Agenda Item 6A- Resolution 18-01RESOLUTION NO. 18-01 A RESOLUTION OF THE CITY OF ATLANTIC BEACH, FLORIDA, A WARDING BID #1718-01 FOR WATER SERVICE REPLACEMENTS ON PLAZA DR., CLIPPERSHIP LN., NAUTICAL BLVD. N. AND BELVEDERE STREET. WHEREAS, on December 13, 2017 five bids were received and opened for City Bid #1718-01 Water Service Replacements on Plaza Dr., Clippership Ln., Nautical Blvd. N. and Belvedere Street; and WHEREAS, the total bid prices (including 10% contingency) received ranged from $208,952.70 to $524,381.00; and WHEREAS, Baldwin's Quality Plumbing submitted all required documents in their bid submittal; and WHEREAS, the project consists of replacing 66 aging and failing water service lines with new, more reliable PVC service lines to reduce reactive maintenance costs attributed to leaking service connections in this area; and WHEREAS, the Contractor will be given sixty (60) days to complete the project; WHEREAS, the project will be fully funded in the FY17-18 budget under Project No. PU1803; Account 400-5504-533-63-00. NOW THEREFORE, be it resolved by the City Commission of the City of Atlantic Beach as follows: SECTION 1. The City Commission hereby awards Bid #1718-01 to Baldwin's Quality Plumbing in the revised amount of $200,000.00 ($8,952.70 reduction in contingency) to replace the 66 water services on Plaza Dr., Clippership Ln., Nautical Blvd. N. and Belvedere St. in accordance with the plans and bid specifications; SECTION 2. The City Commission hereby authorizes the City Manager to execute the Contract with Baldwin Quality Plumbing; SECTION 3. This Resolution shall take effect immediately upon its passage and adoption. PASSED AND ADOPTED by the City of Atlantic Beach, this 8th day of January, 2018. Ellen Glasser, Mayor Attest: Donna L. Bartle, City Clerk Approved as to form and correctness: Brenna M. Durden, City Attorney Agenda Item 6A January 8, 2018 AGENDA ITEM: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT Bid No . 1718-01 for Water Service Replacements on Plaza Dr ., Clippership Ln., Nautical Blvd. N. and Belvedere St. SUBMITTED BY: Kayle W. Moore, P.E. Public Utilities Director DATE: December 21, 2017 BACKGROUND: The purpose of this work is to replace aging and failing water service lines with new, more reliable PVC service lines to reduce reactive maintenance costs attributed to leaking service connections in this area. The project includes replacement of 66 water services in portions of the Seas pray Subdivision. Five bids were received on December 13, 2017 as shown in the table below. The low bid received was submitted by Baldwin's Quality Plumbing in the amount of $208,952.70, including 10% contingency. Contractor Total Base Bid Contingency Total Bid BUDGET: Baldwin's G&H Grimes Hager North point Quality Underground Utilities Construction Services Plumbing $189,957 .00 $476J10.00 $294A26.oo $307A50.77 $217J40.00 $18,995.70 $47,671 .00 $29A42.60 $30J45.08 $21J74.00 $208,952.70 $524,381.00 $323,838.60 $338,195.85 $239,514.00 The FY 2017-18 budget includes $200,000 for these water service replacements under Project No . PU1803; Account No. 400-5504-533.63-00. RECOMMENDATION: ATTACHED: Award Bid No. 1718-01 to Baldwin's Quality Plumbing for the total budgeted amount of $200,000.00 by reducing the Contingency amount by $8,952.70 for a revised Contingency of $10,043.00 and revised Total Bid price of $200,000.00. Bid Analysis Bid Tabulation REVIEWED BY CITY MANAGER: --~--P"=---"')1---'4=--"---'~--------- Agenda Item 6A January 8, 2018 1 2/13/2017 Bid Item No . 