Loading...
Public Works Budget PUBLIC WORKS BUDGET FY10 -11 PW ADMIN STREETS FLEET MAINTENANCE PARKS AND BEAUTIFICATION SANITATION STORMWATER General Fund Issues Not funded: • Pedestrian paths or new sidewalks ", Replacement emergency generator for PW • Russell Park ball field lighting upgrade • Possible Energy Grant • City Hall parking lot lighting upgrade May include with Police Building Project Skate Park Security Camera System - $8,000 • Pave Stewart Street - $25,000 Parks Master Plan, including River Branch Preserve - $25,000 General Fund Issues (Continued) Not funded: _ Replacement Christmas decorations for Atlantic Blvd. and Mayport Rd. - $12,500 Russell Park drainage improvements - $10,000 Rose Park upgrades - $161,750 (evaluation requested by Comm. Daugherty in Strategic Planning) Kayak launch; north end of Dutton Island Preserve - $32,000 (evaluation requested by Comm. Daugherty) Water fountain for Russell Park - $5,000 (evaluation requested by Comm. Fletcher) Tree Fund subsidy - $6,000 (Possible commercial Adopt Tree program for Mayport Road) 1 General Fund Issues (Continued) Sidewalk / concrete and stormwater point repair funds continue at reduced levels. Beach Access and Medians Beautification matching funds reduced — no funds for new adoptions. Town Center Christmas Decorations — Town Center Agency in second year of proposed three year upgrade — adding more trees, surfboards and packages new— lifeguard a. oo for AB, imbursed by Town ch Cen C Agencyntractr works . a � ,r /.s f rus * - ' sufrka+us_ # YDht: 114W 4W tlt7{t5.y .. - . .d5 b �+ : •t bo, o laq IXLt(?i _...i' - - T ?dam S TREET YNk ir ?i Pu14 Parks Projects • Replace / refurbish Howell Park Bridges Refurbish one bridge (three complete, three remaining) • Donner Park Improvements (CDBG Funded) Court and Security Lighting Sod Baseball and portion of Soccer Fields — Parking Addition • Veteran's Memorial Park Flagpole funded by grants from VFW and Rotary, add'I grant from COJ being processed/ • Tideviews Canoe / Kayak Launch Bed Tax and FIND Grant Funded 2 Stormwater Capital Improvements Royal Palms Drainage Rehabilitation Construction began August 2009, scheduled completion October 2010 (8 weeks added by change order). Additional CO being processed. Approved budget $3,197,824 — includes replacing or rehabbing CM pipe, removing underground gas tanks, and resurfacing —2 /3rds of subdivision. $86,000 in Gas Tax funding needed to complete planned resurfacing. Stormwater FY 10/11 Plan Stormwater Master Plan Update — (deferred from FY 07/08) - $100,000 Purchase new Menzi Muck (deferred from FY08 /09) - $245,000 Replace undersized drain line on East Coast Drive (Atlantic to Ahern) - $50,000 Replace corrugated metal pipe on Saturiba Road (Seminole to Sea Oats) - $42,000 Undesignated Point Repair budget - $25,000 Not included - Headwall improvements for Robert St ditch - $30,000 Stormwater CIP Modifications • Stormwater Master Plan Update — to focus on Wet Ditches • Begonia St (W. 6th to W. 9th) - deferred to FY 12/14. • Main Street (Levy to Stewart) — deferred to FY 13/15. • Magnolia / Poinsettia Street Upgrades — deferred to FY 16/17. • These projects will be re- evaluated as part of Stormwater Master Plan Update. Additional area of study may include refining on -site storage requirement for new development. 