Loading...
Ahern Townhomes ZRC 05.14.2018 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 ZONING REVIEW COMMENTS Date: 5/14/2018 Permit #: RES17-0264, 266, 267, 268, 269, 270, 271, 273, 274, 275, 276, 288 Site Address: 301 AHERN ST Review Status: RE#: 169737 0010 Applicant: URBAN PARTNERS CONSTRUCTION Property Owner: AHERN TH PROJECT LLC Email: TH@URBANPARTNERSGROUP.COM Email: rjohnston.mec@gmail.com Phone: 9042702225 9045917929 Phone: 9042195003 THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS. Revisions may not be submitted until ALL departments have completed their respective reviews. Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a few correction items will not be accepted. Correction Comments: 1. Height: Section 24-17 requires height to be measured from grade to the highest point of a building’s roof structure or parapet and any attachments thereto, exclusive of chimneys. Please show the overall height from grade on plans. Note that the height cannot exceed 35 feet. Update: Overall height is shown to be 34 feet 11 inches. However, it is not clear if this is from grade or FFE. Drawings suggest this to be measured to the FFE. Page A101 calls for a 12 foot FFE in the building footprint while a note in the upper right corner says 11 feet. These conflict with each other and also from the engineering plans (page C4.0) that show a different FFE for each building. Update 2: Plans are now consistent. However, there is still an issue with the height. The highest established grade on the property (point of measurement) as seen on the survey is 10.8 feet (along north property line) and the garage floor of the eastern most building is 11.17. This would make that building about 0.4 feet too tall. Zoning Resubmittal Notes: All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of completely encircling the change with “clouding”. The revision shall also be identified as to the sequence of revision by indicating a triangle with the revision sequence number within it and located adjacent to the cloud. The revision date and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with revisions shall be inserted into each set of drawings. The original sheets must be clearly marked “VOID” but are to be left within the set of drawings. Complete new sets of drawings will not be accepted. ADDITIONAL ITEMS MAY BE REQUIRED DEPENDING UPON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.