1 2 3 4 5 6 7 8 Bid 1718 -01 Water Servi ce Re pl a cem ent s at Pla za Dr., Clip pershi p Ln., Na utical Blv d . N., Be lve de re St . Baldwin 's Qualtity Plumbing G&H Underground Gr imes Utilities Hager Construction Northpointe Services Extenaea DESCRIPT ION QTY UNIT UNIT COST EXTENDED COST UNIT COST EXT ENDED COST Unit Cost Cost UNIT COST EXT ENDED COST UNIT COST EXT ENDED COST Mobi lization/Demobi lizat ion 1 EA $17,268.00 $17,268.00 $43,000.0( $43,000.0( $13,400.0C $13,400.0( $25,184.00 $25,184.00 $4,000.0( $4,000.00 Construct/directional drill/jetting new I" Poly long water services to existing water meters. 35 EA $500 .00 $17,500 .00 $4,200.0( $147,000.00 $3,9 50 .0( $138,250.0( $2,268.00 $79,380 .00 $1,650.0( $57,750 .00 Co nstruct new I " Po ly short water serv ices to existing meters . 31 EA $200.00 $6,200 .0( $3,500.0( $108,500.00 $2,3 50.0( $72,850.0( $2,150.0C $66,650.00 $240.0( $7,440.0C services at the tap. Remove old cu rb stops and reconnect new services. 66 EA $1,600 .00 $105,600 .00 $1,800.0( $11 8,800.0C $330 .0( $21,7 80.00 $700.0( $46,200.00 $1,560.00 $1 0 2,960.0( Sod removal and replacement. 4000 SF $2.SC $10,000.0( $9.00 $36,000.0C $2.57 $10,280.00 $5.6C $22,400 .00 $3 .00 $1 2,000.0( Concrete dr iveways . 5" thick at 4000 PS I (meters located in the dr iveway only). 1 25 SY $15 3 .00 $19,125 .00 $92 .00 $11 ,500.00 $56.00 $7,000.00 $140.Dl $17,501 .25 $130.00 $1 6,250.0( Cut asphalt over water mai n in roadway and re -establish base and sub-base. 200 EA $4.0( $800.0( $15.00 $3,000.0( $17.71 $3,542.0C $112.5( $22,500.00 $24.0C $4,800.0( Kep ac e au meter oox es Wi tn I I "x18"x l2" Glassmaster composite meter boxes and lids with one touch read ho le. Lids shal l be marked "WATER" NOT "JEA" 66 SF $204.00 $13,464.00 $135 .0( $8,9 10.00 $414.00 $27,3 24 .00 $41 8.72 $27,635.52 $190.0( $1 2,540.0( Tot a l $189,957.00 $476,710.00 $294,426.00 $307,450.77 $217,740.0( 10 % Contingency $18,995 .70 $47,671.00 $29,442.6( $30,74 5.08 $21,774.0( Tot a l + 10% Co ntin ge ncy $208,952.70 $524,381.00 $323,868.60 $338,195 .85 $239,514.0( While verifying bids, a mathematical error was found with Northpointe Services on Bid Item #2. The extended cost written was $58,450 but is actually $57,750, for a total difference of $770 less than the written amount submitted. Agenda Item 6A January 8, 2018 City of Atlantic Beach ·I Water Replacements on Plaza Dr., Clippership Ln., Nautical Blvd. N., and Belvedere. St. Wednesday, December 13,2017 BID# 1718-01 3:00PM Baldwin's Quality Plumbing G & H Underground Const. Grimes Utilities, Inc. Hager Construction Co. North pointe Services Required Documents Submission in Triplicate X X X X X Document Requirements Checklist X X X X X W-9 Form X X X X X Bid Form X X X X X Bid Bond -5% X X X X X(NOT CERTIFIED) Drug Free Workplace Certification X X X X X Public Entity Crimes Statement X X X X X Public Records Provision Form X X X X X Trench Safety Affidavit X X X X X l New Vendor Information Form X X X X X Proof of Experience - 5 years of Underground Utility X X X X NO License-General Contractor OR Underground Utility X X X X X Financials -Last 2 Years X NO X X X (1 YEAR ONLY) Insurance X X X X X References - 5 X X X X NO (1 REFERENCE) Documentation of Receipt of any Addenda (One, 12/11/17) X X X X X Total Cost for Project+ 10% Contingency $208,952.70 $524,381.00 $323,868.60 $338,195.85 $240,284.00 While verifying bids, a mathematical error was found on line 2 from North pointe Services , changing the total bid amount to $239 ,514. Award of Bid based on Department Ana lysis and City Manager and /or Commissio n Approva l Agenda Item 6A January 8, 2018