ABCC CO Close Out - 7Dan,
Thank You. Yes sir I spoke with Doug Layton last week who stated him and Jeremy were good to sign off for CO of the building and that I just had to get with Donna on her end. I also
spoke with Donna about this and scheduled the cross connection inspection she needs in order to sign off the CO for the building. This inspection is scheduled for tomorrow @ 2:00pm.
Once again I am just trying to achieve a full CO for the Club House Buildings & Pool. I know there is still items the other departments lack before they will approve the completion
of the development. Doug Maier is the one who will be completing all of those items. I looked at the site plans that I have and didn’t see anything about that buffer however I will
mention it to Doug.
Thanks
Danny Rodrigues
Project Manager
RPC General Contractors, Inc.
248 Levy Road
Atlantic Beach, FL 32233
(904) 241-4416 (904) 241-4427 fax
danny@rpcgc.com
www.rpcgc.com
This e-mail is intended for the addressee shown. It contains information that is confidential and protected from disclosure. Any review, dissemination or use of this transmission or
its contents by persons or unauthorized employees of the intended organizations is strictly prohibited.
-----Original Message-----
From: Arlington, Daniel [mailto:darlington@coab.us]
Sent: Monday, February 09, 2015 12:58 PM
To: Danny Rodrigues
Cc: Hubsch, Jeremy
Subject: RE: ABCC CO Close Out
Danny,
I have approved all construction with the following comment.
Construction of Clubhouse, Pool Restroom Building, and Tennis Pro Building complete and approved by Building Dept. and Fire Marshal.
Hold C.O. for Zoning, Public Utilities, and Public Works approvals.
The buffer to the North, that we discussed, is required. There may be other issues that I am not aware of. I assume that you are in discussions with Zoning, Public Works, and Public
Utilities.
Dan Arlington
-----Original Message-----
From: Danny Rodrigues [mailto:Danny@rpcgc.com]
Sent: Monday, February 09, 2015 8:56 AM
To: Arlington, Daniel
Cc: Jones, Mike; Hubsch, Jeremy
Subject: RE: ABCC CO Close Out
Dan I am going out this this am to review.
Will get back to you right away.
Danny Rodrigues
Project Manager
RPC General Contractors, Inc.
248 Levy Road
Atlantic Beach, FL 32233
(904) 241-4416 (904) 241-4427 fax
danny@rpcgc.com
www.rpcgc.com
This e-mail is intended for the addressee shown. It contains information that is confidential and protected from disclosure. Any review, dissemination or use of this transmission or
its contents by persons or unauthorized employees of the intended organizations is strictly prohibited.
-----Original Message-----
From: Arlington, Daniel [mailto:darlington@coab.us]
Sent: Saturday, February 07, 2015 10:08 PM
To: Danny Rodrigues
Cc: Jones, Mike; Hubsch, Jeremy
Subject: Re: ABCC CO Close Out
Remember all of those spaces greater than four inches in, around, and under the pool barrier. They are still there and cannot be approved.
Dan Arlington
Sent from my iPhone
On Feb 6, 2015, at 5:27 PM, "Danny Rodrigues" <Danny@rpcgc.com<mailto:Danny@rpcgc.com>> wrote:
Dan,
I hear everything went well with the Inspection today. We have scheduled our final CO inspection for Monday.
Thanks
Danny Rodrigues
Project Manager
RPC General Contractors, Inc.
248 Levy Road
Atlantic Beach, FL 32233
(904) 241-4416 (904) 241-4427 fax
<image001.jpg> <image003.jpg>
danny@rpcgc.com<mailto:danny@rpcgc.com>
www.rpcgc.com<http://www.rpcgc.com/>
This e-mail is intended for the addressee shown. It contains information that is confidential and protected from disclosure. Any review, dissemination or use of this transmission or
its contents by persons or unauthorized employees of the intended organizations is strictly prohibited.
