Loading...
313 THRU 323 AHERN ST - SOIL DENSITY REPORT I7 -o27) - 7g - PCS 12 a21ir 8936 Western Way.Suite 12 �,11\/1/ E3k n�E R �. - - �g k - 3 23 Ah-E ISN s1'. Jacksonville.FL 32256 Meskel &Associates Engineering Office:(904)519-6990 l(904) Geotechnical r r ►Testing meskeengineering.com Report of In-Place Soil Density(Asphalt or Soil)Tests or Coring for Thickness(Circle One) Project Client: Page of Report#: Reported to: Location by: Location: Project#: Material: Course: Gauge#: Date Tested: Spec.Requirements: Method: ASTM D6938 Test Soil/Base %of Pass/ Test Location Elev./ /Asphalt Moismt�e ProcU°r Max Fail/ No. Depth Thickness Densty Density Retest {(gg • P=Test Meets Specification Requirements F=Test Fails to Meet Specification Requirements R=Retest Proctor Description Maximum Dry Optimum Moisture No. Density Content To Be Completed in Field Employee Name _ Standby Approval Time Start/Stop Travel Standby job Superintendent Printed Name Superintendent Signature Office Ilse white copy-office use yellow copy-personal use pink-client use