Loading...
WPC - Additive Alternate 1City of Atlantic Beach ADDITIVE ALTERNATE 1 Contractor: WPC Industrial Contractors, LLC Owner: City of Atlantic Beach Date: 3/1/2011 Attention:Phillip Starr City Bid No.: 1011 -01 Project:WWTP #1 Improvements for TMDL Compliance You are hereby requested to comply with the following changes in the Contract Documents: 1.Revised Scope of Work DECREASE INCREASE IN IN ITEM UNIT CONTRACT CONTRACT DESCRIPTION QTY UNIT PRICE $ PRICE $PRICE $ Additional Blower for Additive Sludge Treatment perAlternateNoplansandspecifications 1 LS 129,000 129,000 1 TOTAL 129,000 129,000 NET CHANGE IN CONTRACT PRICE 129,000 The above Revised Scope of Work will be added to the existing Purchase Order for the project. 30 _ days will be added to the Contract Completion Date. Accepted By:Date:leP Contracto Approved By:Date: 3///itOwner .. 11111 Approved By:22 Date: 3.- - If Engi i - - WWTP# Improvements for TMDL Compliance City of Atlantic Beach, FL Bid No. 1011 -01 CHANGE ORDER NUMBER 1 Contractor: WPC Industrial Contractors, LLC Owner. City of Atlantic Beach 11651 Philips HW 800 Seminole Road Jacksonville, FL 32256 Atlantic Beach, FL 904) 268-0099 904) 247-5800 Fax (904) 268 -2922 Engineer: J. Collins Engineering Associates, LLC 11516 -3 San Jose Blvd. Jacksonville, Florida 32223 904) 262-4121 904) 262 -4122 FAX Date:February 18, 2011 rev 2 21 11 INCREASE OR DECREASE IN DESCRIPTION OF CHANGE(S) Complete Scope of CONTRACT ITEM Work is attached as Exhibit A Total Cost/Price PRICE 1 Cost to provide Motor Control Center installation & wiring 29,440.00 29,440.00 for New 4th Blower for Sludge Improvements CONTINGENCY AMOUNT 238,140.00 CONTINGENCY AMOUNT REMAINING 208,700.00 BASE BID PRICE 4,762,800.00 CONTINGENCY AMOUNT 238,140.00 TOTAL ORIGINAL BID PRICE 5,000,940.00 ADDITIVE ALTERNATE #1 129,000.00 ADDITIVE ALTERNATE #2 245,000.00 TOTAL CONTRACT AMOUNT 5,374,940.00 NET INCREASE RESULTING FROM THIS CHANGE ORDER 0.00 CURRENT CONTRACT PRICE INCLUDING THIS CHANGE ORDER 5,374,940.00 This document shall become an amendment to the contract and all provisions of the contract will apply hereto. 1 Accepted by:Date:t Contr4 2 I Accepted by:Date:6 i(Engine: Acc- • - • • • 4111110'Date:j////)Owne