3 Stormwater Ditch Maintenance Hatched streams are Eee4 FEMA Floodways. . � No. �� ...ski PIONEER • Ditches downstream of U� Atlantic Beach limits w H are not maintained by COJ - their policy is, if ���__ f( 4 no runoff from city '�r ' l'` • Iw owned property, private r owner is responsible i • x '10 fp I - 1 for maintaining Flow" a path. � [ u • v! ditch is DOT's - maintained , e maintained b AB to a r salt marsh under "L DU L annual contract. ' . ti E �F PI 71 i t V Florida Statute - 298.66 Obstruction of drainage canals, etc., prohibited; damages; penalties. -No person may willfully, or otherwise, obstruct any canal, drain, ditch or watercourse or damage or destroy any drainage works constructed in any district. (1) Any person who shall willfully obstruct any canal, drain, ditch or _ watercourse or shall damage or destroy any drainage works constructed by any district, shall be liable to any person injured thereby for the full amount of the injury occasioned to any land or crops or other property by reason of such misconduct, and shall be liable to the district constructing the said work for double the cost of removing such obstruction or repairing such damage. (2) Whoever shall willfully or otherwise obstruct any canal, drain, ditch, or watercourse, or impede or obstruct the flow of water therein, or shall damage or destroy any drainage works constructed by any district shall be guilty of a felony of the third degree, punishable as provided in s. 775.082, s. 775 083, or s. 775 084 City of Jacksonville Ordinance Code Sec. 320.102. - Maintenance and use of buildings and property. (d) Obstructing flow of water. It shall be unlawful for any owner, custodian, agent, lessee, trustee or occupant of any real property within the City to construct, allow, or permit any obstruction to the flow of water, including but not limited to logs, land fills, dams, partial dams, leaves, trash, building materials, and garbage, to remain in any natural or artificial waterway or drainageway or their adjacent floodplains on such property for more than ten days after having received actual or constructive notice of the existence of such obstruction upon such property by certified mail or personal service from or at the direction of the Director of Public Works. The provisions of this Section shall not apply to the filling or excavation of land located in or bordering on navigable waters of the State of Florida if such activities are regulated by F.S. Ch. 253, or other state or local laws relating to the filling or excavating of such lands. 4 Storm Water Utility 5 3 t 0 r r ry 0 AI' � ,O a � 0 r 0 - � yry Al' r ' 0 4 4 Q Q F 4 4 4 Q F 4 4 F IMPersonal Services ra�Operating Ea penses MCapital Outlay �Oebt Service =Transfers +Revenue Resurfacing Program * FY 10/11 - $203,000 budget: $86,000 targeted to complete Royal Palms Project Resurfacing • Overall Condition Index (OCI) — 71 (Very Good) • Range —3 segments — poor; 124 — excellent Total segments — 293 (public only) • Pavement inspections for 2010 complete. Excellent = 85.01 to 100 Poor = 25.0110 40 Very Good = 70.01 to 85 Very Poor = 10.0110 25 Good = 55.01 to 70 Failed = 0 to 10 Fair = 40.01 to 55 City Street Resurfacing 1 ¢ _ History Since 17 - \ I I � � t 2005 Annual Resurfacing a� Program = Green _�`� • ' " Royal Palms = Light Blue (done) (.t —ask �^— Purple (planned) I ' ) ./. \," •ate i G.-.•_ 1: / -r Orange (pending) L_: i r Blue Other Projects = / tC.; New Development = 6ilelt�" Red 5 Auk Gas Tax Fund 800 700 800 500 �� 400 • 300 200 , 0 100, 0 O � ^ ^' �ry ��` � � ^� � ry ry Sir o ry o yry It It o ry o 1y o ry o ry o 0 0 1y o 1 , AV VV ��F ° ������F < ImOperating Expenses =Capital Outlay =Transfers -4- Revenues Sanitation ■ Estimated Revenues - $1.8M • Estimated cost of Pick -up and Haul Contract - $1.25M ' Expense - $50,000 to COJ for Commercial Tippage ($44,000 current FY) Contractor's current Residential Rate is $15.13 /month. This is below the initial contract rate ($15.25) due to the quarterly fuel rate adjustment. Sanitation Fund „ 3,000 2,500 2,000 l - -- 1,500 1,000 500 0 0 O °j a. �� <I' �ry Nb �h . �� �O �� 45s y1t ,0 1r 0 11 0 y 1y 0 1y 0 110 .1° q° 1y 0 � '1 ° 1t 0 aPersonal Services operating Expenses ■Capaal Outlay =Transfers - .Revenues 6 -- i . , „, a t x 4r —imrs.. a. , ,...,. . i r i o� - I u '4 ram ,.r'- -�-'- _ `� t . VI n _, . . x ■ f s S� ,, t' } 4% '' Y, Y i !s, .. f -- 4 • _ ” R L pt \ 4 a le �" r } L 1 , ..- - " d° 7