ABCC site plans - 4Doug, Freddie says the outfall pipe from Public Works to the SW pond (new pond designation SWMF 5) is completely buried and the Supervisor working piping installation in the vicinity didn’t know it existed. Please have pipe exposed and extended if necessary to reach new pond site. Alex, any progress on easements discussed at the Feb. 6th meeting (expanding the north side water line easement to 20’ and adding a 20’ easement for this outfall pipe)? Will this be included in the Plat submission discussed a couple of weeks ago? Thanks, Rick Ricky L. Carper, P.E. Public Works Director/City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper@coab.us<mailto:rcarper@coab.us> PH: (904) 247-5834 Fax: (904) 247-5843 Florida Public Works - First to Respond, Last to Leave www.apwaflorida.com<http://www.apwaflorida.com> From: Carper, Rick Sent: Thursday, February 06, 2014 1:27 PM To: Kaluzniak, Donna; Lyon, Mark Cc: Walker, Chris; Brown, Emmanuel Subject: RE: 24" water main Donna & Mark, discussed expanding this easement to 20’, and adding a 20’ easement along the storm sewer for the PW outfall at the meeting with Rick Woods and Glynn Taylor. They said should not be a problem and Alex Acree would look into it. Rick Ricky L. Carper, P.E. Public Works Director/City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper@coab.us<mailto:rcarper@coab.us> PH: (904) 247-5834 Fax: (904) 247-5843 Florida Public Works - First to Respond, Last to Leave www.apwaflorida.com<http://www.apwaflorida.com> Thanks, Donna From: Alex Acree [mailto:Alex.Acree@taylorandwhite.com] Sent: Friday, February 14, 2014 10:31 AM To: Kaluzniak, Donna Cc: Doug Maier; john@jcollinsengineering.com<mailto:john@jcollinsengineering.com>; Glynn Taylor; Townsend, Tim Subject: RE: ABCC site plans Donna, Per COAB as-builts of the utilities along the western property line there should not be a conflict with the construction of SWMF-2, however additional fiber optic lines have been located outside of the existing 20’ Utility Easement that are not depicted on the as-builts. Further information may be needed in this area. COAB is currently locating the 24” Water Main that runs along the northeast property line as it was also not located on the as-builts. If the treatment basins are in conflict with the existing 24” WM we will reshape as necessary to avoid conflict. Thanks, Alex R. Acree, P.E. Project Engineer - Taylor & White, Inc. 9556 Historic Kings Road S., Suite 102 - Jacksonville, Florida 32257 t: (904) 346-0671 - f: (904) 346-3051 - m: (904) 874-2307 www.TaylorandWhite.com<http://www.taylorandwhite.com/> - Alex.Acree@TaylorandWhite.com<mailto:Alex.Acree@TaylorandWhite.com> From: Kaluzniak, Donna [mailto:dkaluzniak@coab.us] Sent: Friday, February 14, 2014 8:42 AM To: Alex Acree Cc: Doug Maier; john@jcollinsengineering.com<mailto:john@jcollinsengineering.com>; Glynn Taylor; Townsend, Tim Subject: FW: ABCC site plans Alex, I am not expert at reading these drainage maps or golf course design, but need to ensure there is no conflict with the utility easements on the west and north for the force mains and 24” water main. Would you check please? Thanks, Donna Donna Kaluzniak, Utility Director City of Atlantic Beach 902 Assisi Lane Atlantic Beach, FL 32233 (904) 270-2535 dkaluzniak@coab.us<mailto:dkaluzniak@coab.us> From: Townsend, Tim Sent: Friday, February 14, 2014 8:25 AM To: Kaluzniak, Donna Subject: ABCC site plans Donna, FYI. If I’m reading correctly, on Sheet #4 of the Taylor & White prints the excavations SWMF-2, and TB-11, TB-12 pose potential conflicts with either are force mains or the 24” water main from #2 WTP. TNT