helpful to have a city employee to undertake inspection services on projects such as these and noted that each the last three years the city had paid between $69,759 and $123,670 to engineering firms for inspection services. If this position was approved at the suggested salary of $30,000, the city could have increased inspections at an estimated savings of $40,000 to $50,000. When no inspections could be carried out because of bad weather or few construction projects, this employee could be used to assist the Public Works Director or the Division Chiefs as needed. In a lengthy discussion, Commissioner Tucker moved to approve the position of Inspector/Assistant Public Works Director, with the position to be funded by a reduction by a like amount in Professional Services. The motion was seconded by Commissioner Weldon and carried 3 - 2 on a roll-call vote with Commissioners Cook and Edwards voting nay. Commissioner Weldon pointed out certain employees were being paid salaries in excess of that being paid to the City Manager. Discussion ensued regarding the monetary value of other benefits received by the City Manager and Harry Royal was asked to provide the City Commission with an valuation of these benefits to help them in their decisions regarding the City Manager's salary. Discussion then ensued regarding whether any cost of living increase should be granted to employees. In brief discussion the City Manager pointed city employees were eligible for a merit raise of 5% on the anniversary of their employment with the city provided they receive a satisfactory performance evaluation. Commissioner Weldon moved to authorize no increases beyond the 5X merit raise for city employees unless there was a great change during the course of the next fiscal year. The motion was seconded by Commissioner Cook. The City Manager pointed out a number of employees with long tenure with the city had reached the top level of their job classification and would not be eligible for a step increase. The pay plan provided that if the city wished, a bonus of up to 5% could be granted to those employees and this 5% increase had been provided for in the budget. It was generally agreed those employees who were at the top of their classification should receive the 5% bonus provided for in the pay plan. The question was called and the motion carried unanimously. There being no further discussion, the Mayor declared the meeting adjourned at 9:55 PM. Maureen King, CiTy Cl k •, CITY OF r fifteetoWe Eeeld - wuda 1200 SANDPIPER LANE ATLANTIC BEACH,FLORIDA 32233-4381 TELEPHONE(904)247-5834 .0R 41 FAX(904)247-5843 September 10, 1991 MEMORANDUM TO: Kim D. Leinbach/City Manager FROM: Robert S. Kosoy/Director of Public Works'+, `l/la/q/ RE: AB WATER & SEWER FY 1991-92 In response to your message of September 5, 1991 on the referenced subject, we would suggest reducing the loan from Atlantic Beach Sewer to Water from $1. 2 million to approximately $900, 000. 00. This $300, 000. 00 reduction will cover those items in Fund 41, Object Code 3400, page 110A. The items reinstated in the budget were: 1 ) Wedgewire Tiles $110, 000. 00 * 2) Wetwell Rehab $120, 000. 00 * 3) Replace Stairs and Walkway at #6 Digester $70, 000. 00 * *includes 10% contingency $300, 000. 00 The remaining $300, 000. 00 to be loaned to AB Water can be borrowed from Buccaneer Sewer Unrestricted Cash Fund. As mentioned by Harry E. McNally at the Commission Meeting, no accounting is currently made for the cost saved by the Buccaneer Wastewater Treatment Plant by treating their sludge at the Atlantic Beach Facility. We propose that a cost be assigned to this service and charged to the Buccaneer WWTP account and transferred directly to the Atlantic Beach WWTP account. If you need any further information, please call me. RSK/tb cc: Tim Townsend/Utility Plant Division Director Harry E. McNally/Utility Plant Division Director Harry E. Royal/Finance Director File