From: Arlington, Daniel [mailto:darlington@coab.us]
Sent: Friday, February 06, 2015 7:54 AM
To: Danny Rodrigues
Cc: Jones, Mike; Hubsch, Jeremy
Subject: RE: ABCC CO Close Out
Danny,
That sounds good. I would like either Mike Jones or me to be there with the Health Dept.
Please call me when you know what time they will be there.
Dan Arlington
239-7303
From: Danny Rodrigues [mailto:Danny@rpcgc.com]
Sent: Thursday, February 05, 2015 10:54 AM
To: Arlington, Daniel
Subject: FW: ABCC CO Close Out
Dan,
Just wanted to keep you in the loop on what my conversation was with Donna, Doug and Jeremy with City of AB. Please see email below.
Regards
Danny Rodrigues
Project Manager
RPC General Contractors, Inc.
248 Levy Road
Atlantic Beach, FL 32233
(904) 241-4416 (904) 241-4427 fax
<image009.jpg> <image010.jpg>
danny@rpcgc.com<mailto:danny@rpcgc.com>
www.rpcgc.com<http://www.rpcgc.com/>
This e-mail is intended for the addressee shown. It contains information that is confidential and protected from disclosure. Any review, dissemination or use of this transmission or
its contents by persons or unauthorized employees of the intended organizations is strictly prohibited.
From: Danny Rodrigues
Sent: Thursday, February 05, 2015 10:10 AM
To: Doug Maier
Cc: 'Leed Silverfield' (lsilverfield@bellsouth.net<mailto:lsilverfield@bellsouth.net>); Rick Wood (rwood@wooddev.net<mailto:rwood@wooddev.net>); 'kellmore@comcast.net<mailto:kellmore@comcast.net>';
Bob Perrett; Jennifer Snow
Subject: ABCC CO Close Out
Men,
I have spoken with the four major departments with the City of AB to receive a CO on the Club House Building.
1. Dan Arlington (Building)
2. Doug Layton (Public Works)
3. Jeremy (Zoning)
4. Donna Kaluzniak (Public Utilities)
As you know we have our final Pool Inspection tomorrow with the State Health Department. I spoke with Dan Arlington about this and he stated that if we have the inspection early enough
in the day then he will come out in the afternoon to do the Final CO inspection on the Building. If not then he will do his inspection on Monday 2-9-15.
Dan stated that the other 3 departments (mentioned above) had to sign off on the CO as well before he will issue. I spoke with Doug and Jeremy said they will be good with signing
off on the CO for the building but stated they still need to do all the property inspections for the Completion Of Development (roads, landscaping, etc.).
Donna informed me that we need to do a Cross Water Connection inspection (where the City comes out and inspects to make sure the potable and re-used water is not cross connected).
She gave me Malcolm’s contact with the City of AB who will be conducting the inspection. Upon speaking with Malcolm he stated that they will have to shut the water off to the building
and test all of the irrigation lines with pressure gauges. He told me that Tuesday @ 2:00 pm would be the earliest we could do the inspection due to him having to schedule a special
crew for the inspection. I told him to put us on the schedule so that we could close out the CO for the building. This is required for a Building CO.
He wanted to make sure all irrigation was complete and said that it would be wise if we have our irrigation guys there for the inspection?
As of right now the inspection is scheduled for Tuesday 2-10-15 @ 2:00pm.
Please let me know if this all works for you?
Regards
Danny Rodrigues
Project Manager
RPC General Contractors, Inc.
248 Levy Road
Atlantic Beach, FL 32233
(904) 241-4416 (904) 241-4427 fax
<image011.jpg> <image012.jpg>
danny@rpcgc.com<mailto:danny@rpcgc.com>
www.rpcgc.com<http://www.rpcgc.com/>
This e-mail is intended for the addressee shown. It contains information that is confidential and protected from disclosure. Any review, dissemination or use of this transmission or
its contents by persons or unauthorized employees of the intended organizations is strictly prohibited.